Laserfiche WebLink
6.2 - Reporting <br /> 6.2.1 - Discharge Monitoring Reports <br /> Cumulative soil disturbance is one (1) acre or larger; therefore, Discharge Monitoring <br /> Reports (DMRs)will be submitted to Ecology monthly. If there was no discharge during a given <br /> monitoring period, the DMR will be submitted as required, reporting "No Discharge."The DMR <br /> due date is fifteen (15) days following the end of each calendar month. <br /> DMRs will be reported online through Ecology's WQWebDMR System. <br /> 6.2.2 - Notification of Noncompliance <br /> If any of the terms and conditions of the permit is not met, and the resulting noncompliance may <br /> cause a threat to human health or the environment, the following actions will be taken: <br /> 1. Ecology will be notified within 24 hours of the failure to comply by calling the applicable <br /> Regional office ERTS phone number(regional office numbers listed below). <br /> 2. Immediate action will be taken to prevent the discharge/pollution or otherwise stop or <br /> correct the noncompliance. If applicable, sampling and analysis of any noncompliance <br /> will be repeated immediately, and the results will be submitted to Ecology within five (5) <br /> days of becoming aware of the violation. <br /> 3. A detailed written report describing the noncompliance will be submitted to Ecology <br /> within five (5)days, unless requested earlier by Ecology. <br /> Any time turbidity sampling indicates turbidity is 250 NTUs or greater or water transparency is 6 <br /> cm or less, the Ecology Regional office will be notified by phone within 24 hours of analysis, as <br /> required by Special Condition S5.A of the CSWGP. <br /> • Southwest Region at (360)407-6300 for Clallam, Clark, Cowlitz, Grays Harbor, <br /> Jefferson, Lewis, Mason, Pacific, Pierce, Skamania, Thurston, or Wahkiakum <br /> Include the following information: <br /> 1. Your name and /Phone number <br /> 2. Permit number <br /> 3. City/County of project <br /> 4. Sample results <br /> 5. Date/Time of call <br /> 6. Date/Time of sample <br /> 7. Project name <br /> In accordance with Special Condition S4.D.5.b of the CSWGP, the Ecology Regional office will <br /> be notified if chemical treatment other than CO2 sparging is planned for adjustment of high-pH <br /> water. <br /> Page I28 <br />