My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3535 RIVERFRONT BLVD 2023-02-21
>
Address Records
>
RIVERFRONT BLVD
>
3535
>
3535 RIVERFRONT BLVD 2023-02-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 10:13:37 AM
Creation date
2/21/2023 1:05:24 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3535
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 11-4.2.1 Runoff Conveyance and Treatment BMPs by SWPPP <br /> Element (continued) <br /> Ele- Element Ele- Element Ele- <br /> ment #4 Ele- ment #8 Stab- Element ment Element <br /> BMP or Ele- #3 Install ment #7 Pro- ilize #10 #13 Protect <br /> Con- Sect- #6 Pro- Chan- 9 Con- Control Low Impact <br /> ment Name iment tect tect nels 1trol Pol- <br /> trol De- Devel- <br /> Flow Con- Slopes Drain and Out- lutants Water- opment <br /> Rates trols Inlets lets ing <br /> for High pH <br /> Water <br /> (p.412) <br /> BMP C200: Interceptor Dike and Swale <br /> Purpose <br /> Provide a ridge of compacted soil, or a ridge with an upslope swale, at the top or base of <br /> a disturbed slope or along the perimeter of a disturbed construction area to convey storm- <br /> water. Use the dike and/or swale to intercept the runoff from unprotected areas and direct <br /> it to areas where erosion can be controlled. This can prevent storm runoff from entering <br /> the work area or sediment-laden runoff from leaving the construction site. <br /> Conditions of Use <br /> Where the runoff from an exposed site or disturbed slope rnust be conveyed to an <br /> erosion control facility which can safely convey the stormwater. <br /> . Locate upslope of a construction site to prevent runoff from entering disturbed area. <br /> . When placed horizontally across a disturbed slope, it reduces the amount and velo- <br /> city of runoff flowing down the slope. <br /> . Locate downslope to collect runoff from a disturbed area and direct water to a sed- <br /> iment basin. <br /> Design and Installation Specifications <br /> . Dike and/or swale and channel must be stabilized with temporary or permanent <br /> vegetation or other channel protection during construction. <br /> . Channel requires a positive grade for drainage; steeper grades require channel <br /> protection and check darns. <br /> . Review construction for areas where overtopping may occur. <br /> . Can be used at top of new fill before vegetation is established. <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume ll- Chapter 4 -Page 3.31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.