Laserfiche WebLink
Q SITE DEVELOPMENT NOTES <br />1. PROPOSED ON -SITE ASPHALT PAVEMENT. SEE DETAIL 1 /C7.0. <br />2. PROPOSED CONCRETE FUEL DISPENSER CANOPY SLAB. SEE <br />FUEL PLANS FOR DETAILS. SEE DETAIL 8/C7.0 FOR <br />CONNECTION TO ON -SITE ASPHALT PAVEMENT. <br />3. PROPOSED REINFORCED CONCRETE SLAB ABOVE UNDERGROUND <br />GASOLINE STORAGE TANKS (USTs). SEE TANK PLANS FOR <br />DETAILS. <br />4. PROPOSED FUELING CANOPY. CANOPY TO BE HYDRAULICALLY <br />ISOLATED AND DRAIN TO SANITARY SEWER FOLLOWING <br />TREATMENT. SEE ARCHITECTURAL PLANS FOR DETAILS.. <br />5. PROPOSED SELF-SERVICE AIR/WATER UNIT ENCLOSURE. SEE <br />ARCHITECTURAL PLANS FOR DETAILS. <br />6. PROPOSED ON -SITE CONCRETE PAVEMENT. SEE DETAIL 2/C7.0. <br />7. PROPOSED ON -SITE BARRIER CURB. SEE DETAIL 4/C7.0. <br />8. PROPOSED PARKING STALL MARKINGS SHALL BE 4" WIDE WHITE <br />PAINTED STRIPES TO DIMENSIONS. SEE DETAIL 5/C7.0 <br />9. PROPOSED PREFABRICATED KIOSK ENCLOSURE WITH RESTROOM. <br />SEE ARCHITECTURAL PLANS FOR DETAILS. <br />10. PROPOSED BOLLARDS (10 TOTAL, TYP). SEE ARCHITECTURAL <br />PLANS FOR DETAILS. <br />11. PROPOSED LANDSCAPING. SEE LANDSCAPING PLANS. <br />12. PROPOSED LOCATION OF FIRE HYDRANT. <br />13. PAVEMENT MARKINGS - 4" WIDE WHITE PAINTED STRIPES 0 2' <br />O.C/45- ANGLE. SEE DETAIL 6/C7.0. <br />14, PROPOSED NEW FUEL DISPENSER ISLAND. SEE ARCHITECTURAL <br />PLANS FOR DETAILS. <br />15, PROPOSED CONCRETE SWALE. SEE DETAIL 7/C7.0. <br />16. PROPOSED U-SHAPED BOLLARD (9 TOTAL, TYP). SEE <br />ARCHITECTURAL PLANS FOR DETAILS. <br />17. STORAGE TANK VENT STACK AND VENT RISER PAD PER TANK <br />DRAWINGS. <br />18. (1) 10,000/8,000 GALLON DUAL COMPARTMENT AND (1) <br />20,000 GALLON UNDERGROUND GASOLINE STORAGE TANKS PER <br />TANK PLANS. <br />19. PROPOSED FIRE HYDRANT CONCRETE SLAB PER CITY OF <br />EVERETT STANDARD DETAIL 508. SEE DETAIL 9/C7.0 <br />20. PROPOSED CURB CUT. SEE DETAIL 6/C7.1. <br />21. PROPOSED ACCESSIBLE PARKING STALL AND AISLE. SEE DETAIL <br />1/C7.1. <br />22. ADA ACCESSIBLE PATH. SEE ACCESSIBLE PATH NOTE THIS <br />SHEET. <br />23. PROPOSED LOCATION OF ACCESSIBLE PARKING AND AISLE <br />SIGNS. SEE DETAIL 3/C7.1. <br />24. PROPOSED WHEEL STOP. SEE DETAIL 5/C7.1. <br />25. PROPOSED ACCESSIBLE PARKING PAVEMENT SYMBOL. SEE <br />DETAIL 2/C7.1. <br />26. EXISTING LANDSCAPING. REPLACE WITH IN -KIND IF DAMAGED. <br />27. PROTECT EXISTING ASPHALT TO REMAIN. <br />ACCESSIBLE PATH OF TRAVEL NOTE: <br />WALKWAYS ALONG ACCESSIBLE ROUTES OF TRAVEL SHALL BE <br />CONTINUOUSLY ACCESSIBLE, BE A MINIMUM OF 44" IN WIDTH, HAVE <br />A MAXIMUM 2.0% CROSS SLOPE, AND SHALL HAVE RAMPS <br />COMPLYING WITH ACCESSIBILITY STANDARDS (SECTION 405) WHERE <br />NECESSARY TO CHANGE ELEVATION AT A LONGITUDINAL SLOPE <br />EXCEEDING 5% (1:20). <br />PROPERTY PROTECTION NOTE: <br />THE CONTRACTOR SHALL PROTECT AND PRESERVE FROM DAMAGE, INTERFERENCE AND <br />DESTRUCTION ALL PRIVATE AND PUBLIC PROPERTY ON OR IN THE VICINITY OF THE WORK. IF <br />SUCH PROPERTY IS DAMAGED OR DESTROYED OR ITS USE INTERFERED WITH BY THE CONTRACTOR <br />OR HIS OR HER AGENTS, IT SHALL BE RESTORED IMMEDIATELY TO ITS FORMER CONDITION BY THE <br />CONTRACTOR AT HIS OR HER EXPENSE AND SUCH INTERFERENCE TERMINATED. <br />EASEMENT NOTE: <br />THE LOCATION OF THE EASEMENTS SHOWN ON THIS SHEET SET WERE ADDED BASED ON THE <br />INFORMATION INCLUDED IN THE TITLE REPORT UNDER FIRST AMERICAN TITLE INSURANCE <br />COMPANY NO. NCS-1067959-OR1, DATED MAY 12, 2021. THESE EASEMENTS WERE NOT <br />SURVEYED, THEREFORE BARGHAUSEN CONSULTING ENGINEERS DOES NOT GUARANTEE THE <br />ACCURACY OF EASEMENT LOCATIONS SHOWN ON THESE PLANS. <br />UTILITY PROTECTION NOTE: <br />APPROXIMATE LOCATION OF EXISTING UTILITIES ARE SHOWN ON THESE PLANS. CONTRACTOR TO <br />COORDINATE