My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/02/08 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/02/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2023 9:05:34 AM
Creation date
2/10/2023 8:35:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF COMPLETION <br />Project: Port of Everett Combined Sewer Main Improvements <br />Contractor: Northwest Construction Inc. <br />Work Order No. UP-3768 <br />The above -mentioned project was constructed per the plans and specifications and <br />to the satisfaction of the Public Works Department. <br />The Contractor physically completed the project, within the time allowed in the <br />contract. <br />It is recommended that the City accept this project as complete. <br />Recommended by: <br />23 -?0z:, <br />Pub c Works Director Date <br />Ryan Sass <br />Approved by: <br />Mayor, City of Everett Date <br />Cassie Franklin <br />Attest: <br />City Clerk <br />Marista Jorve <br />APPROVED AS TO FORM <br />By: <br />David C. Hall, City Attorney <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.