Laserfiche WebLink
L.EVERETTPUBLIC <br />3200 Cedar Street, <br />Everett WA 98201 <br />(425) 257-8800 <br />Contractor: Northwest Construction <br />Project: Port of Everett Combined Sewer Main <br />Estimate: 5 <br />W.O.# UP3768 <br />Ends: 08/12/2022 <br />FINAL <br />Retainage not withheld <br />per Retainage Bond <br />SCHEDULE <br />A <br />Total <br />Date: <br />Date: <br />CONTRACT ESTIMATE VOUCHER <br />Schedule: A <br />Lir CM Check: <br />='f 2 q.(totz. <br />PM Revi= <br />$ <br />ORG. <br />CONTRACT <br />4,551,566.85 <br />UPDATED <br />$ <br />4,554,826.13 <br />WITH <br />TAX <br />UPDATED <br />$ <br />8,978,062.11 <br />CO <br />+ <br />TAX <br />TO <br />$ <br />8,974,814.64 <br />DATE <br />VARIANCE <br />$ <br />(3,247.47) <br />$ 4,551,566.85 <br />$ 4,554,826.13 <br />$ 8,978,062.11 <br />$ 8,974,814.64 <br />$ <br />(3,247.47) <br />ITEM # ITEM DESCRIPTION <br />UNIT <br />UNIT PRICE <br />Mobilization <br />CONTRACT <br />QUANTITY <br />CONTRACT <br />TOTAL <br />UPDATED WITH <br />CO & MOH <br />QUANTITY <br />UPDATED WITH <br />CO & MOH <br />TOTAL <br />Date: e/za/zazz <br />Date: <br />TOTAL <br />LESS RETENTION <br />SALES TAX <br />UPDATED SALES TAX <br />AMOUNTS PAID <br />DUE THIS ESTIMATE <br />zite,&.2ze <br />5.0% <br />9.8% <br />9.9% <br />Recommended By: <br />PW Director:lin------Le" <br />DATE <br />PREVIOUS <br />PRESENT <br />TO <br />$ 8,167,152.59 <br />$ 4,569,864.60 <br />$ 3,597,287.99 <br />$ <br />(408,357.63) <br />$ <br />(228,493.23) <br />$ <br />(179,864.40) <br />$ 86,832.84 <br />$ 86,832.84 <br />$ 720,829.22 <br />$ 364,697.71 <br />$ 356,131.51 <br />$ 8,566,457.01 <br />$ 4,792,901.91 <br />$ 3,773,555.10 <br />3,773,555.10 <br />TO DATE <br />QUANTITY <br />2 Surveying <br />3 SPCC Plan <br />4 Force Account <br />5 Removal of Structures and Obstructions <br />6 Structure Excavation and Stockpiling, Incl. Haul <br />7 Clean Fill and Native Exc., Backfill, and <br />Compaction, Incl. Haul <br />8 Select Borrow, Incl. <br />9 Gravel Backfill for Pipe Zone Bedding, Incl. Haul <br />10 Remove Unsuitable Pipe Foundation Material <br />11 Replace Unsuitable Pipe Foundation Material <br />12 Disposal of Inert Fill and Debris, Including Haul <br />13 Special Industrial Waste <br />14 Hazardous Waste Disposal <br />15 Health and Safety Plan <br />16 Gravel Pad Construction <br />17 Trench Cutoff Wall <br />18 Decommission Monitoring Well <br />19 Manhole 72-In. Diam. Type 3 <br />20 Air Vacuum Valve Assembly, 2-In. <br />LS $ 347,000.00 <br />LS $ 15,000.00 <br />LS $ 600.00 <br />FA $ 1.00 <br />TON $ 1,700.00 <br />CY $ 26.00 <br />CY $ 32.00 <br />TON $ 14.00 <br />TON $ 15.00 <br />CY $ 20.00 <br />TON $ 27.00 <br />CY $ 34.00 <br />TON $ 67.50 <br />FA $ 1.00 <br />LS $ 15, 000.00 <br />SY $ 3.00 <br />EA $ 3,000.00 <br />EA $ 700.00 <br />EA $ 23,300.00 <br />EA $ 10,000.00 <br />1.00 <br />1.00 <br />1.00 <br />100,000.00 <br />100.00 <br />14,900.00 <br />3,200.00 <br />17,710.00 <br />9,110.00 <br />500.00 <br />900.00 <br />14, 