My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2600 - 1 <br /> 2023 Biosolids Removal UT 3752-30 <br /> I <br /> SECTION 01 2600 - CONTRACT MODIFICATION PROCEDURES <br /> I <br /> 1.1 SUMMARY OF MODIFICATIONS PROCEDURES <br /> �i A. Changes to the Work may be required due to field conditions, requests made by <br /> the Owner, clarifications to the bid documents, or other needs that result in a <br /> change in the cost of the work and/or change in the number of contract days per <br /> 00 7200 General Conditions, Article 6. The changes to the work will be tracked <br /> individually as Request for Change Proposals (RFCP). Request for Change <br /> Proposals may either be prepared as a Field Directive, or as a request for pricing <br /> prior to proceeding with the work. <br /> B. A change order will be issued for one or more RFCP's grouped into a single <br /> change order. Payment for changed work cannot be paid until the change order <br /> is finalized and approved as outlined per 00 7200 General Conditions, Article 6. <br /> C. The Request for Change Proposal shall clearly identify all labor, material, <br /> equipment, and incidentals, including subcontractor's and supplier's invoices or <br /> quotes as well as Contractor's timecards. A reference from the latest approved <br /> schedule shall be attached justifying any time extension request. Mark ups for all <br /> overhead, profit, bond cost, B & 0 taxes, and insurance shall be added per 00 <br /> 7200. The form included at the end of this section will be used for directing the <br /> work to be done in one of the two manners described below. <br /> D. Contractor, and Subcontractors where required, shall provide a breakdown of <br /> labor costs including basic wage rates, fringe benefits, FICA, FUTA and SUCA <br /> add-ons, per 00 7200 General Conditions. Where premium time is involved, the <br /> Contractor shall provide a breakdown of costs in the same detail. <br /> 1.2 FIELD DIRECTIVE MODIFICATION PROPOSALS <br /> A. Changed conditions and/or unanticipated circumstances may require immediate <br /> revisions to Work which are essential and from which a delay would result in a <br /> time and or cost penalty to the project. When such a condition exists, the Owner <br /> shall issue a written Field Directive to the Contractor. <br /> iB. The Owner will provide direction for the Contractor identifying the necessary <br /> changes to be made. The Field Directive shall be identified with a Request for <br /> Change number. The Contractor will provide pricing per 1.1 of this section within <br /> 15 days of the completion of the work. <br /> r <br /> 01 2600 - 1 CONTRACT MODIFICATION PROCEDURES <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.