Laserfiche WebLink
3 <br />LENGTH AS REQUIRED 100' MIN, EXCEPT <br />MAY BE REDUCED TO SO' MIN FOR <br />SITES WITH LESS THAN ONE ACRE <br />OF EXPOSED SOIL OR APPROVED BY INSPECTOR - <br />PLACE CONSTRUCTION GEOTEXTILE FOR SOIL <br />STABILIZATION FROM THE EDGE OF THE EXISTING <br />ROADWAY TO THE CONSTRUCTION ENTRANCE, <br />OR AS DIRECTED BY THE ENGINEER <br />GRADING QUANnnES <br />CUT: 50 CY <br />FILL: 50 CY <br />GRADING QUANTITIES ARE ROUGH CALCULATIONS THAT <br />DO NOT TAKE INTO ACCOUNT SHRINKAGE OR SWELLAGE. <br />ATTACH IN A MANNER THAT <br />ASSURES FABRIC IS FIRMLY <br />HELD BY THE BACKUP <br />SUPPORT IN A WAY THAT <br />REDUCES THE POTENTIAL <br />FOR FABRIC TEARING <br />BACKUP SUPPORT <br />BACKFILLED & <br />COMPACTED <br />NATIVE SOIL---, rcn Yni <br />BURY GEOTEXTILE <br />IN TRENCH <br />EX'SS1idG ?ONO <br />DEPTH <br />TYPICAL <br />ISOMETRIC VIEW <br />CONSTRUCTION ENTRANCE <br />POST SEE WSDOT STANDARD <br />SPECIFICATIONS 8-01.3(9)A <br />FASTEN GEOTEXTILE TO <br />POST EVERY 6" IN O.C. <br />SELF-LOCKING TIE-NYLONE <br />6/6 (MIN GRADE) <br />120# MIN TENSILE STRENGTH, <br />UV STABILIZED <br />oZ <br />Nc' <br />TYPICAL INSTALLATION DETAIL <br />INSTALL BACKUP SUPPORT FOR <br />THE GEOTEXTILE SEE STANDARD <br />SPECIFICATION SECTION 8.01.3(9)A <br />20 / <br />to <br />E„a <br />GEOTEXTILE FOR SILT FENCE <br />SEE STANDARD SPECIFICATION <br />SECTION 9-33.2 (1), TABLE 6 - <br />TYPICAL SILT FENCE <br />WITH BACKUP SUPPORT <br />ISOMETRIC <br />NOTES <br />1. STABILIZED CONSTRUCTION ENTRANCE SHALL <br />MEET THE REQUIREMENTS OF WSDOT STANDARD <br />SPECIFICATION SECTION 8-01.3(7). <br />INSTALL DRIVEWAY CULVERT <br />IF THERE 15 A ROADSIDE DITCH <br />PRESENT <br />30' MIN TYPICAL <br />PERMEABLE BALLAST TYPICAL SEE <br />STANDARD SPECIFICATION <br />SECTION 9-03.9(2) <br />PROVIDE FULL WIDTH OF <br />INGRESS/EGRESS AREA <br />15' MIN <br />WSDOT STD PLAN 1-80.10-02 ACCEPTABLE SUBSTITUTE <br />OxCITY OF EVERETT <br />ff PUBLIC WORKS DEPARTMENT <br />" VAN H6THERGRIFFIN AIILWILHEM ' VS 04/03/2017 <br />CONSTRUCTION ACCESS 201 <br />NOTES <br />1. INSTALL THE ENDS OF THE SILT FENCE TO POINT <br />SLIGHTLY UPSLOPE TO PREVENT SEDIMENT FROM <br />FLOWING AROUND THE ENDS OF THE FENCE. <br />2. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />WSDOT STANDARD SPECIFICATIONS 8-01.3(9)A <br />AND 8-01.3(15). <br />3. SPLICES SHALL NEVER BE PLACED IN LOW SPOTS <br />OR SUMP LOCATIONS. IF SPLICES ARE LOCATED IN <br />LOW OR SUMP AREAS, THE FENCE MAY NEED TO <br />BE REINSTALLED UNLESS OTHERWISE APPROVED. <br />4. INSTALL SILT FENCING PARALLEL TO MAPPED <br />CONTOUR LINES. <br />S. DURING EXCAVATION, MINIMIZE DISTURBING <br />THE GROUND AROUND TRENCH AS MUCH AS 15 <br />FEASIBLE, AND SMOOTH SURFACE FOLLOWING <br />EXCAVATION TO AVOID CONCENTRATING FLOWS. <br />COMPACTION MUST BE ADEQUATE TO PREVENT <br />UNDERCUTTING FLOWS. <br />BACKUP SUPPORT <br />Fti0 <br />(TYPICAL) <br />�F� <br />STEEL POST <br />\ <br />(TYPICAL) -. <br />FABRIC <br />Qp0 (GEOTEXT <br />(TYPICAL) <br />BMP T5.13 POST