WITH PURVEYORS AND USE EXTREME CAUTION WHEN EXCAVATING ON -SITE, UNTIL <br />EXISTING GAS AND POWER SERVICE LOCATIONS ARE CONFIRMED. CONTRACTOR TO ORDER <br />INDEPENDENT UTILITY LOCATES (INCLUDING GAS AND POWER) FOR THE FULL SCOPE OF WORK <br />PRIOR TO CONSTRUCTION OR ANY GROUND DISTURBING ACTIVITIES. <br />UTILITY CONFLICT NOTE: <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH <br />OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE <br />UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS <br />SHALL INCLUDE CALLING UTILITY LOCATE 0 811 AND THEN POTHOLING ALL OF THE EXISTING <br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT <br />CONFLICTS EXIST, LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON <br />THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD <br />OCCUR, THE CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE <br />ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />Sec. 31, Twp. 29N, Rge. 5E, W.M. <br />SITE PLAN <br />r <br />0 <br />o � <br />N <br />z <br />G = <br />W � <br />V U <br />a <br />S <br />W € <br />APPROXIMATE FOOTPRINT OF <br />UNDERGROUND STORAGE TANK <br />EXCAVATION. CONTRACTOR TO <br />PROVIDE SHORING DESIGN AND <br />ASSOCIATED PERMITTING. SEE UST ° <br />EXCAVATION NOTE THIS SHEET. <br />tdto <br />•cv � O <br />H H 11 I <br />I q 0,.a JJ <br />4 <br />Q . o, q . <br />O v. .4 <br />r a <br />t 0� o r <br />It'n ¢. d o 0 4 1 q <br />a' i+ I UTILITY EASEMENT 7 0o Q 14 a Q 4 © d <br />NO. 200811250386 4 4 d m <br />18` <br />p q4 <br />4 <br />o q <br />I r � �;t"� a��,�,� s���k` � `� � � � '� g� , '� �� � '" � �� wxa�� �kr# '�i`^�� � q ". g �, q• (fj <br />� x i x ._ y �'f�s�g' ��&g�,i` -� d <br />J 7•. „ � <� ,*+3 �. a �""r x 4 < C 5 s� �j �.a .n � �:,+ � ct � t r �. � 11 ;= h. a <br />•. . Fsr i.. �, t r 4 ,. ,:�'r,.�ZrR �,� a - .x,ss Y• , <br />e Y ` s ; �. z r ,� 'r��r{ a �-c �._, � °'•t a.•� `. � �` �T` =�tt �.�.`. a�. .„,"� ? �. a sZz w'"�` '•^^-+ <br />i <br />i 5 <br />PUBLIC TRANSPORTATION EASEMENT 4 1 p o <br />NO. 200807250218 <br />°. 26 i s <br />a: <br />STREET EASEMENT q ��'`►�..�,� <br />NO. 8806070036 _ Q <br />8806100156 �- - a q <br />9205260230 �-_ ;''b°' <br />46 W ° <br />..4 � r�41 <br />it a <br />-- a - q <br />a• a•' <br />N80'25.4g•'� 471.90,SON <br />q y <br />RO40 <br />CENiER�4'6 4 q d <br />INE _ ° a <br />N <br />0 10' 20' 40' <br />SCALE: 1 "=20' <br />Barghausen <br />Consulting Engineers, Inc. <br />18215 72nd Avenue South <br />Kent, WA 98032 <br />425.251.6222 <br />barghausen.com <br />BCE #20996 <br />W <br />W <br />W <br />N <br />L0 <br />00 <br />W <br />L_ <br />Z <br />W <br />U <br />J <br />W <br />u_ <br />u_ <br />O <br />Cn <br />z <br />0 <br />w <br />ry <br />0 <br />in <br />` <br />0 <br />m <br />0 <br />co S <br />0 (ACOM <br />O003m <br />c <br />Cl) w <br />0 <br />C7�a <br />O om o <br />o; V <br />U C, „,000 o <br />a'�N"1 <br />N �vP !M I <br />�ptNn <br />4J 0 M <br />� O pt p <br />H °0ia.aL2 <br />JP�pF WAs�� o�p <br />28527 <br />FC/STO' ��`` <br />IONA L Env <br />10/15/21 <br />J <br />Q <br />m <br />0 <br />W <br />H <br />a. <br />t= <br />w <br />LU <br />0 <br />r <br />Z <br />Project #: 20996 Store #00852 <br />Designed By. ADW <br />Drown By. ADW <br />Checked By. CJR <br />Dote: 10-15-2021 <br />Scole: 1 " - 20' <br />Disk File: 20996-A.dwg <br />4919 EVERGREEN WAY <br />EVERETT, WA 98203 <br />SITELAN <br />UST EXCAVATION NOTE OF <br />TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS. TANK 0 Know what's belOW. FACL" <br />EXCAVATIONS WILL REQUIRE SHORING AND SHALL BE ENGINEERED ® Call before you dig. Drowing No.: <br />AND PERMITTED SEPARATELY AND SHALL BE THE RESPONSIBILITY OF Dial 811 <br />THE INSTALLING CONTRACTOR. � <br />(;N3.0 Of 160' <br />