CITY OF EVERETT TESC NOTES <br />I. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (EC) PLAN DOES <br />NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN <br />(E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, <br />RETENTION FACILITIES, UTILITIES), <br />2, THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, <br />MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS <br />THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL <br />CONSTRUCTION IS COMPLETED AND APPROVED AND <br />VEGETATION/LANDSCAPING IS ESTABLISHED. <br />I THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SMALL <br />BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION, DURING THE <br />CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING <br />LIMITS SMALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE <br />APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION, <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN <br />CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH <br />A MANNER AS TO ENSURE THAT 'SEDIMENT AND SEDIMENT LADEN WATER <br />DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE <br />APPLICABLE WATER QUALITY STANDARDS, <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM <br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE <br />CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS <br />NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT <br />AND SEDIMENT —LADEN WATER DO NOT LEAVE THE SITE, <br />THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY <br />THE APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, <br />ESPECIALLY AFTER STORK EVENTS, <br />7, THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND <br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 46 FOURS <br />FOLLOWING A MAJOR STORM EVENT. <br />. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO <br />ACCUMULATE WITHIN A TRAPPED CATCH BASIN, ALL CATCH BASINS AND <br />CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING <br />OPERATION SMALL NOT FLUSH SEDIMENT LADEN WATER INTO THE <br />DOWNSTREAM SYSTEM, <br />9, STABILIZED CONSTRUCTION ENTRANCES SMALL BE INSTALLED AT THE <br />BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE <br />PROJECT, ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL <br />PAVED AREAS ARE KEPT CLEANFOR THE DURATION OF THE PROJECT. <br />10, THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE <br />DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM <br />ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL, <br />12. BARE AND/OR DISTURBED SOILS SMALL REMAIN UNCOVERED AND/OR <br />UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH <br />APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH <br />SEPTEMBER 30. <br />EROSION CONTROL NOTES: <br />1, ALL NECESSARY EQUIPMENT AND MATERIALS SMALL BE <br />AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF <br />EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS <br />IMMINENT. <br />2. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL <br />DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE <br />AUTHORITY HAVING JURISDICTION AFTER EACH RUNOFF <br />PRODUCING RAINFALL, <br />3. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION <br />CONTROL MEASURES AS MAY DE REQUIRED BY THE <br />AUTHORITY HAVING JURISDICTION DUE TO UNCOMPLETED <br />GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES <br />WHICH MAY ARISE. <br />4, ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER <br />PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST <br />BE INSTALLED AND MAINTAINED. <br />5. CONTRACTOR TO IMPLEMENT SLOPE STABILIZATION MEASURES <br />AS NECESSARY FOR EXPOSED SLOPES DURING <br />CONSTRUCTION. MEASURES CAN INCLUDE TEMPORARY .AND <br />PERMANENT SEEDING PER DOE BMP C120, <br />} : 9 <br />EROSION <br />I. CONTRACTOR TO INSTALL SILT FENCE AROUND PERIMETER OF SITE <br />AS NECESSARY TO PREVENT SILT —LADEN RUNOFF FROM LEAVING <br />SITE, AND AS DIRECTED BY CITY INSPECTOR. SEE DETAIL I /C2.2. <br />2. CONTRACTOR TO INSTALL TEMPORARY INLET SEDIMENT PROTECTION <br />AT ALL EXISTING AND PROPOSED CATCH BASINS AS NECESSARY <br />TO PREVENT SILT LADEN WATER FROM ENTERING STORM DRAINAGE <br />SYSTEM. COORDINATE PLACEMENT AS DIRECTED BY