Laserfiche WebLink
Table of Contents <br /> 1.0 Project Information 4 <br /> 1.1 - Existing Conditions 4 <br /> 1.2 - Proposed Construction Activities 6 <br /> 2.0 Construction Stormwater Best Management Practices (BMPs) 7 <br /> 2.1 -The 12 Elements 7 <br /> 2.1.1 - Element 1: Preserve Vegetation/ Mark Clearing Limits 7 <br /> 2.1.2 - Element 2: Establish Construction Access 8 <br /> 2.1.3 - Element 3: Control Flow Rates 9 <br /> 2.1.4 - Element 4: Install Sediment Controls 10 <br /> 2.1.5 - Element 5: Stabilize Soils 11 <br /> 2.1.6- Element 6: Protect Slopes 12 <br /> 2.1.7 - Element 7: Protect Drain Inlets 13 <br /> 2.1.8 - Element 8: Stabilize Channels and Outlets 14 <br /> 2.1.9 - Element 9: Control Pollutants 15 <br /> 2.1.10 - Element 10: Control Dewatering 18 <br /> 2.1.11 - Element 11: Maintain BMPs 19 <br /> 2.1.12 - Element 12: Manage the Project 20 <br /> 2.1.13 - Element 13: Protect Low Impact Development (LID) BMPs 21 <br /> 3.0 Pollution Prevention Team 22 <br /> 4.0 Monitoring and Sampling Requirements 23 <br /> 4.1 - Site Inspection 23 <br /> 4.2 - Stormwater Quality Sampling 23 <br /> 4.2.1 -Turbidity Sampling 23 <br /> 4.2.2 - pH Sampling 25 <br /> 5.0 Discharges to 303(d) or Total Maximum Daily Load (TMDL) Waterbodies 26 <br /> 5.1 - 303(d) Listed Waterbodies 26 <br /> 5.2 - TMDL Waterbodies 26 <br /> 6.0 Reporting and Record Keeping 27 <br /> 6.1 - Record Keeping 27 <br /> 6.1.1 - Site Log Book 27 <br /> Page 11 <br />