My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3632 RUCKER AVE 2018 Plans 2023-02-21
>
Address Records
>
RUCKER AVE
>
3632
>
Plans
>
3632 RUCKER AVE 2018 Plans 2023-02-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2023 9:36:41 AM
Creation date
2/21/2023 9:33:54 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3632
Permit
PW1807-044
Year
2018
Notes
TESC, CLEARING, MASS GRADING FOR NEW 51 UNIT APT COMPLEX
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br />PROJECT BENCHMARK: <br />CITY OF EVERETT <br />STATION V029. <br />EL=175.63' <br />W <br />MONUMENT LINE <br />LANE STRIPE <br />FIRE SIGNAL POLE, <br />LIGHTPOLE <br />SIGNAL POLE, <br />LIGHTPOLE <br />O� <br />VV / W W W - <br />i <br />N01 °04'25 "W 7 51.00' <br />CROSSWALK <br />VV — <br />14.00' j <br />N Lo <br />ao <br />N CO <br />LANE STRIPE m <br />co <br />co <br />ss S - - -- - s s -- -- - - -- -ASS- --- --- - -- -S S- -- S S- <br />LANE STRIPE ` ~ <br />N I <br />a� CL m <br />LANE STRIPE o � <br />ciz- <br />QD <br />IX F. H. <br />s INLET BASIN <br />RIM=178.46' <br />IE=177.63' (6" DI NW) <br />MONUMENT LINE <br />o c CO REMOVE STAIRS & \ SS <br />" <br />� REPLACE W/ROCKERY "B'US STOP <br />ROCKERY SIGN <br />- - W <br />— —� . „°. —v— � '' cam• � <br />IN <br />da—° — d <br />\y\V <br />OR SWALK <br />\� 180 _ _ _ - a REPLACE W/ ROCKERY, <br />N01 °04'25 "W 135_00' T TOP=182 <br />— — — <br />�A s / <br />FOUND 3/4" IRON PIPE � IiQ � � S10P BA z <br />0.22'S X 0.14'E c c <br />y, <br />MARKER o <br />o <br />(� FOUND REBAR <br />& CAP '19631' <br />SIGNAL POLE/ <br />LIGHTPOLE <br />W CL30' EX. R/ 30' EX. R/W <br />LLJ <br />N <br />186 _ LANDS' APE ROCKERY <br />TOP=183.5 <br />HOUSE p, <br />b, <br />1 Q I FF=181.75 o <br />24 22 21 i 1C � � / 18 �� �� � % ' `� <br />i <br />00 <br />CA PORT <br />o <br />C�) I a <br />zI <br />POWER <br />VAULTS % I I % € <br />i% j \ <br />FOUND REBAR &CAP <br />L=36.77' 'ORA 19583, 18924, <br />FOUND REBAR & CAP, R=183.10' 32432' 0.10'S X 0.09E <br />ILLEGIBLE A=11 °30'20 FOUND TACK &WASHER <br />IN SOUTH <br />X 0.15'E a / <br />� � ��ND '19637 ; 0.10' <br />0.1 <br />3 € R �w� <br />Q) <br />Q ti, <br />ZE s I <br />I �\ <br />NO 1 '04-25 "W <br />c� 4 <br />- <br />Q L <br />` <br />R-25.00' <br />/sTo��R96 L< <br />TEMP. IIAREA y � <br />SSMH <br />RIM 182.75' <br />IE _',5166,93' <br />CL CURVE DATA <br />L=181.0' \ d \ F_XI ` <br />R=153.10' � (TOA=67°59'56" D <br />BLOCK 3 RIM 186.12' <br />F-RIDAY S SECOND ADDITION I D EVERETT IE 36" (N,SW)=168.54' oS \ <br />VOL. 3, P 56 CB T- I <br />RIM=185, 14' <br />IE=181.01' 02" PVC E) \ <br />CAUZION° <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, <br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE <br />PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL <br />AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE <br />CALLING UTILITY LOCATE 0 7-800-424-5555 POTHOLING ALL OF THE EXISTING <br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY <br />WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN <br />ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND <br />ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR <br />SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL <br />PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />O <br />� <br />(D <br />EX. F H, WATER <br />.VAULT <br />`I <br />a <br />"STOP SIGN" <br />I <br />I <br />SIDE SEWER <br />NDONED) <br />j <br />I <br />I <br />�I <br />CENTERLINE <br />'`INLET BASIN <br />RIM=178, 76' <br />IE=177.72' (6" DI NE) <br />rPUSUC W' KS DEPARTMENT <br />By�--- <br />DATE <br />CITY OF EVERETT R VIEW 0 FOR PERMIT <br />NOTE: <br />CESCL CONTACT- INFORMATION MUST BE SUBMITTED <br />TO CITY INSPECTOR PRIOR TO ANY WORK. <br />THE 13 ELEMENTS OF TESL BMP <br />ELEMENT #1 — MARK CLEARING LIMITS: <br />LIMIT OF CONSTRUCTION ARE CLEARLY MARKED. <br />ELEMENT #2 — ESTABLISH CONSTRUCTION ACCESS: <br />A STABILIZED CONSTRUCTION ENTRANCE IS SHOWN. <br />ELEMENT #3 — CONTROL FLOW RATES: <br />FLOW IS MINIMAL. <br />ELEMENT #4 — INSTALL SEDIMENT CONTROLS: <br />SILT FENCE, INLET PROTECTION, MULCH AND INTERCEPTOR SWALES ARE <br />PROPOSED. <br />ELEMENT #5 — STABILIZE SOILS: <br />SOIL STABILIZATION IS ACHIEVED BY MULCHING, PLASTIC COVERING AND <br />SEEDS. <br />ELEMENT #6 — PROTECT SLOPES: <br />SLOPES ARE PROTECTED BY PLASTIC COVERING, MULCHING AND SEEDS. <br />ELEMENT #7— PROTECT DRAIN INLETS: <br />INLET PROTECTIONS ARE PROPOSED FOR THE STORM DRAINS. <br />ELEMENT#8 — STABILIZE CHANNELS AND OUTLETS: <br />OUTLET PROTECTIONS ARE PROPOSED. <br />ELEMENT #9 — CONTROL POLLUTANTS: <br />ALL VEHICLES, EQUIPMENT AND PETROLEUM PRODUCT <br />STORAGE/DISPERSING AREAS WILL BE INSPECTED REGULARLY TO <br />DETECT ANY LEAKS OF SPILLS, AND TO IDENTIFY MAINTENANCE NEEDS <br />AND PREVENT LEAKS OF SPILLS. <br />ELEMENT #10 — CONTROL_ DEWATERING: <br />THERE WILL BE NO DEWATERING AS PART OF THIS CONSTRUCTION <br />PROJECT. <br />ELEMENT #I I — MAINTAIN BMP's: <br />ALL TEST BMPs SHALL BE MAINTAINED AND REPAIRED AS NEEDED. <br />ELEMENT #12 — MANAGE THE PROJECT <br />THIS COULD BE ACHIEVED BY MINIMIZING THE EXTENT AND DURATION <br />OF THE AREA EXPOSED AND BY EMPHASIZING EROSION CONTROL THEN <br />SEDIMENT CONTROL. <br />ELEMENT #13 — PROTECT ON —SITE STORMWATER MANAGEMENT BMP'S <br />FOR RUNOFF FROM ROOFS AND OTHER HARD SURFACES: N/A <br />NOTES: <br />CITY STREETS ARE TO BE KEPT CLEAN OF DIRT <br />AND DEBRIS AT ALL TIMES DURING CONSTRUCTION <br />DUST SUPPRESSION AND STREET CLEANING MUST <br />OCCUR AS DIRECTED BY PUBLIC WORKS <br />INSPECTOR. <br />ALL .EXPOSED GROUND Pv1UST BE RESEEDED WITHIN <br />30 DAYS OF COMPLETION OF CONSTRUCTION. IF <br />RESEEDING IS NOT PRATICAL DUE TO WEATHER OR <br />SEASONAL PROBLEMS, THE GROUND MUST BE <br />COVERED WITH MULCH AS DIRECTED BY THE CITY <br />ENGINEER. <br />TEMPORARY EROSION CONTROL MEASURES FOR <br />CONSTRUCTION ACTIVITY MUST BE OPERATIONAL <br />PRIOR TO COMMENCEMENT OF ANY CLEARING OR <br />EARTHWORK. <br />
The URL can be used to link to this page
Your browser does not support the video tag.