My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iCity of Everett 00 7200 - 49 <br /> 2023 Biosolids Removal UT 3808 - 2 <br /> 13. DISPUTES <br /> ' 13.1 RESOLUTION <br /> When a Dispute occurs during a Contract,the Contractor shall pursue resolution through the Owner's <br /> Representative. The Contractor shall follow the procedure stated in 12. CONTRACT CLAIMS herein <br /> and 5.2.2.2 Extensions of Contract Time for issues regarding the schedule and Contract Time. Timely <br /> and adequate Notice is a condition precedent to a Contract Claim. Timely and complete submission of a <br /> Contract Claim is a condition precedent to any entitlement by the Contractor to an adjustment of Contract <br /> ' Sum or Contract Time. Unless waived by the Owner,mediation is a condition precedent to the filing of <br /> any lawsuit, action or proceeding that seeks to recover on a Contract Claim,whether in whole or in part. <br /> 13.2 CONTINUING THE WORK <br /> iContractor shall carry on the Work and adhere to the schedule during all disputes or disagreements with <br /> Owner. No Work shall be delayed or postponed pending resolution of Disputes or disagreements, except <br /> as permitted by paragraph 15.04 or as Owner and Contractor may otherwise agree in writing. <br /> 14. TIME LIMITATIONS AND JURISDICTION <br /> The parties intend that all Claims and Disputes be dealt with promptly and expeditiously when they arise. <br /> The parties intend that all Claims and Disputes be resolved quickly and expeditiously and desire to avoid <br /> claims and Disputes that relate back to events or Work occurring months before. The parties desire to <br /> avoid litigation and the costs and expense of Claims and Disputes at the end of the Project. <br /> Any Contract Claim for adjustment of Contract Sum or Contract Time, or any Dispute or Contract Claim <br /> of any kind whatsoever,must be submitted,if at all,to the Owner or Owner's Representative no later than <br /> thirty(30) days after Notice was first required to be given by the Contractor as provided in ARTICLE <br /> 10. NOTICE TO OWNER. Failure to submit a Contract Claim within the thirty(30) days of the date <br /> Notice was required pursuant to ARTICLE 10.NOTICE TO OWNER constitutes a complete waiver of <br /> and bar to the Contract Claim, and Contractor is estopped from later asserting a Contract Claim or seeking <br /> any relief or remedy relating to the Dispute for which it failed to submit a Claim. <br /> Contractor may not sue, cross-claim, claim, or bring any action of any kind whatsoever against the Owner <br /> on any Contract Claim or Dispute after the expiration of one hundred eighty(180)days from Physical <br /> Completion. <br /> Any alleged cause of action by Owner or Contractor as to any acts or failures to act occurring prior to <br /> Substantial Completion shall be deemed to have accrued in any and all events not later than such date of <br /> Substantial Completion. <br /> 15. LIABILITY AND INSURANCE <br /> 15.1 GENERAL <br /> ' Contractor bears all risk of loss,casualty or damage to installed Work prior to Final Acceptance, <br /> irrespective of whether the Owner has taken possession of the Project in whole or in part and <br /> notwithstanding the existence or availability of insurance or the insurance coverages required by the <br /> Contract Documents. <br /> 15.2 BONDS <br /> 15.2.1 Payment and Performance Bonds <br /> The Contractor shall provide a payment bond and a performance bond, each in the amount of 100 percent <br /> of the Contract Sum in the form required by the Contract. This bond shall serve as security for the <br /> faithful performance of the Work and as security for the faithful payment and satisfaction of the persons <br /> 00 7200 - 49 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.