Laserfiche WebLink
1� <br />EVERETT gverett Permit Services <br />WASHINGTON <br />COST ESTIMATE FOR PERMIT FEE CALCULATION 2022 <br />Date: 2022-03-11 <br />Public Works Permit No.: PW2111-007 <br />PROJECT NAME: QFC FUEL CENTER <br />LOCATION: 4919 EVERGREEN WAY <br />DEVELOPER: QFC <br />Name: Brian Peterson, Regional Construction Manager <br />Address: 3701 S. Norfolk St., Ste. 301 <br />City/State/Zip: Seattle, WA 98119 <br />Phone: (206) 808-0303 email: brian.Peterson@kroger.com <br />Contact: <br />Name: <br />Address: <br />City/State/Zip: <br />Joel Howitt <br />18215 72nd Ave. S. <br />Kent. WA 98032 <br />Phone: (425) 251-6222 email: ihowitt@barghausen.com <br />Grading/Cut/Fill (total earth moved) (Cubic Yards):.......... 1,900 CY <br />Total Asphalt/Concrete Paving (Sq. Ft.)(onsite & offsite): 2,2357 SF <br />(For Stormwarer System Development Fee Colculationjota l Roof Area (Sq . Ft.) : <br />Total Hard Surface Area on ground (Sq.Ft.): 2,2357 SF <br />Total of Public Improvements: ......................................... $ 4,940.00 <br />Total of Private Improvements: .................................... 1-1.4 55,768.00 <br />For Office Use Only <br />Permit Fee: <br />Erosion Control: <br />Grad ing/Fill/Excavation: <br />Asphalt Paving: <br />Plan Review Fee: <br />Inspection Fee: <br />Total: <br />Performance Guarantee: <br />(1.2 X cost of Public Improvements) <br />$ 200 <br />$ 245 <br />$ 111.79 <br />$ 9,10.62 <br />$ 1,821.24 <br />$ 3,288.65 <br />$ 5,928 Required? Yes / No <br />COST EST FEE CALC - 2019 <br />