600.00 <br />450.00 <br />50,000.00 <br />1.00 <br />1,350.00 <br />1.00 <br />5.00 <br />6.00 <br />1.00 <br />347,000.00 <br />$ 15,000.00 <br />$ 600.00 <br />$ 100,000.00 <br />$ 170,000.00 <br />$ 387,400.00 <br />$ 102,400.00 <br />$ 247, 940.00 <br />$ 136,650.00 <br />$ 10,000.00 <br />$ 24,300.00 <br />$ 496,400.00 <br />$ 30,375.00 <br />$ 50,000.00 <br />$ 15,000.00 <br />$ 4,050.00 <br />$ 3,000.00 <br />$ 3,500.00 <br />$ 139,800.00 <br />$ 10,000.00 <br />1.0000 <br />1.0000 <br />1.0000 <br />100,000.0000 <br />$ 347,000.00 <br />$ 15,000.00 <br />$ 600.00 <br />$ 100,000.00 <br />2,130.0000 <br />$ 3, 621, 000.00 <br />14,900.0000 <br />3,200.0000 <br />17,710.0000 <br />9,110.0000 <br />500.0000 <br />900.0000 <br />14, 600.0000 <br />387,400.00 <br />102,400.00 <br />$ 247, 940.00 <br />$ 136,650.00 <br />$ 10,000.00 <br />$ 24,300.00 <br />$ 496,400.00 <br />7,970.0000 <br />537,975.00 <br />50,000.0000 <br />1.0000 <br />1,350.0000 <br />1.0000 <br />5.0000 <br />6.0000 <br />1.0000 <br />$ 50,000.00 <br />$ 15,000.00 <br />$ 4,050.00 <br />$ 3,000.00 <br />$ 3,500.00 <br />$ 139,800.00 <br />$ 10,000.00 <br />TO DATE <br />TOTAL <br />PREVIOUS <br />QUANTITY <br />PREVIOUS <br />TOTAL <br />PRESENT <br />QUANTITY <br />PRESENT <br />TOTAL <br />1.0000 <br />1.0000 <br />1.0000 <br />32,858.4600 <br />2,296.5800 <br />11,515.4000 <br />2,881.6000 <br />24,830.5400 <br />7,680.7900 <br />242.2400 <br />526.1600 <br />11,012.7000 <br />7,962.9201 <br />1,517.6000 <br />1.0000 <br />1,350.0000 <br />1.0000 <br />0.0000 <br />6.0000 <br />1.0000 <br />347,000.00 <br />$ 15,000.00 <br />$ 600.00 <br />$ 32,858.46 <br />3,904,186.00 <br />299,400.40 <br />92,211.20 <br />$ 347,627.56 <br />115, 211.85 <br />$ 4,844.80 <br />$ 14,206.32 <br />$ 374,431.80 <br />$ 537,497.11 <br />$ 1,517.60 <br />$ 15,000.00 <br />$ 4,050.00 <br />$ 3,000.00 <br />$ 139,800.00 <br />$ 10,000.00 <br />1.0000 <br />0.8500 <br />1.0000 <br />18,510.3000 <br />1,352.7300 <br />11,296.7000 <br />2,827.0000 <br />8,296.5900 <br />7,680.7900 <br />121.1200 <br />526.1600 <br />1,230.5300 <br />4,797.1801 <br />1,517.6000 <br />0.6300 <br />1,350.0000 <br />1.0000 <br />0.0000 $ <br />6.0000 $ <br />1.0000 $ <br />347,000.00 <br />$ 12,750.00 <br />$ 600.00 <br />$ 18,510.30 <br />$ 2,299,641.00 <br />$ 293,714.20 <br />$ 90,464.00 <br />$ 116,152.26 <br />$ 115,211.85 <br />$ 2,422.40 <br />$ 14,206.32 <br />$ 41,838.02 <br />$ 323,809.66 <br />$ 1,517.60 <br />$ 9,450.00 <br />$ 4,050.00 <br />$ 3,000.00 <br />139,800.00 <br />10,000.00 <br />0.0000 <br />0.1500 <br />0.0000 $ <br />14,348.1600 <br />943.8500 <br />218.7000 <br />54.6000 <br />2,250.00 <br />IMOD <br />$ 14,348.16 <br />$ 1,604,545.00 <br />$ 5,686.20 <br />$ 1,747.20 <br />16,533.9500 $ 231,475.30 <br />0.0000 $ <br />121.1200 $ 2,422.40 <br />0.0000 $ <br />9,782.1700 $ 332,593.78 <br />3,165.7400 $ 213,687.45 <br />0.0000 $ - <br />0.3700 $ 5,550.00 <br />0.0000 $ <br />0.0000 $ <br />0.0000 $ <br />0.0000 $ <br />0.0000 $ <br />