Laserfiche WebLink
REVISIONS BY <br />Permit Corrections <br />1 3.18.22 bGIC <br />I-FOVDE BLOCKING, FOWEK, <br />AND CABLE FOF CEILING <br />MOUNTED MICR05COFE, TO BE J0I3- <br />SITE LOCATED BY MICKOSCOFE <br />SUFFLIEP, TYF. <br />AND CABLE FOIE CEILINGq-1i <br />MOUNTED MICF�OSCOFE, TO 6E JOv- Tyr. <br />SITE LOCATED 13Y MICFOSCOFE SEE DETAIL B/4 <br />SUFFLIER, TYF. <br />FEFLECTEP CLIGHTING PLAN, FLOOF <br />SCALE: <br />J-S� f� P _f I I 0,_p s``!`'f" J - I f I I I I I I`,-P&1 0 ,0 ,0 ,�_/`v,�_f, <br />(_1) ,,,s.f`•f J <br />FEFLECTEP (FILING & LIGHTING FLAN, 13ASEMENT <br />a 41 2! 0 <br />5/5" GW[3 O.C. 31/2" <br />MTL STUDS f\5 FEUD <br />SOFFIT DETPAIL 9 GFEET & CHECK-OUT <br />N.T.S. <br />L 411 1k 5' l <br />11 <br />GWB CEILING <br />5/8" GW O.C. 31/2" <br />MTL STUDS A5I2EQ'D <br />LED LIGHT COVE IN OF5 #1- #3 <br />LIGHT FIXTURE SCHEDULE <br />NOTE: Use only UL approved fixtures. Any substitutions of non -rated <br />fixtures are not approved by designer. <br />TYPE <br />QTY <br />SPECIFICATION <br />1 X 4 LED Fixture: Corelight Divide <br />A <br />3 <br />#DSIWS4L401BUNVSU-JB4 <br />Suface mount, Light Level 4 with Emergency battery <br />Lamp: LED 74.4W 4000°K color temperature) <br />1 X 4 LED Fixture: Corelight Divide <br />B <br />4 <br />#DSIWS4L401 UNVSU-JB4 <br />Suface mount, Light Level 4 <br />Lamp: LED 74.4W 4000°K color tea erature <br />1 X 4 LED Fixture: Corelight Divide <br />C <br />5 20 <br />#DSIWS2L401 UNVACSU-JB4 <br />S <br />Suface mount, Light Level 2 <br />Lamp: LED 45.4W 4000°K color tea erature <br />Suspended 1 X 4 LED Fixture: Corelight Divide <br />D <br />2 <br />#DSIWS2L401 UNVAC1 20JB4 <br />Suspended, Light Level 2 <br />Lam : LED 45.4W 4000°K color temperature) <br />LED Strip Light (mounted above header): <br />E <br />1 <br />Lithonia ZL1 N L48 3000LM L/LENS MVOLT 35K, or equal <br />LED 33W 48" length <br />6" LED Wafer Thin Recessed Downlight <br />[\F <br />5 30 <br />Lithonia WF6LED40KMW <br />C� <br />Lamps: 1200lumen LED4000°K(color temperature) 13.6W <br />Recessed 4" LED downlight: <br />G <br />7 <br />Juno 4" #17HYP2 Series Hyperbolic Reflector Trim Module <br />Clear Alzak cone w/ white trim ring, ICI RALEDG4 remodel housing <br />Lamps: LED 10.2W3500°K(color temperature) <br />Dental Track -Pole -Wall light: Verify spec. with Dental Tech. <br />H <br />t.bA <br />Furnished by Owner, installed by Contractor. Backing <br />required. (exempt) Hard -wired individually. <br />Wall -Mount Vanity Fixture: Hinkley Filmore #5162HB 2 light Vanity Fixture <br />1 <br />2 <br />Finish: Oil Rubbed Bronze with Heritage Brass, Dims: 16"W X 7.5"H <br />Lamps: 2 100W Vintage Filmament Bulbs <br />Under cabinet fixture: Kelvix UniCab 22" L. <br />J n <br />#UC22-3040-010V-120/277-WH <br />J <br />S 3 <br />Lamp: Adj. 3000°K - 4000°K (color temperature). (121/0 <br />C� f <br />To be installed @ front of cabinet behind light valance. <br />See Detail A/6 for clarification. <br />Under cabinet fixture: Kelvix UniCab 32" L. <br />K <br />n <br />3 <br />#UC32-3040-010V-120/277-WH <br />Lamp: Adj. 3000°K - 4000°K (color temperature). (151M <br />�^ <br />To be installed @ front of cabinet behind light valance. <br />See Detail A/6 for clarification. <br />Under cabinet fixture: Kelvix UniCab 40" L. <br />J <br />#UC40-3040-010V-120/277-WH <br />L <br />5 10 <br />Lamp: Adj. 3000°K - 4000°K (color temperature). (201M <br />v <br />To be installed @ front of cabinet behind light valance. <br />See Detail A/6 for clarification. <br />Wall -Mount Vanity Fixture: Kohler Components #K-23464-SCLED-BGL <br />M <br />1 <br />24"W LED Sconce in Modern Brushed Gold - BGL <br />Lam s: intra al LED 12W <br />Decorative LED pendant fixture: dweLED by WAC Lighting <br />N <br />2 <br />Houdini LED Chandelier #PD-55906 BK/AB, Black / Aged Brass <br />Lamps: 6 li ht, 427 lumenes, 16W <br />LED Tape Light: Nora Lighting, Hi -Output LED tape light #NUTP8-LED <br />O <br />-88 feet <br />Electrician to verify exact length to be ordered. Switched on dimmers. <br />Lamp: LED 3500°K color temperature). 