My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
220 OLYMPIC BLVD VA OUTPATIENT CLINIC 2023-02-09
>
Address Records
>
OLYMPIC BLVD
>
220
>
VA OUTPATIENT CLINIC
>
220 OLYMPIC BLVD VA OUTPATIENT CLINIC 2023-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:56:55 PM
Creation date
2/9/2023 3:01:49 PM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
220
Tenant Name
VA OUTPATIENT CLINIC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
871
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> Minimum Requirement#5: On-site Stormwater Management <br /> Projects shall employ On-site Stormwater Management BMPs in accordance with the following <br /> projects thresholds, standards, and lists to infiltrate, disperse, and retain stormwater runoff onsiteI <br /> to the extent feasible without causing flooding or erosion impacts. <br /> Response:See Figure 1-3.3 from the 2019 Manual for the Flow Chart to determine MinimumI <br /> Requirement#5 requirements. <br /> I <br /> Figure 1-3.3: Flow Chart for Determining MR#5 Requirements <br /> Does the entire project queify as Flow Control exempt(per MR 107)?1I <br /> Yes <br /> Old the project developer choose to Does the project trigger , <br /> ch <br /> to LID Performer**Standen'? only Ms*1-05?(Per ( M the project oiAside <br /> orl <br /> the Project Thresholds m MRa th-'s) 4 .uGAonaPsrcsla <br /> No Appibility of the is 5 acres or <br /> • Minimum Requirements <br /> Yes Sec ). <br /> REQUIRED:For each _ <br /> surface,consider the BMPs Yes <br /> in the order dated in List etaEl I <br /> for that type of surface.Use T <br /> the first BMP that is Did the project <br /> considered feasible. developer choose to <br /> meet the UD T Yes <br /> NOT REQUIRED: Performance Did the prod <br /> Achievement of the UD Standard? developer choose <br /> Performance Standard. ziomeet the UD <br /> Performance <br /> S ind d?es Ya <br /> REQUIRED:For each <br /> surface.consider the <br /> BMPs in the order <br /> listed in Litt 81 for Met I <br /> type of surface.Use <br /> the first BMP that Is <br /> considered feasible. <br /> NOT REQUIRED: <br /> Adhisvenernt of to UD <br /> Pert enteric'Standrd. <br /> —L REQUIRED:Meet the UD <br /> REQUIRED:Meet the LID Performance REQUIRED:For each Performance Stasnderd through <br /> Standard trough the use of any Flow Control surface,consider to BMPs the use of any Flow Control <br /> I <br /> BMP(s)In this nwhue. In the order baled in Lbt 02 SMP(s)in this manual. <br /> for that type of surface.Use <br /> REQUIRED:Apply BMP T5.13 Poet the first BMP but w REQUIRED:Apply BMP T5.13 <br /> Construction Soil Quality and Depth. considered feasible Sol Quality <br /> and Depth. I <br /> NOT REQUIRED:Applying the SIP$In Liss NOT REQUIRED: <br /> Achievement of the LID NOT REQUIRED: the <br /> /1,N2,or atf3. Performance Slsndard. MP.In Usts 01,NZ or#33. <br /> 11111 Flow Chart for Determining MR#5 <br /> RequirementsI <br /> DEPARTMENT OF Revised March 2019 <br /> ECOLOGY' Pleas see,dpirM,whh,ecy wegov/oop,,dghtNbni for oopyrtght notice Incising permissions. ' <br /> State of Washington NmMadorn of Neblllty,end dbdalmar. I <br /> I <br /> NAVIX Everett VA Clinic—Everett, WA 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.