My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cityof Everett <br /> 01 2213 - 2 <br /> 2023 Biosolids Removal UT 3752-30 <br /> of the Work during the duration of the Contract. This lump sum price shall <br /> not exceed 10% of the total of all bid items. <br /> 2. Payment <br /> a. When 5% of the original Contract amount is earned from other bid <br /> items, 40% of the amount bid for Mobilization and Demobilization, or <br /> 5% of the original Contract amount, whichever is lesser, will be paid. <br /> b. Upon completion of work for the project, payment of the remaining <br /> g <br /> amount bid for Mobilization and Demobilization will be paid. <br /> B. Item #2 — DECONTAMINATION OF EQUIPMENT <br /> 1. The decontamination requirement covers all aquatic vessels, machinery, <br /> and equipment that are new or have been previously used outside the City <br /> of Everett and will be used for work in any surface water body. The level of <br /> decontamination will depend on previous use, transportation, and history <br /> log. See Section 01 7400 Invasive Species Equipment Decontamination for <br /> full requirements. <br /> 2. Payment for decontamination shall be paid as a lump sum. <br /> C. Item #3 — DRY TONS BIOSOLIDS REMOVED, DEWATERED, AND PLACED <br /> ON BIOSOLIDS PAD (Unit Price) <br /> 1. For the purposes of this Contract, the Contractor shall be paid the unit price <br /> bid for Dry Tons per the amount (by weight) of solids material that is <br /> weighed and transported from the dewatering staging area to the <br /> designated location on the City's Biosolids Pad. <br /> 2. For this contract, the measurement of a Dry Ton includes the weight of only <br /> the solid material contained in each ton of material that crosses the City <br /> owned scale — the weight of the water will not be included. <br /> 3. Contractor shall weigh each truck prior to and after placing solids on the <br /> Pad, using the certified scale provided by Owner. <br /> 4. The calculation of a Dry Ton for payment shall be as per the following <br /> equation and examples: <br /> I <br /> 01 2213 - 2 UNIT PRICE MEASUREMENT <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.