CONSTRUCTION SOIL QUALITY AND DEPTH: <br />ALL DISTURBED AREAS, (NOT OTHERWISE COVERED BY IMPERVIOUS AREA), ON AND OFF SITE, SHALL MEET THE <br />COMPOST AMENDED REQUIREMENTS OF BMP T5131N THE 2016 SNOHaV01 COUNTY DRAINAGE MANUAL VOLUME <br />V CHAPTER 5 <br />CALCULATED AMENDMENT RATES MAYBE MET THROUGH USE OF TOPSOIL AND DUFF FROM THE PROPERTY <br />AMENDED TO MEET THE CARBON TO NITROGEN RA710 REQUIREMENTS, AND MEETING THE CONTAMINANT <br />STANDARDS OF GRADE A COMPOST <br />TOPSOIL DEPTHS SHALL HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE R007S LIMIT THE DEPTH <br />OF INCORPORATION OF AMENDMENTS NEEDED TO MEET THE CRITERIA. <br />SUBSOIL BELOW THE TOPSOIL LAYER SHOULD BE SCARIRED AT LEAST 4 INCHES WITH SOME INCORPORATION OF <br />THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS WHERE FEASIBLE. <br />SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER <br />TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE <br />FENCE AT THE OVERLAP. <br />SPLICE DETAIL <br />WSDOT STD PLAN 1-30.10-02 ACCEPTABLE SUBSTITUTE <br />EXCEPT STEEL POST REQUIRED <br />CITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />�k"AN SASS ETHER GRIFFIN AUL ILHEL nrevmpH 03/17/20 <br />TEMPORARY SILT FENCE ( 214 <br />0 20 <br />Scale 1 " = 20' <br />EiE c'® <br />3gE <br />y® <br />SURVEY BOUNDARY & TOPOGRAPHY NOTE: <br />EXIS77NG SITE FEATURES, BOUNDARY, AND TOPOGRAPHY WERE <br />PROVIDED BY A SURVEY PREPARED BY ORCA LAND SURVEYING <br />DATED 2-17-20 . <br />SEC. TWN. N, h�1�T 04E, 1VvT 114 4 (� SW 114 <br />a <br />TBM <br />EEE <br />6EE <br />, 0 <br />R/M = 12P .61 <br />lE = 126.40' PW 8" W <br />11 PVC 4' S So <br />1E = 126,29 ` ONCRETE 10" E <br />EE <br />11 <br />i v` <br />6' WOOD FENCE SOUTH / <br />RANS1?IONS TO 4' WOOD ° <br />FENCE NORTH <br />FENCE 0.3' <br />OF PROPERTY LINE <br />.u.�.- -.13 <br />EXISTING <br />FOUNDATION <br />TBR <br />j tNG l DRI WA <br />USE EX. DRIVEWAY AS <br />TEMPORARY <br />CONSIRUCTION ACCESS <br />UIVTTLL.E... RIVJ W,4 <br />R VIED <br />CONC. SLAB <br />L TBR o <br />' £'XISTIAIG <br />DRI SWAY . �.. TEA <br />.TBR . TO <br />4 <br />s <br />FINISHED TEA <br />$Ei® <br />Ei9 <br />�EXPWR <br />POLE <br />REBAR AND CAP F01I <br />1 2" REBAR "T;RI 144900 <br />TED JAaNUA . 29, 2020 <br />CHAINLINK FENCE <br />I <br />4' CHAINONK FENCE CORNER IS 0.5' EAST <br />I <br />) <br />I <br />I <br />'Y STOCKPILE FOR I <br />s DUFF - COVER 5 <br />HOURS <br />1 <br />I� <br />i <br />I <br />I <br />iY STOCKPILE FOR <br />HAnurmv - COVER WITHIN 5 s <br />FLOOR 24 H S I <br />ELEVATION '- I <br />=132.95' _. <br />HOUSE I OUSE <br />(TBR) FINIS (TBR) <br />1 FLOOR <br />1 I [CEVA 770N=134.13' <br />DECK <br />- (TBR) <br />LANDSCAPE CURB <br />i - _-132 <br />mnnn v.r_nnnw um„a 1 <br />W/ ORANGE FENCE <br />AREA OF CLEARING: " <br />°,16,782 SF ORANGE PRO7ECR1� <br />EX. TREE <br />f`' <br />FIR 2 12"DCIDIOUS <br />TBR` <br />I � <br />12' <br />Know what's below. <br />Call 811 two business days <br />before you dig. <br />0.25' SOUTH OF <br />! <br />! <br />FENCE 