Laserfiche WebLink
Interwest Construction Co.—Railway Avenue Improvements,Everett,WA Feb.14,2019/Revised Feb.7,2020 <br /> Geotechnical Engineering Report P1486-T18 <br /> I <br /> I <br /> I <br /> 6.0 CLOSURE <br /> The conclusions and recommendations presented in this report are based, in part, on the <br /> explorations that we observed for this study;therefore,if variations in the subgrade conditions are <br /> observed at a later time,we may need to modify this report to reflect those changes. Also,because <br /> the future performance and integrity of the project elements depend largely on proper initial site <br /> preparation, drainage, and construction procedures, monitoring and testing by experienced <br /> I <br /> geotechnical personnel should be considered an integral part of the construction process. MGI is <br /> I available toprovidegeotechnical monitoringof soils throughout construction. <br /> g <br /> IWe appreciate the opportunity to be of service on this project. If you have any questions regarding <br /> this report or any aspects of the project, please feel free to contact our office. <br /> I <br /> Respectfully submitted, <br /> MIGIZI GROUP,INC. o B. 8 <br /> 1 -4*essc. -Q <br /> — . 1.. iiir . <br /> . .1‘1, c i l <br /> 4111"111.. <br /> Lau n B.Burch, G. . Lee '441J E.Brigham,P.E. <br /> Staf Geologist Senior Principal Engineer <br /> I <br /> I <br /> I <br /> I <br /> Migizi Group,Inc. Page 13 of 13 <br />