Laserfiche WebLink
Project Name: QFC 852 Fuel Station i I MI Boring No.: B-1 <br /> Project Number: 2019-258A I 11111 Sheet 1 of 2 <br /> Client: The Kroger Company RILEYGROUP <br /> Date(s)Drilled: 12/18/2019 Logged By: ELW Surface Conditions: Asphalt <br /> Drilling Method(s): Hollow Stem Auger Drill Bit Size/Type: 8"auger Total Depth of Borehole: 31.5 feet bgs <br /> Drill Rig Type: Track Rig Drilling Contractor: Anderson Environmental Approximate N/A <br /> Surface Elevation: <br /> Groundwater Level: Not Encountered Sampling Method(s): SPT Hammer Data: 140 Ib,30"drop,auto-trip <br /> Borehole Backfill: Bentonite Chips Location: 4919 Evergreen Way,Everett,Washington <br /> a) <br /> U <br /> C <br /> ca <br /> r <br /> a) <br /> w ♦+ cc Ov 0 O <br /> a^ E>' - a) <br /> O a) E o a) U <br /> ctlY E E n > U lc m <br /> w o u) in .0 cc CC D O MATERIAL DESCRIPTION m <br /> — 0 Asphal i Asphalt over crushed rock base <br /> SM ,'' Gray to brown silty SAND with trace gravel,dense,moist <br /> - - <br /> - 1 - <br /> _ : •--39%fines - <br /> 33 1 10 <br /> I <br /> — 5 Becomes brown,medium dense — <br /> 1 <br /> \ 11 de Becomes reddish •brown,trace organics 9 <br /> 1 <br /> / <br /> — 10—N f•—Becomes gray,medium grained,14%fines — <br /> 22 i — 5 <br /> . <br /> . <br /> — 15 !I <br /> SP ... Gray SAND with trace silt,medium dense,moist <br /> — \ 25 ::: — 6 <br /> — — <br /> — — ...,_ — <br /> — — ...a:. <br /> - 20 <br /> ......1 <br /> The Riley Group,Inc. <br /> 17522 Bothell Way NE,Bothell,WA 98011 <br />