Laserfiche WebLink
Geotechnical Engineering Report 12 January 7,2020 <br /> QFC 852 Fuel Station,Everett,Washington RGI Project No.2019-258A <br /> Long-term pavement performance will depend on surface drainage. A poorly-drained <br /> pavement section will be subject to premature failure as a result of surface water <br /> infiltrating into the subgrade soils and reducing their supporting capability. <br /> For optimum pavement performance, surface drainage gradients of no less than two <br /> percent are recommended. Also, some degree of longitudinal and transverse cracking of <br /> the pavement surface should be expected over time. Regular maintenance should be <br /> planned to seal cracks when they occur. <br /> 6.0 Additional Services <br /> RGI is available to provide further geotechnical consultation throughout the design phase <br /> of the project. RGI should review the final design and specifications in order to verify that <br /> earthwork and foundation recommendations have been properly interpreted and <br /> incorporated into project design and construction. <br /> RGI is also available to provide geotechnical engineering and construction monitoring <br /> services during construction. The integrity of the earthwork and construction depends on <br /> proper site preparation and procedures. In addition, engineering decisions may arise in <br /> the field in the event that variations in subsurface conditions become apparent. <br /> Construction monitoring services are not part of this scope of work. If these services are <br /> desired, please let us know and we will prepare a proposal. <br /> 7.0 Limitations <br /> This GER is the property of RGI, The Kroger Co., and their designated agents. Within the <br /> limits of the scope and budget, this GER was prepared in accordance with generally <br /> accepted geotechnical engineering practices in the area at the time this report was <br /> issued. This GER is intended for specific application to the Proposed QFC 852 Fuel Station <br /> project at 4919 Evergreen Way, Everett, Washington, and for the exclusive use of The <br /> Kroger Co. and its authorized representatives. No other warranty, expressed or implied, is <br /> made. Site safety, excavation support, and dewatering requirements are the <br /> responsibility of others. <br /> The analyses and recommendations presented in this GER are based upon data obtained <br /> from the exploration performed on site. Variations in soil conditions can occur, the nature <br /> and extent of which may not become evident until construction. If variations appear <br /> evident, RGI should be requested to reevaluate the recommendations in this GER prior to <br /> proceeding with construction. <br /> It is the client's responsibility to see that all parties to the project, including the designers, <br /> contractors, subcontractors, are made aware of this GER in its entirety. The use of <br /> information contained in this GER for bidding purposes should be done at the contractor's <br /> option and risk. <br /> II I MI <br /> RILEYGROUP <br />