My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3535 RIVERFRONT BLVD 2023-02-21
>
Address Records
>
RIVERFRONT BLVD
>
3535
>
3535 RIVERFRONT BLVD 2023-02-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 10:13:37 AM
Creation date
2/21/2023 1:05:24 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3535
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.12 - Element 12: Manage the Project <br /> The project will be managed based on the following principles: <br /> • Projects will be phased to the maximum extent practicable and seasonal work limitations <br /> will be taken into account. <br /> • Inspection and monitoring: <br /> o Inspection, maintenance, and repair of all BMPs will occur as needed to ensure <br /> performance of their intended function. <br /> o Site inspections and monitoring will be conducted in accordance with Special <br /> Condition S4 of the CSWGP. Sampling locations are indicated on the Site Map. <br /> Sampling station(s) are located in accordance with applicable requirements of the <br /> CSWGP. <br /> • Maintain an updated SWPPP. <br /> o The SWPPP will be updated, maintained, and implemented in accordance with <br /> Special Conditions S3, S4, and S9 of the CSWGP. <br /> As site work progresses the SWPPP will be modified routinely to reflect changing site <br /> conditions. The SWPPP will be reviewed monthly to ensure the content is current. <br /> Table 5—Management <br /> X Design the project to fit the existing topography, soils, and drainage patterns <br /> X Emphasize erosion control rather than sediment control <br /> X Minimize the extent and duration of the area exposed <br /> X Keep runoff velocities low <br /> X Retain sediment on-site <br /> X Thoroughly monitor site and maintain all ESC measures <br /> X Schedule major earthwork during the dry season <br /> Other(please describe) <br /> Page I20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.