Laserfiche WebLink
TABLE R402:4.'1.1 <br />. AIR BARRIER AND INSULi1TlON INSTALLATION I <br />compommt <br />' <br />tRiTER1A' <br />Air barrier andthermalbarrier* <br />A continuous alrbardershallbelestalled In the building envelope. Exterior thermal envelope contains a continuousair <br />bawler. Breaks or Joints in the air .barrar shall'be seated. Air-permeabte1nsulation shall not be used as a sealing material. <br />Cavity Insulation installation. <br />Ailcavitles Inthethermat envelope shall be with insulation. The density ofthe.insulation shall.be at -the manufacturers' <br />product recommendation and said density shall.bemaintalned for all volumrofeach cavity. Batt type insulation will show no <br />Ids or gaps and lnaintalnan even density for the eptire cavity. Batftnsulallon shai! be Installed in the recommended cavity <br />depth. Where an obstruction in the cavity due to services, blocking, "bracing or other obstruction exists, the batt'product will <br />be cut to fit the remaining depth of the cavity. Where the batt is cutaraund obstructions, loose fill insulation shall be platen ; <br />' <br />to fill any surface or concealed volds.andat ttiamanufacturers'specified density. Where fated batt is userlAhe'Installation <br />tabs..mustbe stapled to the'face of the stud. There shxitbe no compresston.to the 6att at.the edges of the cavity due to inset <br />stapiing installation tabs. <br />Insulation that upon Installation readilyconforms to'avaltable space shall be Installed filling the entire cavity and within the <br />manufacturi density recommendation. <br />ceiling/attic <br />The air barrier in any dropped ceiling/soffit shaft be atlgned with the Insulation and any.gaps fro the all barriersealed. Access <br />openings, drop down stair or knee wall doors:to unconditioned attic spares shali be sealed: Batt Insulation installed-rn attic <br />roof assemblies maybe compressed at exteriorwa6 Mesta allow for required attic ventilation. ' <br />Walls <br />Corners and headers shall be insulatedandthe junction of the foundation and sill plate snail besealed. Thelunctlon.of the <br />top -plate and. atextertorwaits shall beseated.:ExterWt''thermatenvelopeinsulationforframedwalls shall be Insultedin <br />substantial contact and continuous atipment with the air'barrier. Knee wags shall be seated. <br />Windows, skylights 4nddoors . <br />space between-w1hdow/doori and andframing shall be sealed. <br />Rijniolsts <br />iimjoists shall be Insulated and includethe alrbarrier. <br />floors (including above -garage and <br />Insulation shall be installed'tamaintain permanent contact with.underside'ofsubfloor decking,The•airbarriershali.bo <br />cantilevered'fic ois) ' <br />insulted at any exposed edge of insulation. <br />Crawl space walls <br />Whereprovided In lieu of floor insulation4!, Fasulation shall be pemaaeritty-attached toahecrawlspace wells, Exposed earth <br />inunventedcrawl spacesshalibecoveredwithaClmlvapor.retarder:with.overlappinglolntstaped. , <br />*Insulation o/crawl space walls Is not' Prescriptively allowed A71 UA.Aitematlye method is'required <br />Shafts„penstratfons <br />Duct shafts utility penetrations, and flue shafts opening to exterior or unconditioned spaceshali be seated. <br />� <br />e <br />0 R403.1.1 Programmable Thermostats for Forced kit Furnaces <br />'- <br />Where the primary heating system Is a -forced -air furnace, at least one thermostat per. dwelling <br />0, g40 Meebaccat Ventilation <br />i <br />be capable of controlling heating and cooling system a a daily schedule to <br />unit ri <br />A mechanical ventilation system is required to be installed in accordance with the <br />Y q <br />i' <br />maintain differenttem erature set, ants at different times of. the day. The thermostat shalt <br />" p Y <br />Washington State amendments to the IRcarrdjar iMC aria ASHRAE standard Bz.zsoio: } <br />hno:/faoos.tea.wasovJWACidefaultaso0diaii$1-SO" <br />- <br />ai€ow for, at a minimum, a 5-2 programmable schedule (weekdays/weekends) and beCapabie <br />----"�� <br />of providing at least two programmable setback periods per day. <br />L� g404.1 Ughting Equipment - <br />hi - <br />. A minimum permanently 3 fled"lam in i httn fixtures shallbe h <br />m n mum of ?5 percent _of permane t y nsta ps i g g <br />D 9403.1.2 Heat Pump Supplementary Neat , <br />efficacy -lamps.. 