Laserfiche WebLink
4.5.3 Shallow Foundation Recommendation Outside the Surcharged Area 18 <br /> 4.6 STORMWATER MANAGEMENT 19 <br /> 1 4.7 IMPROVEMENTS FOR CRANE AND VIEWING PLATFORM 19 <br /> 4.7.1 Crane Foundation 19 <br /> I <br /> 4.7.2 Sheet Pile Wall Design 21 <br /> 4.8 PAVEMENT RECOMMENDATIONS 24 <br /> 4.8.1 Trail Pavement 24 <br /> 4.8.2 Design Traffic 24 <br /> 4.8.3 New Hot-Mix Asphalt(HMA)Pavement Design 24 <br /> 4.8.4 Parking Lot Pavement 25 <br /> 4.8.5 Subgrade Preparation 25 <br /> 111 4.8.6 Pavement Drainage 26 <br /> I 4.9 GENERAL EARTHWORK 26 <br /> 4.9.1 Structural Fill 26 <br /> 4.9.2 Compaction 26 <br /> 4.9.3 Wet Weather Earthwork 27 <br /> 4.9.4 Temporary Excavations 27 <br /> 5.CONDITIONS AND LIMITATIONS 27 <br /> 6.REFERENCES 30 <br /> IFIGURES (Following Text) <br /> Figure 1 Vicinity Map <br /> IFigure 2 Site and Exploration Plan <br /> Figure 3A Geologic Profile A-A' <br /> Figure 3B Geologic Profile B-B' <br /> IFigure 3C Geologic Profile C-C' <br /> Figure 3D Geologic Profile D-D' <br /> Figure 4 Groundwater Elevation Plot for BH-105 <br /> Figure 5A Liquefaction Along Geologic Profile A-A' <br /> Figure 5B Liquefaction Along Geologic Profile B-B' <br /> Figure 5C Liquefaction Along Geologic Profile C-C' <br /> Figure 5D Liquefaction Along Geologic Profile D-D' <br /> I <br /> Final Geotechnical Report-3-Acre Park.docx ii HWA GeoSciences Inc. <br />