0.2' WEST <br />OF PROPERTY LIME ! <br />! <br />! <br />9 <br />I <br />I <br />! <br />I <br />E <br />0 <br />I <br />! <br />r <br />4' CHAINLINK FENCE <br />� I <br />I`r ! <br />r°' t <br />! <br />UTILITY CONFLICT NOTE. - <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE <br />LOCA770N, DIMENSION AND DEPTH OF ALL EXISTING U77U71ES <br />WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE <br />UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL <br />LOCATIONS PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE <br />CALLING UTILITY LOCATE AT 1-800-424-5555 AND THEN <br />POTHOLING ALL OF THE EXISTING UTILITIES AT THEIR LOCATIONS <br />OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR <br />NOT CONFLICTS EXIST. LOCATION OF SAID UTILITIES AS SHOWN <br />ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC <br />INFORMATION AND ARE SUBJECT TO VARIATION. <br />1ST REVIEW PER CITY OF EVERETT <br />LETTER DATED - 6-22-21 REVISION DATE 7-5-21 <br />VICINITY MAP <br />N. is S. <br />COVER METHODS: 5 s <br />PROTECT DISTURBED SLOPES BY MULCHING (2"-4- THICKNESS). THIS CAN BE DONE BEFORE OR AFTER PERMANENT SEEDING. THE <br />TYPES OF MULCHES AVAILABLE ARE DESCRIBED BELOW (TAKEN FROM ME D.O.E. MANUAL): <br />STRAW - MOST COMMONLY USED IN CONJUNCTION WITH SEEDING. ITS USE IS RECOMMENDED WHERE IMMEDIATE PROTECTION IS <br />REQUIRED AND PREFERABLY WHERE THE NEED FOR PROTECTION WILL BE LESS THAN 3 MONTHS THE STRAW SHOULD COME FROM <br />WHEAT OR OATS, AND MAY BE SPREAD BY HAND OR MACHINE. STRAW CAN BE WINDBLOWN AND MUST BE ANCHORED DOWN (ROLLING <br />OR PUNCHING INTO SOIL, COVERING WITH NETTING, SPRAYING TACKIFIER). CORN STALKS - THESE SHOULD BE SHREDDED INTO 4 TO <br />6-INCH LENGTHS STALKS DECOMPOSE SLOWLY AND ARE RESISTANT TO WNDBLOW. <br />WOOD CHIPSIBARK CHIPS - SUITABLE FOR AREAS THAT WILL NOT BE CLOSELY MOWED, AND AROUND ORNAMENTAL PLANTINGS CHIPS <br />DECOMPOSE SLOWLY AND DO NOT REQUIRE TACKING. WOOD CHIPS MUST BE TREATED WITH 12 POUNDS NITROGEN PER TON TO <br />PREVENT NUTRIENT DEFICIENCY IN PLANTS (NOT NECESSARY FOR BARK). WOOD AND BARK CHIPS TEND TO WASH DOWN SLOPES OF <br />MORE THAN 6 PERCENT AND CREATE PROBLEMS BY CLOGGING INLET GRATES, ETC. AND ARE THEREFORE NOT RECOMMENDED FOR USE IN <br />THOSE AREAS WOOD FIBER - USED /N HYDRO -SEEDING OPERATIONS, APPLIED AS PART OF THE SLURRY. THIS FORM OF MULCH DOES <br />NOT PROVIDE SUFFICIENT PROTECTION TO ERODIBLE SOILS TO BE USED ALONE DURING THE HEAT OF SUMMER OR FOR LATE FALL <br />SEEDINGS WOOD FIBER HYDRO -SEED SLURRIES MAY BE USED TO TACK STRAW MULCH. THIS COMBINATION TREATMENT IS WELL SUITED <br />FOR STEEP SLOPES AND CRITICAL AREAS NETS AND MATS - USED ALONE, NETTING DOES NOT RETAIN SOIL MOISTURE OR MODIFY SOIL <br />TEMPERATURE. IT STABILIZES THE SOIL SURFACE WHILE GRASSES ARE BEING ESTABLISHED, AND IS USEFUL IN GRASSED WATERWAYS AND <br />ON SLOPES LIGHT NETTING MAY ALSO BE USED TO HOLD 0774ER MULCHES IN PLACE. ITS RELATIVELY HIGH COST MAKES IT MOST <br />SUITABLE FOR SMALL SITES <br />SITE GRADING. AND E.S.C. NOTES: <br />1. APPROVAL OF THIS EROSIONISEDIMENTA7701V CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF <br />PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, <br />RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND <br />UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL <br />CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR <br />TO CONSTRUCTION. DURING THE CONS7RUC710N PERIOD, NO DIS71JRBANCE BEYOND THE FLAGGED CLEARING LIMITS <br />SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION <br />OF CONSTRUC770N. <br />4. THE ESC FACIU71ES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND <br />GRADING ACTIVITIES, AND /N SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO <br />NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUAL17Y STANDARDS <br />5. THE ESC FACIU77ES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE <br />COND17701VS DURING THE CONSTRUC770N PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR <br />UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE <br />SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT/CONTRACIi�R TO <br />ENSURE THEIR CONTINUED FUNCTIOIVING, ESPECIALLY AFTER STORM EVENTS <br />Z THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A <br />MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH <br />BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING <br />OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSIRUC7701V AND <br />MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL <br />PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT, <br />f0. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF <br />THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF 7HE <br />PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABWZED FOR NO MORE THAN 2 DAYS <br />FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />SWPPP ELEMENTS 41-4013 <br />0 ELEMENT 1: MARK CLEARING LIMITS <br />OELEMENT 2: ESTABLISH COIVSTRUCTION ACCESS <br />OELEMENT J. CONTROL FLOW RAZES <br />ELEMENT 4: INSTALL SEDIMENT CONTROLS <br />OELEMENT 5: STABILIZE SOILS SOILS TO BE STABILIZED AS <br />LISTED IN THE COVER METHOD NOTES <br />OELEMENT 6: PROTECT SLOPES CUT AND FILL SLOPES <br />SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT <br />WILL MINIMIZE EROSION. <br />OELEMENT 7.° PR07ECT DRAIN INLETS PER C.0 <br />STANDARD PLAN 210 <br />S� ELEMENT 8. STABILIZE CHANNELS AND OUTLETS <br />&LEMENT 9: CONTROL POLLUTANTS ALL POLLUTANTS, <br />INCLUDING WASTE MATERIALS AND DEMOU7101V DEBRIS THAT <br />OCCUR ON -SITE DURING CONSTRUCTION SHALL BE HANDLED <br />AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE <br />CO/E►rgMINATION OF STORMWATER. <br />10 ELEMENT 10. CONTROL DE-WA7ERING. <br />11 ELEMENT 11: MAINTAIN BMP'S <br />12 ELEMENT 12 MANAGE THE PROJECT. <br />3 ELEMENT 13.• PROTECT LID BMP'S <br />SITE ADDRESS.3618 SHORE AVE EVERETT <br />WA 98203 <br />TAX PARCEL: 00433600002700 <br />ZONING. IA <br />GROSS SIZE: 17,424 SF (0.40 AC) <br />SETBACKS: <br />FRONT 20' <br />SIDE: 5' <br />REAR: 20' <br />CITY OFIr. <br />