Laserfiche WebLink
Analysis Results <br />POC 1 <br />0001 <br />000 <br />U <br />000 <br />0 <br />J <br />L 000 <br />0 0010E.5 t 0E -4 10E 3 10E d t 0E -1 1 10 100 <br />Percent T�m� Exc��d�np <br />+ Predeveloped <br />Predeveloped Landuse Totals for POC #1 <br />i T , 0 <br />N <br />CO <br />001 <br />LL <br />C 001 { ♦ ♦ ♦ ♦ { ♦ ♦'*" 0 001 <br />C 0001 0 oao I <br />x Mitigated <br />Total Pervious Area: <br />0.08 <br />Total Impervious Area: <br />0 <br />Mitigated Landuse Totals for <br />POC #1 <br />Total Pervious Area: <br />0 <br />Total Impervious Area: <br />0.08 <br />Flow Frequency Method: <br />Log Pearson Type III 17B <br />Flow Frequency Return Periods for Predeveloped. POC #1 <br />Return Period <br />Flow(cfs) <br />2 year <br />0.001715 <br />5 year <br />0.002538 <br />10 year <br />0.003102 <br />25 year <br />0.003829 <br />50 year <br />0.004379 <br />100 year <br />0.004935 <br />Flow Frequency Return Periods for Mitigated. POC #1 <br />Return Period <br />Flow(cfs) <br />2 year <br />0.033968 <br />5 year <br />0.045958 <br />Design Flow for CB #1 <br />10 year <br />0.054725 / <br />25 year <br />0.066784 <br />50 year <br />0.076503 <br />100 year <br />0.086876 <br />Annual Peaks <br />Annual Peaks for Predeveloped and Mitigated. POC #1 <br />Year Predeveloped Mitigated <br />1949 0.001 <br />0.035 <br />1950 0.002 <br />0.041 <br />1951 0.002 <br />0.040 <br />1952 0.001 <br />0.032 <br />1953 0.001 <br />0.042 <br />1954 0.004 <br />0.052 <br />1955 0.003 <br />0.040 <br />1956 0.002 <br />0.018 <br />1957 0.003 <br />0.031 <br />1958 0.002 <br />0.077 <br />Pipe Sizing 7/19/2021 12:00:37 PM Page 17 <br />