My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-02-17
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2023 8:23:59 AM
Creation date
2/17/2023 8:17:12 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI ORKS PERMIT Date Applied: 9/10/2018 <br /> City of Everett Permit Services Publl orks Permit#: PW1809-013 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> E V E R E T T Everett, WA 98201 Planning Reference#: SEPA18-005 <br /> WASHINGTON 425-257-8810 Public Works Fee: $44,615.38 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ERT LLC INTERWEST CONSTRUCTION INC <br /> 609 NORTH HILL BLVD 651 N HILL BLVD <br /> BURLINGTON,WA,98233 BURLINGTON,WA,98233 v <br /> Q <br /> 0 <br /> -4 <br /> PHONE: PHONE:3608999628 �� ` 2 <br /> TAX PARCEL ID#:29052100201000 SITE ADDRESS:2320 RAILWAY AVE rO/j), <br /> l <br /> 'et . � <br /> DESCRIPTION:CONSTRUCTION OF RAILWAY AVE ROAD AND UTILITY IMPROVEMENTS "t�' �, <br /> ✓i <br /> C`s <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for <br /> Development'. <br /> 3. All construction work and staging to be performed within defined extents of approved permit plans(Railway Ave ROW area).Use of adjacent sites are <br /> not permitting for construction or staging without first obtaining the proper permits from City of Everett Permit Services to establish such use. <br /> 4. Construction noise must comply with the City's Noise Ordinance.Noise from temporary construction sites is not allowed 10:00PM—7:00AM weekdays <br /> 6:00PM—8:00AM weekends unless a variance has been issued.https://everettwa.gov/1545/Noise-Administration <br /> 5. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated 5/31/2020. <br /> Approved plans must remain on job-site at all times. <br /> 6. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required <br /> inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 7.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be under a <br /> separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be scheduled 3-4 <br /> weeks in advance. <br /> 8.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and Construction <br /> Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 9.Temporary Construction Easement(TCE)is required for portions of construction that will take place on City of Everett property.Coordinate TCE <br /> with Real Property Division(Darcie Byrd:DByrd@everettwa.gov)prior to any construction on City of Everett property. <br /> 10.A 35'Right-of-Way Dedication is required from both the Penske property and the Interwest Construction property as part of this project. <br /> Dedication shall be completed using the City of Everett form and recorded at the Snohomish County Assessor's Office by the Developer prior to <br /> permit construction final.A copy of the recorded dedication document shall be submitted to Permit Services with a Transmittal Sheet marked with <br /> the permit number and"Additional document for file". City of Everett Dedication Form Template is included in the permit attachments at <br /> pw.everettwa.gov for applicant use. <br /> 11.Public Access Easement for portion of right-of-way in cul-de-sac that temporarily extends beyond the 35'dedication must be recorded on City of <br /> Everett Easement Form and recorded by the owner/contractor prior to permit construction final.A final copy of the recorded document shall be <br /> turned in to Permit Services with a Transmittal Sheet marked with permit number and"Additional Document for file".City of Everett Easement Form <br /> Template is included in the permit attachments at pw.everettwa.gov for applicant use. <br /> 12. A Performance Guarantee in the amount of 120%of the cost of public improvements is due upon permit issuance.Upon completion of the <br /> improvements,the performance guarantee will be traded in for a warranty bond. <br /> 13.A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to final <br /> approval/close out of the permit. <br /> 14.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy.Request a final inspection online by selecting PW <br /> 24-Site Final within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> ICI's Public Works Permit Fee Breakdown:TOTAL=$25,523.16 Penske's Public Works Permit Fee Breakdown:TOTAL=$19,092.22 <br /> Paving(26,942SF) $134.71 Paving(34,889SF) $174.45 <br /> Erosion Control $100.00 Erosion Control $100.00 <br /> Grade/Fill/Excavate(5,270CY) $305.00 Grade/Fill/Excavate(10,230CY) $445.00 <br /> PW Plan Review $6,029.58 PW Plan Review $3,148.14 <br /> PW Site Inspection $12,059.16 PW Site Inspection $6,296.28 <br /> Stormwater System Development Fee $6,894.71 Stormwater System Development Fee........58.928.35 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> /��� By purchasing this permit and commencing work,the owner/applicant hereby agrees to <br /> ,S u. 7i4a. 24#1d ez 6/16/2020 hold and save harmless the City of Everett from any and all claims for damages,costs, <br /> expenses,or causes of action that may arise because of installation and maintenance of <br /> Approved for Construction, Public Works Dept. Date the improvement or other right-of-way use here to applied for and further agrees to <br /> remove same upon notice from the City and to replace public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.