1 <br />;. <br />Unitary air cooled heat pumps shall include controls that minimize supplemental heat usage <br />-- i <br />during startup, set-up, and defrost conditions. See R403.1.2 for control and set-up <br />HIGH-EFFICACYLWPS. Compact' fluorescent lamps, T-8 or smaller diameter linear <br />i <br />requirements. <br />fluorescent tamps, or lamps with a minimum efficacy of: <br />i 1 <br />1. 60 lumens per watt for lamps -over 40wattr. <br />! 2. 50lumeni perwatt for lamps over 1S watts tr 40 watts; and <br />D R403.2.1 Duct Insulation <br />3. '. 40lumens perwattfortamps 1S watts or less. <br />Ducts in attics shall be Insulated to a minimum of R-8. <br />Exception: Ducts or portions thereof located'compietely"inside the building thermal envelope. <br />0 R409.2 Additional Energy c encyRequirements <br />. <br />Ducts located In crawl spaces (vented or unvented) do not qualify for this exception. <br />Each dwelling unit in one andtwo-family dwegings and townhouses, as defined -in Section 101.2• ' • . ,' <br />of the international Residential Code shall comply with sufficient options from Table R406.2.so <br />❑ R403.2.2 Sealing and1resting <br />as to achieve the following minimum number of credits: <br />Ducts; air handlers, and filter boxes shalt be seated. Joints and seams shall comply with either <br />1. Small Awelling Unit: 0<5 points <br />i <br />the International Mechanical Code orMternationai.Residential Code, as applicable. Ducts shall <br />Dwelling units lessthan MO squirefeet inconditioited floor area with less than <br />be leak tested In accordance with.WSU RS-33, using the maximum duct leakage rates specified. <br />300 square feet of fenestration area. Additions that are less than 750 square <br />feet of heated floor area to any size existing building: <br />i W33 ouctTestrngstandards: 2. Medium Dwelling Unit: 1.5 points <br />L i (} ' /wjgn;maywui6ed new revyu- p3 29 1- All dwelling units that are not included In #1-or #1 <br />w n 000 re feet of condition ea <br />N- Prescriptive I Checklist for 2012 Washington State Energy Code <br />11 <br />3. Carge ®welling Unit: 2 5.potnts <br />of d r wal s floors orceit g displace. renvelopei g q <br />•D A403 2.3 Building Cavities' Dwelling units exceeding 5 square conditioned floor area" <br />-�*-•• �- Installation acts in exterior 1 fl in s shalt not die la required <br />COMPONENT <br />' CRRIiRt/l' <br />Narrow cavities <br />Batts in narrow ravitlesshail be cut to -fit and installed to the wrrectdensity without any voidsor'gapsor compression. <br />Narrow cavities shall be filled by Insulation that on installation readily conforms to theavaitable cavity space. ' <br />Garageseparation <br />Airsealing.shall be provided between the garage and.conditioned spaces. <br />Recessed lighting <br />Recessed light fixturesdnstalled in the building thermal envelope shall be airtight, ICTated, and sealed to the drywall. <br />Plumbing and wiring <br />Batt insulation shall becutneatlytofitaroundwiringandplumbinginexterlorwalis.Thereshallbenovoidsorgapsor <br />Compression where.cutto fit. insulation that on installation readliy'conforms to available space shall extend behind piping <br />and wiring, <br />Shower/tub on exterior -wall <br />Exterior walls adjacent to showers and tubs shall beinsulatedand the air barrier installed separating them from the showers <br />and tubs, <br />Eleadcal/phonebox-on exterior wails <br />The air barrier shall be installed behind electricaltir oommunicatlon boxes or air sealed boxes shall be Installed. - <br />IivACregister boots <br />register boots thatillenetrate b-ull.,ding-thermatenvelope shall be seated to the sullfloor or drywall. <br />Fireplace <br />An.air barrier shall be installed on fireplace walls. Fireplaces sha4havo gasketed'doors. . <br />a. inaddnion, inspectb:l of bawallsahall be in aaxvdance cold: tlleprov!sfont ofxG4011. <br />Insulation. Table R406.2:i p /iwww enerav wsu edo/tMcuments/1'abfe a06 2 Eneran Credits 2012 wSEG ndf - <br />i <br />13 R403.4.2 Not Water Pipe insulation <br />Insulation for hot water pipe 'shait have a minimum thermal. resistance of R-4. An SBCC, <br />interpretation states that insulation canbe discontinuous where passing through framing <br />members or where necessary to pass another pipe in a stud space-: <br />D R403.4.3 Electric Water Heater insulation <br />. Allelectric water heaters in unheated spaces or on concrete floors shalt be placed on an <br />Incompressible, insulated surface with a minimum thermal resistance of R-Ill: ; <br />Proscriptive 'Cheddtstfor the 2012 Wash#rigton,State.EnergirCode 13 <br />14 p ive Checkltst for the2012Washington Stateknergy Code . <br />ra.• <br />The following prescriptive checklist rites 2012 Washington State = - - --- _-::. <__ gto to Coda WSEC items r . a , . <br />that a to most . . {. <br />D R3A3111:Insutation Markers ! ' � , "l <br />• .. pPiY t rest ... «. » •. - . I� R402:2.1 Ceilings witlt.Attic Spates T°:°`a,.�',.••- � �..�'. <br />cHon projects. This checklist is not a Substitu Hate m intermediate Framing <br />dentist neat constru •. <br />to for The thickness of blown -in t l~I Table 402.►.1 Foot � <br />g 'h: i <br />the energy t sun n or roof/ceiling insulation ��% �_," • ! :..'•-*• - t <br />rgy ode itself: nor is It a Ilse of corasprehensive energy code requtrements..To obtain a �' tnt. {intermediate framing} denotes standard framing 1fi inches an center with headers <br />[t-38'shail be deemed to satisfy e <br />copy of the energy code, go to., www.eneray.wsu.edu (fiberglass or cellulose) shalt be written inches ('mm) on `;t; ' ` , . insui ted w i requirement for R 49 wherever the fait height <br />a tth.a min mum of R-10lnsuiation. iit 5trne�dvem <br />'. r every 0 r extends ,x. • .. i `i i i <br />e markers that are installed at least one for cry 3 0 square ' 1 of uncompressed R-38 insulations d over i } <br />13 R103.2 feet (28 m21throughout the attic space, the wall top piate at the eaves. <br />Include details SANDWICH NEADr: <br />!• .' 1. <br />In construction documents regarding insulation materials and their R-values; i�'R303.2.1 Protection of Ex sed Foun ai <br />! D' R402 L 1:1 loose Ftll Insulation in Attic 1 <br />po d ion insulation ' <br />• - •, fenestration U-factors; area -weighted U-factor calculations; mechanical system design critEria; above " !';.• � � <br />mechanical an grade and 6 below grade . L+Ot1 E 2X FSEA�K j <br />' vATH RtG101N5GtknON.' .Spaces <br />d service water heatingsystemand equipment types, sites and effldenetes; 1 <br />i i W^g f ! <br />• Insulation applied to•the exterior of basement waits, is 3ANaMci•iECsti>:TwEeN ! O en-biown.or oared loose flit in may eatwee�, <br />p A i' <br />• • • - equipment and systems controls,•. duct seating, duct' p[pe insulation and Location; and air t . <br />Tnuxs. � crawlspace wails and the perimeter ofslab-on-gradefioors = ' ! be used Fnatticspaces where the siopeaf the <br />sealing details. , R4a22.iteningswkhAttksFaces i <br />shall have a rigid, opaque and weather -resistant protective i feet to 12 and there is <br />i D Ri03.3'.1 covering to prevent the degradatlon ofthe lnsulaiton's !" ' <br />.4xMEAt7ER / : ceiling is notmorethan3 e t (youcaa-reducetelt7nglnsutadonR-value to381fyau j <br />Approved Drawings on Site i, 7 IN'6x WALL' i ` at least.30 inches•of clear distance from the'top !have R-38 extending Pa the crier or.wall tine. <br />set of construction docament ' the performance. of the bottom chord "of the truss or Ceiling joist <br />PLATE <br />. - .. _ .. <br />thermal rman OOUBLE2dc L , <br />One documents'so re shalt' be retained by the code.officiaP l he other YOv'fy A <br />tshall -be returned to the a.ppiicant, kept at site of work and shall be open to inspectlon <br />i' l <br />1 i to the underside oftbe sheathing at the roof ridge.. <br />Y ode off <br />dol or a duty authorizedrepresentative.j type <br />Se <br />b the c ui .a i ❑ R401.3 Certificate' iR303 i.3lnsutation Markers ; o eN® i . D R402.2.3 Eave Baffle <br />A permanent certificate shalt be corn lnsularion markerr»sraued in attic. I i <br />• ❑ R104.2.1 Waif insulation inspection . � ple4ed and posted' on � , � � 'Far air permeabte.insutations in vented attics, a baffle shah <br />:Make sure the marker is applicable to '� YANp(iV�t(OR OriDR} 1 .Fo air p► rmeali cent to soffit and rave vents.i a j ; • ; t - - or within three feet of the electrical distribution panel by the type of i»;ufatio»insta!!ed , J , . The building official, span notification, shaft make a wall insulation ins ectionin addition to . p the or registered design professional, The �Ifiberglass, cellulose etc.). i <br />g g p _ 4xHEAOER. ! i <br />• •, those.inspectIonsrequired in Section R109 of the International Residential Code: This f •, - i : ' <br />certificate shall be completed b the builder.or registered design I 4' cress Hatches and Doors t <br />Y g gn professional. The certificate D R402.2 A <br />- -. • inspection shalt be made after all wall.and cavity Insulation is -in plate and prior to cover. � must list the ever feat � • i 21t NAIt:ER' - <br />gy features of the structure.' \} <br />HEADER HNGEl2 Accessdoorsfromconditionedspacestcrunconditioned. <br />e51 n (e.g:, attics and crawl spaces} shalt be weather i CJ R302 2 f tfB 1t44UALtdEADER spaces t 0 g Certifkat nt =6 T Per h d SIZES TO j <br />Design Conditions e: D ! I strtppedandinsulatedtoa'levelequtvaienttothe ! i. The heating or cooling -outdoor design temperatures shalt be selected from the (, fZONt LOADING CDNRrt $ <br />WSE ndi 2%2npnarmAt90Ao ar Insulation u ding surf '. <br />~�`^•. ' nsul on the^ rroun aces. <br />le 40211 Foot d Stab - - : <br />,. R303 Heir � I ' <br />CAppe x htta•/IwwwenerevwsuedulDocuments72g1 <br />oen le ; <br />` ' • - to - SANfJ)i1tAIf�ER <br />. CettiRca <br />1 tnsulatibn ' <br />t n � { <br />j <br />The Insulation( ; <br />D Tab .. .•_..._:;:;:�_ _..._, __.__....__...._._....- •: fit , <br />442Z,3 Save Baffle <br />�aaflteat roveveriL Minimum 1" " <br />-Value! ! 1 unobstructed airspace required.' <br />type, manufacturer and R-value R-10 continuous insulation Is required under t' <br />installers shall provide a certification listing the t I f tt11r000 ...... ,, �� i - • i <br />heat lab o floors. .e R46.2.9.1,I I COttNECr T <br />of inwlation'ina°ta8ed in each e}ement of the building thermal'envelope . Forbtown ar sprayed heated s n grade f s Se <br />• thickness, settled thickness settled R- - t <br />itEADFA O Insulation (fiberglass and cellulose} the initial installed thkk IWA t r GOewEGroR i <br />value, Installed density, coverage area and number of bags installed shall be listed on the D Table 402.1.1 Footnote "k". Ceilin 1' •(FOKAWANC1iV 'AMdili) }} <br />I i • <br />! i t <br />certification• `For sprayed polyurethane foam (SPF) Insulation,, the installed thickness of the R-Value g _ 1 <br />�, 1�, 1 u,m 1 )j f. --. ---� TabTe4ti2.1.iFootnote"k"IntermedtateFramtng <br />areas covered and R-value of Fnstaited thickness shall be listed on 'the certification. The For single rafter or joist -vaulted i i <br />Insulation installer 1 u led ceiiings, the 1NT"cootisrequire R•IOinsutptedheaders thesdadrawings show vprtaas ways to athteye thisrequiremenL p <br />shall sign, date and post the certificationin a conspieuous.location on the job insulat[on ma be reduced to R-38. ' <br />site.. Y t 1 <br />• .. , - - ,,M -..., Yak- •i , <br />oraesldenNalNewConstructlon: oobtote"d'Sla RValue jR4tt2z4AteessHatthesa <br />.. . <br />Insulation Certificate f i I I rid Doors • I Table llyIns.if b,'lnsulptedemwlspaceaccess,Thesame <br />. • . _ ,. • • rtficate4,2o5 0 ndt � R-10Jalty insulated slab forheated'slabwn•grade floors. � � � - <br />- httoa/www.en ravwsS,igdu/Do- menu!(nsutatton%20Ce i 4mefhddapplies taattic-access hatches. <br />. <br />' Prescriptive checklist for the 2012 Washington state Energy code. <br />Prescriptive Checklist for the 2012 Was State Energy. Code 2 <br />c fate En e 3 Prescriptive Checklist he gt Energy ode <br />i Prescr#ptiveChe ktistforthe2012'WashingtonS era Cod , } scriptiv fort 2012Washirr onState'Ener C 4 1 <br />i <br />- <br />t i <br />p <br />, <br />_ <br />- <br />5 <br />• <br />t <br />• <br />i <br />, <br />_ <br />r <br />•r <br />.2 7 Floors -.. 