My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2973 - 5 <br /> 2023 Biosolids Removal UT 3752-30 <br /> 2. Costs associated with ongoing mobilization activities can be listed <br /> separately or distributed evenly among allocated cost for each work activity. <br /> 3. Assign overhead costs corresponding to start and finish dates for each work <br /> related activity. <br /> 4. Pro-rate associated work expenses related to work activities, including <br /> supervision, temporary utilities, and small tools, over total Contract Time. <br /> 5. Assign directly related costs, including bonds, insurance, and schedules, to <br /> appropriate work activities. <br /> 6. Claims for additional cost for storage of materials off-site are not accepted <br /> as a basis for monetary claims, except where need for off-site storage arose <br /> after the Bid and at request of the City. <br /> C. Overhead and Administrative Costs: Show the distribution of major cost items <br /> which are not a direct cost of actual work-in-place as a line item in schedule of <br /> values or provide a description of the distribution of these items as general <br /> overhead expense. <br /> 1.6 LINE ITEM CATEGORIES <br /> A. Arrange Schedule of Values in tabular form with separate columns. Break out <br /> following for each work activity listing. <br /> 1. Section Number from Project Specifications Table of Contents. <br /> 111 2. Description of Work. <br /> 3. Name of subcontractor. <br /> 4. Scheduled Value for each Item of Work. <br /> ' 5. Pervious Work Complete, including Cost Value and Percent Complete. <br /> 6. Present Work Complete, including Cost Value and Percent Complete. <br /> 7. Change Orders (numbers) that affect value. <br /> 8. Total Billing, including Billing to Date, Percent of Contract Sum, and Balance <br /> to Finish. Show dollar value as percentage of Contract Sum to nearest one- <br /> hundredth percent, adjusted to total 100 percent. <br /> 9. Retainage. <br /> 10. Stored Material. <br /> 1.7 COST CATEGORIES <br /> A. Assign following, making sum equal to total cost for each line item activity to show <br /> initial costs of work activity and total installed cost. <br /> 1. Labor. <br /> 2. Equipment. <br /> 3. Material. <br /> 4. Subcontractor. <br /> 01 2973 - 5 SCHEDULE OF VALUES <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.