Laserfiche WebLink
Work Activity Work Order <br />Page 2 <br />1/30/2023 <br />8:16 <br />Issued By <br />am BIGLEY. ITKM P. <br />Issued Deparlmentm <br />PUBLIC waeKs <br />Date Issued <br />llIV2019 <br />Fund <br />401 Accounts Program Function <br />Activity <br />Program <br />M473 19 3 <br />Title <br />CONVERT./S INCH 212174TH ST BE UT3473193 <br />We* Order No <br />20192682 Project Activity Type CORRECTIVE MAINTENMCE <br />Status <br />a <br />Status <br />111412019 Time 1240 Original WO Billing <br />Completed By <br />Time Follow Up? <br />Problem Details <br />CONVERT.TSINCH CURBSTOP TO.TS INCH SETTER WITH METER AND <br />BOX. FLAT TO METER <br />PROJECT. <br />Structure ID <br />StrTvO Activity Comol <br />Date <br />Comments <br />WSOP55Em5 <br />WASRVC YES <br />1130I2023 <br />Address <br />2121 74TH ST BE <br />Cross Street <br />Area Designator <br />Structure Location <br />Map Reference <br />74TH ST-2121 <br />Location <br />Material Costs <br />Billing <br />Type Meter No <br />Description <br />Quantity <br />Cost <br />Dale <br />Warshou: <br />M ADAP34000"1 <br />ADAPTER 3/4 PIP X T41PS INSTA-TITE <br />2 <br />33.518 <br />11M2019 <br />PAN <br />M ADAPM000547 <br />ADAPTER 3/4 MIP X W41PS INSTA-TITE <br />2 <br />32.338 <br />UXXV2019 <br />PAN <br />M BOX00015434T <br />BOX METER MOLDED PLASTIC WIDI LID 11"X I (SMALL) <br />1 <br />75459 <br />11/052019 <br />PAN <br />M DON PM142747 <br />COUPLING 314 CTS COMPRE881CN X 314 MIPB71-879 <br />1 <br />1178 <br />11N 019 <br />PAN <br />M COUP34003947 <br />COUPLING 314 REM COP SWL THD X 3/4 FOR COP 114 BEND ELBOW <br />1 <br />20.266 <br />11I 019 <br />PAN <br />M ELLOSV04241 <br />ELBOW 3I4 NET 90 DEG STREET BRASS(114 BEND) <br />1 <br />3.958 <br />111052019 <br />PAN <br />M MIETE34141847 <br />METER 518 X 314 NEPTUNE W/E-CODER RMI CU FT STUB AMENNA <br />1 <br />210.287 <br />111EZK19 <br />PAN <br />M PIFEM060647 <br />PIPE 314 POLY IPS 200 PSI SIDRT ASTM W239 <br />3 <br />1.028 <br />111 019 <br />PAN <br />M SETT3449747 <br />SETTER COPPER SM X 3/4 HEIGHT T' NO LEG LENGTH VWO <br />1 <br />107,246 <br />11I05/2019 <br />PAN <br />Total Material Cost <br />SWES1 <br />NA Costs <br />Type No No <br />Description <br />Quantity <br />Cost <br />Billing Data Warshow <br />NA N/A <br />3I4 MINUS ROCK <br />.25 <br />6.406 <br />1IM512019 <br />NA N/A <br />TOPSOIL <br />.13 <br />3.851 <br />1NOV2019 <br />NA N/A <br />TRACING WIRE <br />3 <br />.6 <br />UJOW019 <br />NA N/A <br />WIRE CUMP <br />1 <br />1.58 <br />11N5Q019 <br />Total NA Coat SUM <br />Total Cost $5O8.35 <br />