7 Floors Exception i <br />DR402.2.8 Basement Watts- <br />F! x . - - - <br />oor insulation shalt be installed •to Substantial contact with thexurface bete Instil d i A4o2.2,a n� - - g ate Is not required in enclosed floor/ceiling. shall extend is i <br />Below grade exteriorwail insulation used on the exterior (cold) side I Baseme twat <br />maintain permanent contact with the assemblies containing ducts where tali Rva[ue insulation Is installed betweenthe duct and'the from the top of the below -grade wall to the top of the footing and shall be approved for below- Recommended.watiassembl s <br />~'� y j � •.I <br />underside of the subfloor decking. exterior surface. grade use. Above shai) , e protected. insulation used an'the interior:(warm)' a t t <br />R>13 baK applied ovscR-S foam <br />! side of -the wall shall-extertd from the: top of the below -grade wail to the below -grade floor.level <br />Insulation supports shall be installed so t <br />spacing is no more than 24 inches on ii 1 <br />.and shall include R-5 rigid board providing a thermal break between the.contrete waft and the <br />^_ - Ductwork inside I <br />• Hier. Foundation vents shall be.placed ' , ' slab.'. . ) � <br />tlti 41 `:f li '� �' <br />so that the'to of the vent is below fir V{ #i f t' I I� conditioned space ' <br />p t' I ail ri, i i ! i j Rim Insulated and. i I s '`•'� <br />lower surface of the floor Insulation. I seated to sameleveis <br />as above grade walls <br />tarinsulabo 0 uous t V <br />r <br />••r i <br />. s S R402 2 7 Floor Exception �R402.2.7 pours xy.r, j <br />..... I er 'nit-1 co»tin , �� �s. •..�.. t } <br />Floor lnsutatton <br />floori»sulation Installed with Contact to the underside of the is I n Contact with <br />.. - When.foundatlonvents are not placedso � .garage ceiling <br />floor decking. Note the inset stapled twine. i <br />• - - ' that the top of the vent is below the <br />lion, a permanently attached baffle shall be installed at an j <br />I E t <br />Power surface of the fluor insula <br />of 30 from 3 d flow b 1 y '.angle hot zontai; to inert air ow a ow the lower surface of the floorinsulafion. <br />WALL FRAMING <br />rector!»sv S continuous 5 $ 1 <br />Floors Exception i <br />p f substantial contact 1 I d 1 i71 assembly. <br />i. <br />. VENTCLOStl1tE R4ce2�k>» or uan�t on with 'nsulare rro kwr ee o assem <br />l � i <br />i ' � to lotion R= t! i_ <br />, <br />t <br />f / 9 � i ! <br />! . • : • $Q' It ishnper fve that the r1m joist be caulked and sealed to minkirize-air Infiltration, ^ <br />i <br />MUD SILL <br />I SILL SEAL AND �/ . ' PERMANENT BAFFLE <br />• .' CAPILLAK7BREAK i i i j <br />STEM WALL <br />Donarinstaltpdporretarderslnbelow gradewvdils j � � •� <br />, , ' .. - I __...,_�_ _,..,---------* --<•-.�...,..-..,� �4 � i - _�....... _...__. I . � 2012 international Residential Code I _....__.,...._ i • <br />M01MRE SARRiER i <br />(6 MiL'BLACK POL`rVHYLENE } R-21 cavity allowed but.not.recommended due to 1 - R702.7 VaporY i ' <br />retarders Class 1 or ii vapor retarders ' <br />potential moisture problems ? are required on the inteciorside of frame wails in <br />Ciimate'2ones, S, b 7, 8 and Marine 4. i j Exceptions: a 3 <br />i 1. Basement walls, <br />- A402,2.7Floors Exception L i T. 2. Below grade. portion ofanywall. <br />.. iBaffl am tfo a /0 tsh t iii t 3 rIts I .. ... <br />' ' , . • - I: ounddtlof v/nisi vent m a s o - � 1 } <br />Inot 4 <br />t. The Construction where o <br />i i � wh t <br />e some opplfca ' n 1s.n eded for is ung fro - he m d a � . ' <br />• � 1f � n e tocorion.' .__� ._ .. ' i - freeztngwii: damagethe <br />materials. , <br />!ION <br />; <br />Prescrl 7 1 <br />Prescriptive Checklist for the 2032 Washington State Energy Code Prescriptive Checklist for 20i2. Washington State Code b J <br />e e 012 n e 7 Prescriptive checklist for the 2012 Washin n state EnergyCode i <br />i Prescrt tin Ch cklistforthe-2 Washington State.Ener <br />• <br />' P gt gy Cod � <br />4 <br />l <br />{ <br />