My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
220 OLYMPIC BLVD VA OUTPATIENT CLINIC 2023-02-09
>
Address Records
>
OLYMPIC BLVD
>
220
>
VA OUTPATIENT CLINIC
>
220 OLYMPIC BLVD VA OUTPATIENT CLINIC 2023-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:56:55 PM
Creation date
2/9/2023 3:01:49 PM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
220
Tenant Name
VA OUTPATIENT CLINIC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
871
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 <br /> PROJECT OVERVIEW <br /> EXISTING IMPROVEMENTS <br /> The project is located at 220 Olympic Boulevard in Everett, Washington. The site is <br /> approximately 2.26 acres and is currently occupied by a multi-tenant commercial retail building, <br /> produce stand, espresso stand, and associated parking lot. The existing building will be <br /> demolished as part of this redevelopment. <br /> PROPOSED IMPROVEMENTS <br /> The proposed development consists of a new two-story+/-29,066 sf outpatient medical clinic, a <br /> reconfigured surface parking lot, landscaping improvements, underground utilities, and associated <br /> right-of-way improvements.The total area of disturbance is 2.42 acres, including the right-of-way <br /> improvement areas. <br /> DESIGN CRITERIA <br /> The stormwater management facilities have been designed to meet the 2019 Department of <br /> Ecology Stormwater Management Manual for Western Washington ("2019 Manual") as <br /> referenced by the City of Everett Stormwater Management Manual and City of Everett Design <br /> 111 and Construction Standards and Specifications. Stormwater discharges shall match developed <br /> discharge durations to predeveloped durations for the range of predeveloped discharge rates <br /> from 50 percent of the 2-year recurrence interval peak flow up to the full 50-year peak flow. <br /> The pre-developed condition to be matched shall be a forested land cover, except for grind and <br /> overlay areas that will remain in the developed condition. <br /> 2019 MANUAL REQUIREMENTS <br /> Duration Analysis: Standard Flow Control - <br /> IIMatch discharge durations from 50% <br /> of the 2-year peak flow up to the 50- <br /> year peak flow <br /> Water Quality Menu: Enhanced Water Quality <br /> Downstream Analysis: Level 1 (% mile downstream) <br /> NAVIX Everett VA Clinic—Everett, WA 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.