My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
220 OLYMPIC BLVD VA OUTPATIENT CLINIC 2023-02-09
>
Address Records
>
OLYMPIC BLVD
>
220
>
VA OUTPATIENT CLINIC
>
220 OLYMPIC BLVD VA OUTPATIENT CLINIC 2023-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:56:55 PM
Creation date
2/9/2023 3:01:49 PM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
220
Tenant Name
VA OUTPATIENT CLINIC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
871
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> • Conduct a field survey of buildings, particularly older buildings, and other industrial areas to 11 <br /> locate storm drains from buildings and paved surfaces. Note where these discharge. <br /> • During non-stormwater conditions, inspect each storm drain for non-stormwater discharges. <br /> Record the locations of all non-stormwater discharges. Include all permitted discharges. <br /> • If useful, prepare a map of each area. Show on the map the known location of storm sewers, 1 <br /> sanitary sewers, and permitted and unpermitted discharges.Aerial photos may be useful. <br /> Check records such as piping schematics to identify known side sewer connections and show <br /> these on the map.Consider using smoke, dye,or chemical analysis tests to detect con- <br /> nections between two conveyance systems(e.g., process water and stormwater). If desir- <br /> able,conduct TV inspections of the storm drains and record the footage on videotape. <br /> • Compare the observed locations of connections with the information on the map and revise <br /> the map accordingly. Note suspect connections that are inconsistent with the field survey. <br /> • Identify all connections to storm sewers or to surface water and take the actions specified <br /> above as applicable BMPs. <br /> S453 BMPs for Formation of a Pollution Prevention <br /> Team <br /> i <br /> The pollution prevention team should be responsible for implementing and maintaining all BMPs and <br /> treatment for the site.This team should be able to address any corrective actions needed on site to <br /> mitigate potential stormwater contamination.The team members should: I <br /> • Consist of those people who are familiar with the facility and its operations. <br /> • Possess the knowledge and skills to assess conditions and activities that could impact storm- I <br /> 9 P <br /> water quality at your facility,and who can evaluate the effectiveness of control measures. <br /> • Assign pollution prevention team staff to be on duty on a daily basis to cover applicable perI <br /> - <br /> mittee facilities when those facilities are in operation. <br /> • Have the primary responsibility for developing and overseeing facility activities necessary to <br /> comply with stormwater requirements. <br /> • Have access to all applicable permit, monitoring, SWPPP,and other records. <br /> • Be trained in the operation, maintenance and inspections of all BMPs and reporting pro- <br /> cedures. <br /> • Establish responsibilities for inspections, operation, maintenance,and emergencies. <br /> • Regularly meet to review overall facility operations and BMP effectiveness. <br /> I <br /> I <br /> 2019 Stormwater Management Manual for Western Washington <br /> Volume IV-Chapter 1 -Page 498 <br />
The URL can be used to link to this page
Your browser does not support the video tag.