My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3535 RIVERFRONT BLVD 2023-02-21
>
Address Records
>
RIVERFRONT BLVD
>
3535
>
3535 RIVERFRONT BLVD 2023-02-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 10:13:37 AM
Creation date
2/21/2023 1:05:24 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3535
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
) a <br /> 2.1.7 - Element 7: Protect Drain Inlets <br /> List and describe BMPs: Storm Drain Inlet Protection (BMP C220) <br /> All storm drain inlets and catch basins made operable during construction shall be protected to <br /> prevent unfiltered or untreated water from entering the drainage conveyance system. However, <br /> the first priority is to keep all access roads clean of sediment and keep street wash water <br /> separate from entering storm drains until treatment can be provided. Storm Drain Inlet <br /> Protection will be implemented for all drainage inlets and culverts that could potentially be <br /> impacted by sediment-laden runoff on and near the project site. <br /> Inlet protection devices shall be cleaned (or removed and replaced)when sediment has filled <br /> the device by one-third (1/3)or as specified by the manufacturer. Inlets shall be inspected <br /> weekly at a minimum and daily during storm events. <br /> Installation Schedules: Storm drain inlet protection shall be installed at the beginning of <br /> construction and will be maintained and adjusted as needed. <br /> Inspection and Maintenance plan: Storm drain inlet protection shall be inspected daily to <br /> ensure it is in good condition and cleaned or replaced as needed. <br /> Responsible Staff: TBD—Construction Erosion Control Lead <br /> Page 113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.