|
N11, AN to rol\� F
<br />1Vrrnt Corrct!on5
<br />3.18.22 b01C
<br />SEE CONNECTION
<br />TO MULLION
<br />DETAIL E/2.
<br />DLKG. FOR COAT
<br />H00<5 9 +45-63' AFF:
<br />BLKG. FOR COAT
<br />HOOKS Q +45-63"
<br />3LKG. FOKCEILING-WI),
<br />MICROSCOPE, TO 3E
<br />J013 511E LOCATED,
<br />TYP. OP5 #i - #3
<br />Ff' 1 i (; DIMENSIONING FL/'`N,,
<br />1 f f I f r -P _p S I MO�VID 6)12 D- E e A ] +(2 FF�
<br />f S TOTOP CRICA LL PANELTURNEP IN
<br />f L TOWARDS STORAGE ROOM �(
<br />i 2° 4' 1'P' 5-1112, 2 ����� 7 �
<br />v v •v 'v
<br />FRAMING / PIMEN510NING FLAN,
<br />0
<br />W/�LL SCHEDULE
<br />EXISTING EXTERIOR WALLS
<br />NEW INTER10K PARTITION
<br />EXISTING INTERIOR PARTITI.ON TO 4 M
<br />S
<br />,f-rrs sssss s sss NEW WALLS WITH-WINSULATION VALUES 1
<br />i _. ONE HOUR RATED ENGL05UR_ ®, _
<br />INFITr7/�,-MFP_0_VED WINDOWS
<br />FRAMING 13LOMNG
<br />FE� FIRE EXTINGUISHER
<br />(Type IIA-1013 in Rece55ed Cabinet)
<br />11
<br />jtvr Fad I-jo5,o 4��d-F
<br />® -i/fP�/_F7_0P 6JO
<br />S 171P � 130'r �5AIi5
<br />VAN,�`�
<br />Cl
<br />>?;
<br />1. The design and specifications shown herein illustrate our design intent. We
<br />welcome all input on potential product substitutions or alternate ways of
<br />doing things that could save time and/or cost.
<br />2. Submittals for cabinet shop drawings (including PVC edgebanding), paint and
<br />wood -stain drawdowns are required for review by Designer. For all other
<br />items, no submittal is required when there is no substitute to that which is
<br />specified on these plans. Only provide submittals for those items that are
<br />different from what is noted on these plans.
<br />3. Contractor shall verify filed dimensions after demolition and report any
<br />discrepancies to Designer before proceeding. DO NOT SCALE THESE
<br />DRAWINGS FOR CRITICAL DIMENSIONS. Use dimensions given.
<br />4. Building a dental facility requires attention to detail. It is expected that a high
<br />degree of attentiveness will be delivered throughout.
<br />5. Any items or surfaces which are unspecified as to dimensions, material and/or
<br />color are to be brought to the Designer's attention before proceeding with
<br />making that selection arbitrarily.
<br />6. All items shown or specified on these plans shall be provided and installed by
<br />the General or appropriate Sub -Contractor, unless noted otherwise.
<br />7. New construction shall conform to International Building Code, 2018 Edition,
<br />min. requirements for a Type V-B, non-sprinklered construction throughout a
<br />Business Group B occupancy.
<br />8. General Contractor shall remove existing window coverings prior to
<br />demolition, clean, and re -install after all work in the Suite has been completed.
<br />9. General Contractor to leave all plastic coverings on troffers until heating
<br />system has been blown out.
<br />lo. All installed flooring and counters should be fully covered until all construction
<br />is completed.
<br />11. General Contractor shall thoroughly clean the entire suite, including interior
<br />face of exterior windows, after all disciplines are completed with work, and
<br />prior to Client move -in.
<br />12. Design of new or relocation of existing HVAC by Sub -Contractor. Insulate
<br />mechanical supply ducts with batting or duct board. Maximum 12' flex duct
<br />runs. Minimum (4) zones. All thermostat locations must be verified
<br />w/Designer, or may need to be relocated. Design must be submitted to
<br />Designer for review before supplies and returns are roughed -in.
<br />13. If ceiling cavity is a return -air plenum, all trades working in plenum must
<br />meet all applicable codes. A sound boot is required in all plenum -rated return -
<br />air grilles.
<br />14. Where required, provide smoke detectors to code. Provide fire extinguisher in
<br />recessed cabinet located as indicated on Sheets 1 & 3. Paint metal cabinet to
<br />match partitions.
<br />1.,. Typical partition construction: 1-1/2" x 3-1/2" metal studs (16" o.c.) with 5/8"
<br />Type'X' GWB each side. Smooth partition, no texture. See Detail B/2.
<br />Extend partitions to structure, hang GWB ceiling at +7'-7" (existing height)
<br />above finished floor unless otherwise noted. See Detail D/2 for one hour rated
<br />enclosures at Mechanical Room in Basement and J/2 for Nitrous Closet
<br />outside.
