My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICity of Everett 00 7200 - iii <br /> 2023 Biosolids Removal UT 3808 - 2 <br /> II8.1. General 26 <br /> 8.2. Product Data 27 <br /> I 8.3. Quality 27 <br /> 8.4. Material and Equipment Specified by Name 27 <br /> 8.5. Requests for Substitution 27 <br /> I8.6. Demonstration of Compliance with Contract Requirements 27 <br /> 8.6.1. Inspection 27 <br /> 8.6.2. Samples of Materials 28 <br /> 1 8.6.3. Certification 28 <br /> 8.6.4. Inspection at Point of Manufacturing 28 <br /> I 8.6.5. Testing and Commissioning of Completed Work 28 <br /> 8.6.6. Storage of Materials and Equipment 28 <br /> 8.6.7. Manufacturer's Directions 29 <br /> I 8.7. Defective Work 29 <br /> 8.7.1. Correction of Defective Work 29 <br /> 8.7.2. Retention of Defective Work 29 <br /> 8.8. Materials and Equipment Furnished by Owner 29 <br /> 8.9. Guarantee 30 <br /> 8.10. Correction Period 30 <br /> I <br /> 9. MEASUREMENT AND PAYMENT 31 <br /> 9.1. Payments to Contractor 31 <br /> I 9.1.1. Schedule of Values 31 <br /> 9.1.2. Progress Payments 31 <br /> 9.1.2.1 Payment Request Procedures: 31 <br /> I 9.1.2.2 Review Procedures: 31 <br /> 9.1.2.3 Retained Percentage 32 <br /> 9.1.2.4 Withholding 32 <br /> I9.1.3. Final Payment 32 <br /> 9.2. Payment for Changes 33 <br /> 9.2.1. Changes in Estimated Quantities of Unit Price Work 33 <br /> I9.2.1.1. Increased Quantities 33 <br /> 9.2.1.2. Decreased Quantities 34 <br /> I 9.2.1.3. Limitations 34 <br /> 9.2.2. Changes in Work Not Covered By Unit Prices 34 <br /> 9.2.3. Deleted Work 34 <br /> I 9.3. Charges to Contractor 35 <br /> 9.4. Compensation to Owner for Time Extension 35 <br /> 9.5. Adjustment of Contract Sum 35 <br /> 9.5.1 Calculation 35 <br /> 9.5.2 Limitations 36 <br /> 9.5.3 Unabsorbed and Extended Overhead 36 <br /> 1 9.6. Force Account 37 <br /> 9.6.1 Labor 37 <br /> I 00 7200 - iii <br /> GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.