My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I 2023 WPCF Biosolids Removal <br /> Pre-Bid Walk Agenda <br /> I 10:30 a.m. 11/22 & 11/29 <br /> I 1. Greetings <br /> 9 <br /> a. Contractor Sign In <br /> Ib. Introductions <br /> 2. City Team Members <br /> Ia. Project Manager— Hanna Lintukorpi (hlintukorpi(cr�everettwa.gov) <br /> b. Onsite Manager— Mike Robinson <br /> c. WPCF Pant Manager— John Smit <br /> Id. WPCF Senior Wastewater Operator— Eddie Jones <br /> I 3. Project Overview <br /> a. Work Area <br /> i. Dredging — Recirculation Channel (see map) <br /> ii. Solids handling - Biosolids Pad <br /> iii. Water <br /> 1. The Biosolids Pad has potable (2) water available. <br /> I Contractor is responsible for determining if this water source <br /> is adequate for their operational needs. Any additional water <br /> use shall be the responsibility of the contractor. <br /> I 2. The City has non-potable (3) water at the WPCF site for wash <br /> down and site cleaning. <br /> iv. Power <br /> I 1. City has provided 1200-amp 3-phase power to the Biosolids <br /> Pad. Electrical power is available via three 300 amp and one <br /> 150 amp terminals. Quick disconnects and ground fault <br /> I protection are not provided. Any additional electrical power <br /> needs shall be the responsibility of Contractor. <br /> 2. Contractor is responsible for providing licensed and qualified <br /> I personnel to connect to power as well as all necessary <br /> equipment. <br /> 3. All lighting must be provided by the Contractor as necessary. <br /> I v. Contractor must provide temporary restroom facilities <br /> b. Access <br /> i. Access site through Biosolids gate <br /> I ii. Daily sign in at WPCF Main building <br /> iii. Contractor to secure gate at end of day <br /> iv. Contractors will be sharing the use of pad and the scale <br /> I v. Work site available between 6:00 — 10:30 seven days a week <br /> 1. Noise Ordinance - 7:00 AM to 10:00 PM on weekdays, 8:00 <br /> AM to 6:00 PM on weekends and state holidays <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.