Laserfiche WebLink
1 , <br /> Concrete and grout: <br /> ■ Process water and slurry resulting from concrete work will be prevented from <br /> entering the waters of the State by implementing Concrete Handling measures <br /> (BMP C151). <br /> List and describe BMPs: Dust Control (BMP C140); Storm Drain Inlet Protection (BMP <br /> C220); Concrete Handling measures (BMP C151); Sawcutting and Surfacing Pollution <br /> Prevention (BMP C152) <br /> Installation Schedules: Install prior to construction activities and as necessary for demolition <br /> activities and concrete delivery and work. <br /> Inspection and Maintenance plan: Inspection and Maintenance to be performed per BMP <br /> guidelines. <br /> Responsible Staff: TBD—Construction Erosion Control Lead <br /> Will maintenance, fueling, and/or repair of heavy equipment and vehicles occur on-site? <br /> ❑ Yes ® No <br /> Will wheel wash or tire bath system BMPs be used during construction? <br /> ❑ Yes ® No <br /> Will pH-modifying sources be present on-site? <br /> ❑ Yes ® No <br /> Page 116 <br />