<br />16. Insulate all partitions with sound attenuation batting per Details B/2 and A/2.
<br />17. Plumbing partitions with toilet drains are shown as 2X6 construction.
<br />18. X-rays and Panclipse typically require framing blocking to withstand 1500#
<br />torque. Verify blocking requirements and locations with Dental Technician.
<br />19. Line all walls of Cone Beam enclosure with an additional layer of 5/8" GWB
<br />for scatter protection.
<br />20. General Contractor to provide backing for all partition -hung cabinets as
<br />required by Cabinetmaker. General Contractor to provide i" square tubular
<br />steel 'L' brackets for unsupported countertops, attached to framing. See
<br />Detail 1/2. Suggested locations for counter supports are noted on Elevation
<br />views. Verify heights, locations, gauge, and weight requirements with
<br />Cabinetmaker. Painter to paint any exposed supports to match partition.
<br />21. Cabinetmaker to use on -site field framing dimensions for all fabrications.
<br />22. Dental Technician and Operatory Cabinetmaker shall work with Contractor
<br />and Sub -Contractors on exact locations and specific requirements for dental
<br />equipment. Appropriate parties should be asked to provide templates for
<br />locations of all stub -outs and blocking points for dental equipment. General
<br />Contractor to coordinate on -site layout meeting between Cabinetmaker,
<br />Plumber and Electrician when partitions have been chalked.
<br />Dental Equipment Technician: To Be Determined
<br />Microscope Equipment Technician: T.B.D.
<br />Operatory Cabinetmaker: T.B.D.
<br />2.3. General Contractor to contact the following parties when partitions are open
<br />to receive wiring:
<br />Telephone: To Be Determined
<br />Computer: T.B.D.
<br />Sound Systern: T.B.D.
<br />Communication System: T.B.D.
<br />24. For bidding purposes only, this facility should be considered a Level 3 for
<br />Operatories #1 - #3 and Level 2 for Procedure Room #1 - #3, as defined by the
<br />2018 NFPA-99. Upon award of the contract, the General Contractor must
<br />confirm the level required for this practice with the 3rd-Party Verifier and the
<br />Doctor before proceeding with the design and construction of the systems.
<br />2r. Nitrous/Oxide Tank Storage Rooms (and Mechanical Rooms for Category 1
<br />facilities): Must be i-hour construction and meet venting requirements of
<br />2018 International Fire Code, Section 53o6: See Detail J/2; and requirements
<br />of the 2o18 NFPA-99. Depending on the level of verification required for this
<br />practice, additional requirements for the construction of the enclosures, types
<br />of equipment and uninterrupted power supply may be required. All
<br />requirements are to be determined by a certified 3rd-Party Verifier prior to
<br />Medical gas systems and dental vacuum lines require wet -stamped drawings
<br />and verification by a certified 3rd-Party Verifier according to the requirements
<br />of the State code and 2018 NFPA-99. these systems must meet the
<br />requirements of NFPA-99 for the level of verification required based on the
<br />practice requirements as defined by 2018 NFPA-99. Early planning and
<br />coordination between Verifier, Plumber, Dental Technician and Doctor is
<br />required to confirm the level of verification required for the Med Gas and
<br />Vacuum systems. The General Contractor or Plumbing Sub -Contractor is
<br />responsible to establish this relationship and determine all requirements prior
<br />to construction. Outlets and locations noted on these plans should be
<br />considered general information as the design must be drawn by the Plumber
<br />and verified by the 3rd-Party Verifier prior to constcuction,
<br />26. Provide solid framing blocking behind ceiling -mounted Operatory track light
<br />per manufacturer's specifications. Bracing to be mounted behind GWB ceiling
<br />and secured to building structure.
<br />27. Provide blocking for Lead Apron Racks in Operatories and Panelipse Room,
<br />where noted.
<br />28. Height differences between flooring materials shall bevel at a ratio of 1:2 if
<br />greater than 114" per ADA and accessibility codes.
<br />29. Insulate Mechanical Room on all partitions and inside of door with Armstrong
<br />#741, 12"X12" Fine Fissured T&G Ceiling Tile (or equal sound rating) -
<br />aahesive installation.
<br />1 `r,
<br />2o. Safety lass installed where required per 2018 IBC, Chapter 24, Section 240�(
<br />31. Identification signag e provided and installed by others.
<br />0
<br />+ j E .2)
<br />�p
<br />.E CO
<br />M
<br />�n
<br />M
<br />- FRAMING CL/M
<br />- VMLL SCHEDULE
<br />- GENEFAL CONSTR.
<br />NO LES
<br />DATE; 11.5.2021
<br />SCALE: 1/4''=T_011
<br />DRAWN: baC
<br />JOB: YOUN
<br />SHEET. 1
<br />+ 2 COVER
<br />OF: 9 SHEETS
<br />
|