My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 4200 - 1 <br /> 2023 Biosolids Removal UT 3752-30 <br /> SECTION 01 4200 - REFERENCES <br /> I <br /> 1.1 ORGANIZATION AND FORMAT OF SPECIFICATIONS <br /> A. Division and paragraph numbers, as listed in the "Table of Contents" of the <br /> Specifications Book and the Items of Work included under the headings generally <br /> conform with the "Uniform Construction Index" of the Construction Specifications <br /> Institute (C.S.I.). Numbering of paragraphs and divisions, and trade headings are <br /> merely for convenience and identification, and may not be consecutive. <br /> 1.2 NUMBER OF SPECIFIED ITEMS REQUIRED <br /> AA. Wherever in these Specifications an article, device or piece of equipment is <br /> referred to in the singular number, such reference applies to all and as many such <br /> articles as are shown on the Drawings or required to complete the installation. <br /> 1.3 SPECIFICATIONS OF MANUFACTURER <br /> A. Wherever in these Specifications an article, device or piece of equipment is <br /> referred to by the Manufacturer Model Number, Serial Number of Manufacturer's <br /> ' standard product indication, the specification of that article, device or piece of <br /> equipment shall hereby be considered to be included within these Specifications. <br /> For the purposes of substitution, such specification shall be deemed to be the <br /> basis for the City's decision for substitution approval or disapproval. No <br /> substitutions shall be considered prior to Award of the Contract. <br /> 1.4 DEFINITIONS <br /> A. The following terms are used in the Contract Documents and are defined as <br /> follows: <br /> 1. The terms "Owner" and "City" mean the same and shall be interchangeable. <br /> 2. The terms "approved" and "for approval" mean "approved by the City". <br /> 3. The term "coordinate" means "satisfactorily combine the Work of All Trades <br /> for a complete and operating installation". <br /> 4. The term "selected" means "as selected by the City." <br /> 5. The term "provide" means "furnish and install". <br /> 6. The term "City" means "City's Representative". <br /> 7. The term "directed" means "as directed by the City's Representatives". <br /> 8. Where the terms "or approved" and "or approved equal" are used, the City's <br /> ' Representative is the sole judge of the quality and suitability. <br /> 9. The term "indicated" means "as indicated in these Contract Documents". <br /> 01 4200 - 1 REFERENCES <br />► I <br />
The URL can be used to link to this page
Your browser does not support the video tag.