American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 2 1 <br /> 2023 Biosolids Removal UT 3808 - 2 <br /> Sum, additional compensation that the Contractor attempts to pass through or assert against the Owner, or <br /> claims against the Owner arising out of a third party's claim against the Contractor. <br /> Contract Sum: The price in dollars stated in the Contract to be paid by the Owner to the Contractor for 111 <br /> the Work described in the Contract Documents, as modified by any Change Orders. <br /> Contract Time: The duration of the Project as stated in the Contract and as modified by any Change <br /> Orders. <br /> Contractor: The individual or entity with whom Owner has entered into the Agreement. <br /> Day: Calendar day,unless explicitly stated otherwise. I <br /> Delay: Any increase of the duration of the critical path of the Project. <br /> Dispute: Any controversy or disagreement. , <br /> Drawings: That part of the Contract Documents that graphically shows the scope, extent, and character of <br /> the Work to be performed by Contractor. Shop Drawings and other Contractor Submittals are not <br /> Drawings as so defined. I <br /> Effective Date of Agreement: See 18.10 EFFECTIVE DATE. <br /> Engineer: An individual or entity retained by the Owner to be the Owner's representative with regard to <br /> matters of design intent. The terms"Owner's Representative","Engineer"and"Architect"are <br /> interchangeable. <br /> Equipment: Mechanical, electrical,instrumentation,or other devices with one or more moving parts, or <br /> devices requiring an electrical,pneumatic, electronic,or hydraulic connection. <br /> Extended Overhead: The increase in Overhead costs attributable to an extension of Contract Time. <br /> Extra Work: Providing materials and Equipment and the performance of Work not directly called for in, , <br /> or implied by,the Contract Documents, such that Contractor would be entitled to an adjustment of <br /> Contract Sum and possibly an extension of Contract Time. <br /> Field Order: A written order issued by Owner's Representative that requires minor changes in the Work, <br /> but does not involve a change in the Contract Sum or the Contract Time. <br /> Final Acceptance: Formal action by Everett City Council determining that all of the Contractor's Work <br /> has been completed,except for any landscaping maintenance. <br /> Float: The amount of time between the early start date and the late start date, or the early finish date and <br /> the late finish date of any activity in the project schedule. I <br /> Force Account: Costs of performing Work as defined in 9.6. FORCE ACCOUNT. <br /> Furnish,Install,Perform,Provide, Supply: The word "Furnish" or the word"Install" or the word <br /> "Perform" or the word"Provide" or the word"Supply," or any combination or similar directive or usage <br /> thereof, shall mean furnishing and incorporating in the Work including all necessary labor,materials, <br /> equipment, and everything necessary to perform the Work indicated,unless specifically limited in the <br /> context used. , <br /> General Conditions: This Section 007200 of the Contract Documents. <br /> May: Conduct that is permitted, but not required. I <br /> Milestone: A principal event specified in the Contract documents relating to an intermediate completion <br /> date or time prior to Substantial Completion of all the Work. <br /> Notice: A signed,written communication by the Contractor to the Owner as described in ARTICLE 10. <br /> NOTICE TO OWNER. <br /> Notice of Award: The written notice from the City of Everett to the successful Bidder signifying the <br /> City's acceptance of the Bid. No Contract is formed until the Effective Date. <br /> 00 7200 - 2 GENERAL CONDITIONS 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.