Laserfiche WebLink
I <br /> I <br /> Minimum Requirement#5: On-site Stormwater Management <br /> Projects shall employ On-site Stormwater Management BMPs in accordance with the following <br /> projects thresholds, standards, and lists to infiltrate, disperse, and retain stormwater runoff onsiteI <br /> to the extent feasible without causing flooding or erosion impacts. <br /> Response:See Figure 1-3.3 from the 2019 Manual for the Flow Chart to determine MinimumI <br /> Requirement#5 requirements. <br /> I <br /> Figure 1-3.3: Flow Chart for Determining MR#5 Requirements <br /> Does the entire project queify as Flow Control exempt(per MR 107)?1I <br /> Yes <br /> Old the project developer choose to Does the project trigger , <br /> ch <br /> to LID Performer**Standen'? only Ms*1-05?(Per ( M the project oiAside <br /> orl <br /> the Project Thresholds m MRa th-'s) 4 .uGAonaPsrcsla <br /> No Appibility of the is 5 acres or <br /> • Minimum Requirements <br /> Yes Sec ). <br /> REQUIRED:For each _ <br /> surface,consider the BMPs Yes <br /> in the order dated in List etaEl I <br /> for that type of surface.Use T <br /> the first BMP that is Did the project <br /> considered feasible. developer choose to <br /> meet the UD T Yes <br /> NOT REQUIRED: Performance Did the prod <br /> Achievement of the UD Standard? developer choose <br /> Performance Standard. ziomeet the UD <br /> Performance <br /> S ind d?es Ya <br /> REQUIRED:For each <br /> surface.consider the <br /> BMPs in the order <br /> listed in Litt 81 for Met I <br /> type of surface.Use <br /> the first BMP that Is <br /> considered feasible. <br /> NOT REQUIRED: <br /> Adhisvenernt of to UD <br /> Pert enteric'Standrd. <br /> —L REQUIRED:Meet the UD <br /> REQUIRED:Meet the LID Performance REQUIRED:For each Performance Stasnderd through <br /> Standard trough the use of any Flow Control surface,consider to BMPs the use of any Flow Control <br /> I <br /> BMP(s)In this nwhue. In the order baled in Lbt 02 SMP(s)in this manual. <br /> for that type of surface.Use <br /> REQUIRED:Apply BMP T5.13 Poet the first BMP but w REQUIRED:Apply BMP T5.13 <br /> Construction Soil Quality and Depth. considered feasible Sol Quality <br /> and Depth. I <br /> NOT REQUIRED:Applying the SIP$In Liss NOT REQUIRED: <br /> Achievement of the LID NOT REQUIRED: the <br /> /1,N2,or atf3. Performance Slsndard. MP.In Usts 01,NZ or#33. <br /> 11111 Flow Chart for Determining MR#5 <br /> RequirementsI <br /> DEPARTMENT OF Revised March 2019 <br /> ECOLOGY' Pleas see,dpirM,whh,ecy wegov/oop,,dghtNbni for oopyrtght notice Incising permissions. ' <br /> State of Washington NmMadorn of Neblllty,end dbdalmar. I <br /> I <br /> NAVIX Everett VA Clinic—Everett, WA 10 <br />