American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 15 <br /> 2023 Biosolids Removal UT 3808 - 2 <br /> 4.5.2. Suggestions to Contractor <br /> Nothing in these Contract Documents requires the Owner's Representative to provide the Contractor with <br /> direction or advice on how to do the Work, construction practices, or means and methods. If the Owner's <br /> Representative approves, suggests or recommends any construction practice,means,method or manner <br /> for doing the Work or producing materials,the approval or recommendation shall not: (A)guarantee that <br /> following the method or manner will result in compliance with the Contract Documents; (B)relieve the <br /> Contractor of any risks or obligations under the Contract Documents; or(C) create any liability by the <br /> Owner to the Contractor. <br /> ' Suggestions as to the plans or methods of accomplishing the Work or Contract requirements by the <br /> Owner or the Owner's Representative to the Contractor but not specified or required, if adopted or <br /> followed by the Contractor in whole or in part,shall be used at the risk and responsibility of the <br /> ' Contractor. The Owner and the Owner's Representative assume no responsibility therefor and in no way <br /> will be held liable for any defects in the Work which may result from or be caused by use of such plan or <br /> method or Work. <br /> ' 4.5.3 Meetings with Owner <br /> The Contractor shall have its duly authorized representative attend periodic informational meetings with <br /> the Owner's Representative and City staff, as reasonably required by the Owner. <br /> Contractor, Owner, and Owner's Representative shall meet as often as determined by the Owner's <br /> Representative,but no less often than once each month. The purpose of the meeting is to review Project <br /> ' status in relation to the construction schedule;review value of Work completed during the previous <br /> month; and, if applicable,review Contractor's plans to return Project status to that required by the <br /> schedule. If requested by the Owner or Owner's Representative,the Contractor shall submit a written <br /> progress report within five(5) days following this meeting, comprising: <br /> 1. The current construction schedule indicating percent complete,actual completion or start dates <br /> since the previous review,the estimated remaining duration for each activity in progress, <br /> Schedule of Values update, and narrative summary. <br /> 2. Reasons any activities are behind schedule and the corrective steps being taken. <br /> 4.5.4. Cooperation with Others <br /> ' The Contractor agrees to permit entry to the Site of the Work by the Owner,its employees or other <br /> contractors performing work on behalf of the Owner. The Contractor shall afford to the Owner,other <br /> contractors and their employees,reasonable facilities and cooperation and shall arrange its work and <br /> dispose of its materials in such a manner as to not interfere with the activities of the Owner or of others <br /> upon the Site of Work. The Contractor shall promptly make good any Contractor-caused injury or <br /> damage to persons or property that may be sustained by other contractors or employees of the Owner. <br /> ' The Contractor shall join its work to that of others and perform its work in proper sequence in relation to <br /> that of others. <br /> If requested by the Contractor,the Owner will arrange meetings with other contractors performing work <br /> ' on behalf of the Owner to plan coordination of construction activities. The Contractor shall inform itself <br /> of the planned activities of other contractors and will coordinate its work with the other contractors. <br /> ' Contractor shall notify the Owner of problems,interference or any difficulty with other contractors or <br /> workers engaged by the Owner. The Notice shall be sufficiently prompt and specific so as to allow the <br /> Owner to mitigate or avoid increased costs,time of performance,damages or injury. Contractor's failure <br /> to provide such Notice in a timely way shall be deemed a waiver and release of any and all Contract <br /> ' Claims relating to, arising out of,or caused by, any alleged interference, difficulty or problem with <br /> another contractor or worker engaged by the Owner. <br /> ' 00 7200 - 15 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.