4W / foot <br />Sloped ceiling cans: Elco Lighting 5" LED IC Airtight Sloped Ceiling <br />P <br />3 <br />Remodel Housing #EL590RICA with Refloctor Trim: EL5123OW <br />W'ote. 10501m, 30000K color temperature). 39W <br />Q-1 <br />4 <br />Ceiling mounted Exit sign (Battery Back -Up): <br />Precise Edge -lit LED Lithonia LRP1GC120/277ELN <br />Q 2 <br />1 <br />Back mounted Exit sign (Battery Back -Up): <br />Precise Edge -lit LED Lithonia LRP1 GC1 20/277ELN <br />R <br />5 <br />Ceiling mntd Exit sign, 2-sided, directional indicators noted on RCP <br />Precise Edge -lit LED Lithonia LRP2GC120/277ELN(battery backup) <br />Emergency Pathway Lighting: <br />S <br />9 <br />Eaton Sure-Lite #CU2-LED, White, with battery back-up, <br />Color: White. <br />T <br />3 <br />Recessed Exhaust Fan on switch: <br />Nu -Tone QTXEN150 150CFM , orequal <br />U <br />4 <br />Recessed Exhaust Fan on switch: <br />Nu -Tone QTXEN200 200CFM , orequal <br />V <br />1 <br />Recessed Exhaust Fan on Thermostat: <br />Nu -Tone QTXEN080 80CFM , orequal <br />Recessed Exhaust Fan on Thermostat: <br />W <br />1 <br />CFM requirements to be provided by Dental Tech based on equipment <br />specified. <br />2018 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over stories and all R1 <br />Administered by_�©2pa2v <br />Project & Applicant <br />Information <br />Project Title <br />Dr. Tae Youn, Dr. Lewina Youn -2018 WSEC <br />For Building Department Use: Date: Mar 31, Z�22 <br />In l f <br />Project Address <br />1429 N. Broadway Ave. <br />Everett, WA 98201 <br />Applicant Name <br />Bobbi Chapman <br />Applicant Phone <br />360-417-2634 <br />Applicant Email <br />becdesigns@gmail.com <br />For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waeneigycodes.eom <br />General Occupancy <br />All Commercial <br />General Building Use Type <br />Office, Medical <br />Building Cond. Floor Area <br />3,376 <br />General Project Types <br />Alteration <br />New Building or <br />Addition <br />Lighting Scope <br />Alteration <br />Lighting Scope <br />Interior Lighting <br />Project Cond. Floor Area <br />3,376 <br />Floors Above Grade <br />I <br />Compliance Method <br />Compliance Method 1 - General <br />Lighting Project Description <br />Tenant improvement with new lighting to be installed. <br />Lighting Compliance Scope <br />Project Type <br />Interior / Exterior <br />Luminaire Replacement Scope <br />Compliance Method <br />LPA Calculation <br />Compliance Verification <br />and Method <br />(Interior rndudes both interior & parking) <br />Adjustment <br />Alteration <br />Interior Lighting <br />50% of more replaced <br />Space by space <br />No Calculation Adjustments allowed <br />COMPLIES <br />Additional Efficiency <br />Options Included <br />Interior Lighting Power Allowance -.Space by Space <br />General Space Type <br />Specific Space Type <br />Ceiling <br />Gross Interior Area (SF) <br />LPA (Watts/SF) <br />Total Watts Allowed <br />Total Proposed Watts <br />Compliance Status <br />Height (Ft) <br />(SF x LPA x 1) <br />(LPD + Display LPD) <br />Corridors <br />General <br />707 <br />0.41 <br />290 <br />Electrical/mechanical <br />23 <br />I.0.43 <br />10 <br />Electrical/mechanical <br />16 <br />0.43 <br />7 <br />Electrical/mechanical <br />30 <br />0.43 <br />13 <br />Electrical/mechanical <br />64 <br />0.43 <br />27 <br />Laboratory <br />General <br />112 <br />1.33 <br />149 <br />Laundry/washing area <br />57 <br />; 0.53 <br />30 <br />Lobby <br />General <br />179 <br />0.84 <br />150 <br />Locker room <br />48 <br />'.0.52 <br />25 <br />Lounge/breakroom <br />General <br />451 <br />0.59 <br />266 <br />Office <br />Enclosed less than 250 sf <br />125 <br />0.74 <br />93 <br />Office <br />Open plan <br />205 <br />0.61 <br />125 <br />Restroom <br />General <br />153 <br />0.63 <br />97 <br />Stairwell <br />General <br />129 <br />0.49 <br />63 <br />Storage room <br />50-100 sf <br />58 <br />0.38 <br />22 <br />Healthcare facility <br />Exam/treatment room <br />846 <br />1.40 <br />1,185 <br />Healthcare facility <br />Imaging room <br />74 <br />0.94 <br />69 <br />Healthcare facility <br />Nurse station <br />75 1 <br />1.17 <br />88 <br />Proposed Total LPD <br />- - 2568.5 <br />Totals <br />2,708 <br />2,568 <br />COMPLIES <br />Proposed Lighting Power Density <br />Watts or <br />Total Watts <br />Fixture Type <br />Fixture ID <br />Quantity of <br />Wattage Limit <br />Total Linear <br />Watts per Linear <br />Proposed <br />Fixtures (#F) <br />per Fixture <br />Feet (LF) <br />Foot (WpLF) <br />(#F x WpF) or <br />(WpF) <br />�(LFx WpLF) <br />Individual Fixtures <br />Decorative <br />'N' <br />2 <br />96 <br />'192 <br />Troffer <br />'A' <br />3 <br />30 <br />90 <br />Troffer <br />C' <br />20 <br />22 <br />448 <br />Troffer <br />B' <br />4 <br />30 <br />120 <br />Recessed downlight <br />'P' <br />3 <br />39 <br />117.-' <br />Recessed downlight <br />'F <br />2 <br />14 <br />27 <br />Recessed downlight <br />'F-2' <br />2 <br />14 <br />27 <br />Recessed downlight <br />T' <br />6 <br />14 <br />82 <br />Recessed downlight <br />'G' <br />7 <br />1071 <br />Recessed downlight <br />'F <br />6 <br />14 <br />' $2'•`- <br />Recessed downlight <br />'F' <br />14 <br />14 <br />190 <br />Suspended <br />'D' <br />2 <br />22 <br />45 <br />Task lighting <br />'h <br />3 <br />15 <br />45 <br />Under -cabinet <br />'L' <br />10 <br />20 <br />200 <br />Under -cabinet <br />T <br />3 <br />12 <br />36 <br />Wall -mounted <br />11, <br />2 <br />200 <br />400 <br />Wall -mounted <br />'E' <br />1 <br />33 <br />33 <br />Wall -mounted <br />'M' <br />'1 <br />12 <br />12, <br />Linear Fixtures <br />LED ship <br />'O' <br />88 <br />4 <br />352 <br />Proposed Total LPD <br />2568,5 <br />Dr. The Youn, Dr. Lewina Youn - 2018 WSEC <br />GENERAL CEILING & LIGHTING NOTES <br />1. GWB Ceiling at same height as currently. <br />2. Undercabinet lighting: Electrician to provide conduit to each undercabinet <br />light bank and install fixtures after cabinetry has been installed. Sizes <br />have been specified per plans, but may change due to site cabinet <br />conditions. Electrician is responsible for site -verifications before <br />ordering and installing. Mount behind valance at FRONT of upper <br />cabinet. See Detail A/6 for location and wiring. Run continuously with <br />fixtures butted end -to -end. <br />3. Sound System Supplier to provide volume controls and speakers as noted <br />on plan. Speaker: "Lowell' #81oT70 or better. Run cable back to <br />component location in Tech Closet. Verify any changes with Designer <br />prior to installation. <br />4. Design of new or relocation of existing by HVAC by Sub -Contractor. <br />Insulate mechanical supply ducts with batting or duct board. Maximum <br />12" flex duct runs. Minimum (4) zones. Use linear or square recessed <br />ceiling diffusers - round diffusers will not be accepted. A sound boot is <br />required in all plenum -rated return -air grilles. Provide alternate pricing <br />of abandoning central furnace and installing individual mini -split ductless <br />units. <br />S. Painter to paint speaker covers and HVAC grilles to match ceiling color if <br />in GWB ceiling. <br />6. Occupancy sensors are to be installed in rooms (fully enclosed by walls) R <br />less than 300 square feet that are designed for meeting, conferencing and <br />storage purposes. These rooms include but are not limited to Private <br />Offices and Staff Lounge. <br />7. Switching layout is to comply with the 2018 Washington State Energy <br />Code. <br />OF EVERETT <br />IIE10VE D 0 R P E R M E" <br />°'coo0 <br />a) N U U <br />-0 ti N C <br />+ E .2) <br />�M�-0 <br />U 0 <br />0 <br />U <br />m <br />A] <br />- REFLECTED CEILING <br />& LIGHTING 'FLM <br />- SOFFIT 19C-1I-IEDULE <br />- LIGHTING SYMBOLS <br />- GENEFAL CEILING <br />& LIGHTING NOTES <br />- LIGHT FIXTURE <br />SCHEDULE <br />- 2018 WSEC LIGHTING <br />COMFLIANCE FORM <br />- CEILING PET/ AIL <br />DATE: 11.3.2021 <br />SCALE: 1/4'' =1'-0" <br />DRAWN: hoc <br />JOB: YOUN <br />SHEET: 4 <br />C� +2COVE�? <br />OF: `� SHEETS <br />