My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Garner's Northwest Inc. 12/13/22 Change Order 2
>
Contracts
>
Small Works Roster Contracts and Change Orders
>
Small Works Roster Contracts and Change Orders
>
Garner's Northwest Inc. 12/13/22 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 9:04:48 AM
Creation date
2/14/2023 9:04:39 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Garner's Northwest Inc.
Approval Date
12/14/2022
Department
Procurement
Department Project Manager
Jenny Chang/Lolly Huggins
Subject / Project Title
Madison Morgan - Park Trail Improvements
Public Works WO Number
2022-066
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0003477
Total Compensation
$5,799.04
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER # <br />Project (Procurement) Number: Small Works Roster Project Title: <br />IFQ #2022-066 Madison Morgan – Park Trail Improvements <br />Description of Change: <br />BUILDING/LOCATION: Madison Morgan Park, 518 Madison Street, Everett, WA 98203 <br />ATTACHMENTS INCLUDED: Drawing of fencing and trail route <br />When the contract was awarded on September 19th, 2022, the house located at Madison Morgan Park was going to be <br />vacant until a future use was determined. On October 22, 2022, the City of Everett Community Outreach and <br />Enforcement Team (COET) originally intended office space was burned down. After the fire, this site was identified as a <br />replacement office space for the COET team. <br />Since the unforeseen building use changed, the scope of work has been adjusted to rearrange the fence line around the <br />house to provide additional security. The original scoped fence is being adjusted and will result in a trail extension of <br />approximately 120 feet. Adjustment of the fence line leaves a forty-foot unprotected gap. The solution is to provide 3- <br />man rocks, which will offer the required security. <br />The original scope included grading the path for ADA compliance. With the unforeseen new securi ty and use <br />requirements, the existing path will be graded from the sidewalk toward the house. Additionally, it will be leveled off for a <br />future rolling gate, which will be installed by City staff later. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Prior to this Change $99,145.85 Contract Time & Completion Date Prior <br />to This Change 120 <br />Completion <br />Date Prior <br />01/23/23 <br />* Net (Increase) or (Decrease) Resulting from <br />this Change+ +$5,799.04 Net (Increase) or (Decrease) Resulting <br />from this Change 0 <br />* Total Project Price Including this Change $104,944.89 Contract Time & Completion Date <br />Including This Change 120 <br />Completion <br />Date After <br />01/23/23 <br />By signing below, City of Everett and the Contractor agree that the Contract work shall be changed to the extent <br />described in the above “Description of Change” and that the compensation shown above represents complete <br />compensation for all such changes, including all direct and indirect costs and impacts. The City of Everett and the <br />Contractor further agree that Contract time shall be adjusted to the extent shown above. This Change Order only <br />changes the contract between City of Everett and the Contractor to the extent explicitly provided in this Change Order. <br />Signatures on this change order may be ink, scanned pdf signature, or other electronic means . <br />CONTRACTOR CITY OF EVERETT <br />Garner’s Northwest Landscaping <br />13807 250th Ave SE <br />Monroe, WA 98272 <br />City of Everett <br />2930 Wetmore Avenue <br />Everett, WA 98201 Date <br />Project Manager: <br />Division Manager: <br />Department Director: <br />Name & Title: City Attorney Template Approved as to Form 10.17.22 <br />Date: Mayor: <br />0002 <br />Jeffrey Garner, CEO <br />12/12/2022 <br />jeffrey <br />garner <br />Digitally signed by jeffrey garner <br />DN: cn=jeffrey garner, o, ou, <br />email=jeff@garnersnorthwest.co <br />m, c=US <br />Date: 2022.12.12 15:31:29 -08'00' <br />Lolly Huggins 12/12/2022 <br />12/13/2022 <br />12/13/2022 <br />Cassie Franklin 12/14/2022
The URL can be used to link to this page
Your browser does not support the video tag.