My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8221 XAVIER WAY 2025-04-21
>
Address Records
>
XAVIER WAY
>
8221
>
8221 XAVIER WAY 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 2:25:44 PM
Creation date
2/22/2023 1:08:32 PM
Metadata
Fields
Template:
Address Document
Street Name
XAVIER WAY
Street Number
8221
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inventory Material Journalized in <br />01/27/2023 For $ 936.88 . <br />Work Activity Work Order Page 1 <br />1/27/2023 11:97 <br />Issued By BAP BIGLEY, RYAN P. <br />Issued Department PW PUBLIC WORKS <br />Dale Issued ar9mt9 <br />Fund at Account s Program Function Activity <br />Program UIIC73 18 3 <br />Title CONVERT.75 INCH 8221 XAVIER WAY UT3473-18-3 <br />Work Order No 20192055 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br />Status BI9I2019 Time 13:39 Original WO Billing <br />Customer Information <br />Customer Name <br />Address <br />A Parent No <br />State <br />Subdivision <br />Phone No ) <br />Second Phone ( J <br />E-Mail Address <br />Problem Information <br />Address 8221 <br />From Cross Street <br />To Cross Street <br />City <br />Subdivision <br />Street <br />City <br />Zip <br />Ent <br />Ext <br />Street XAVIER WAY <br />IuERL•2 <br />Problem WATER WATER <br />Sub Problem OTHER OTHER <br />Requested By <br />Agency <br />Initiated From <br />Utility Locate (USA) No Called Date <br />Assignment Information <br />Dept <br />Crew <br />Contactor <br />Assigned To <br />Assigned By <br />Customer Id <br />Change Map Ygl <br />Zip <br />Map Reference <br />Dale Requested <br />Related Request <br />Expiration Date <br />Priority Estimated Hours <br />Assigned Data To Be Camp Date <br />Scheduled Data Scheduled Time <br />Route Route Sequence <br />Comments INVENTORY MATERIAL IN THE AMOUNT OF$931 JOURNALIZED IN <br />2019 <br />Action Taken CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND BOX FLAT TO METER <br />PROJECT. <br />Recommended Action <br />Approved By Job Cost Information(YIN) <br />Star Data I I Time Date Completed 1i Permit No <br />
The URL can be used to link to this page
Your browser does not support the video tag.