CITY <br />INSPECTOR, SEE DETAIL 2/C2,2o <br />3. APPROXIMATE LOCATION OF CONSTRUCTION STAGING AREA. <br />CONTRACTOR TO USE THIS AREA FOR TEMPORARY STOCKPILE <br />STORAGE AND CONCRETE WASHOUT, ADJUST SIZE AND LOCATION <br />OF AREA. AS NEEDED DURING CONSTRUCTION. <br />4, CONTRACTOR TO INSTALL TEMPORARY STABILIZED CONSTRUCTION <br />ENTRANCE ROCK PAD PER CITY STANDARDS. SEE DETAIL 3/C2.2. <br />5. INSTALL TEMPORARY CONSTRUCTION FENCE AND 20' WIDE <br />SITE ACCESS GATE (C' NIGH —CHAIN LINK WITH LOCKING DEVICE) <br />AT TEMPORARY CONSTRUCTION ENTRANCES; PER DETAIL 5/C2.2, <br />FIELD VERIFY AND CONFIRM EXACT LOCATION WITH OWNER. <br />C. FLOW ARROWS INDICATING DIRECTION OF STORMWATER RUNOFF <br />(TYP), <br />7. APPROXIMATE LIMITS OF DISTURBANCE. <br />. APPROXIMATE LOCATION OF TEMPORARY "V" DITCH PER DETAIL 4/C2.2 <br />CONTRACTOR TO CONFIRM POSITIVE DRAINAGE, <br />9� APPROXIMATE LOCATION OF TEMPORARY SEDIMENT TRAP. <br />CONTRACTOR TO INSTALL TEMPORARY SEDIMENT TRAP, <br />CONTRACTOR TO GRADE TO SEDIMENT TRAP. MINIMUM REQUIRED <br />SURFACE AREA FOR SEDIMENT TRAP IS 67 SF, CONTRACTOR TO <br />ENSURE SEDIMENT TRAP LENGTH TO WIDTH RATIO OF 3: 1 MIN. <br />SEE DETAIL 6/C2.2. <br />DUST CONTROL NOTES, <br />1, WATER ALL ACTIVE CONSTRUCTION AREAS AT <br />LEAST TWICE DAILY. <br />2. WATER OR COVER STOCKPILES OF DEBRIS, <br />SOIL, SAND OR OTHER MATERIALS THAT CAN <br />BE BLOWN BY THE WIND. <br />3, COVER ALL TRUCKS MAULING SOIL, SAND, <br />AND OTHER LOOSE MATERIALS OR REQUIRE <br />ALL TRUCKS TO MAINTAIN AT LEAST TWO <br />FEET OF FREEBOARD. <br />4, SWEEP DAILY (PREFERABLY WITH WATER <br />SWEEPERS) ALL PAVED ACCESS ROADS, <br />PARKING AREAS AND STAGING AREAS AT <br />CONSTRUCTION SITES, <br />5, SWEEP STREETS DAILY (PREFERABLY WITH <br />WATER SWEEPERS) IF VISIBLE SOIL MATERIAL <br />IS CARRIED ONTO ADJACENT PUBLIC STREETS, <br />THE CONTRACTOR <br />SHALL. PROTECT AND <br />PRESERVE <br />FROM DAMAGE, <br />INTERFERENCE AND <br />DESTRUCTION ALL <br />PRIVATE AND PUBLIC <br />PROPERTY <br />ON OR IN THE <br />VICINITY OF THE WORK, IF <br />SUCH PROPERTY <br />IS DAMAGED OR DESTROYED OR <br />ITS USE INTERFERED WITH BY THE CONTRACTOR <br />OR HIS OR HER <br />AGENTS, IT SHALL BE <br />RESTORED <br />IMMEDIATELY TO <br />ITS FORMER CONDITION BY THE <br />CONTRACTOR AT <br />HIS OR HER EXPENSE <br />AND SUCH <br />INTERFERENCE <br />TERMINATED, <br />THE LOCATION OF THE EASEMENTS SHOWN ON THIS SHEET SET WERE ADDED BASED ON THE <br />INFORMATION INCLUDED IN THE TITLE REPORT UNDER FIRST AMERICAN TITLE INSURANCE <br />COMPANY NO. NCS-1067959—OR1, DATED MAY 12, 2021. THESE EASEMENTS WERE NOT <br />SURVEYED, THEREFORE BARGHAUSEN CONSULTING ENGINEERS DOES NOT GUARANTEE THE <br />ACCURACY OF EASEMENT LOCATIONS SHOWN ON THESE PLANS. <br />HIM a.6 }, <br />t- 1 r?, I k <br />APPROXIMATE LOCATION OF EXISTING UTILITIES ARE SHOWN ON THESE PLANS. CONTRACTOR TO <br />COORDINATE WITH PURVEYORS AND USE EXTREME CAUTION WHEN EXCAVATING ON —SITE, UNTIL <br />EXISTING GAS AND POWER SERVICE LOCATIONS ARE CONFIRMED. CONTRACTOR TO ORDER <br />INDEPENDENT UTILITY LOCATES (INCLUDING GAS AND POWER) FOR THE FULL SCOPE OF WORK <br />PRIOR TO CONSTRUCTION OR ANY GROUND DISTURBING ACTIVITIES. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH <br />OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE <br />UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS <br />SHALL INCLUDE CALLING UTILITY LOCATE 0 811 AND THEN POTHOLING ALL OF THE EXISTING <br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT <br />CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON <br />THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD <br />OCCUR, THE CONTRACTOR SHALL NOTIFY BARGMAUSEN CONSULTING ENGINEERS, INC, TO RESOLVE <br />ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />IM11 ME <br />fi <br />0 <br />E� <br />0 <br />1 <br />Lu! t= <br />9 <br />to a` f <br />4qq , <br />� <br />6 <br />^�� <br />f <br />y: `N' <br />PROPOSES CITY OF <br />EVERETT WATER EASEMENT <br />r ' I <br />Q l <br />f ROCK PAD (TYP)# 4 <br />j <br />� 1 <br />b` <br />{ <br />s I UTILITY EASEMENT ,lro # f <br />NO. 200811250386 (( t <br />Y�:� Q_ <br />4 t. f <br />a <br />APPROXIMATE FOOTPRINT OF i <br />t UNDERGROUND STORAGE TANK r � . <br />EXCAVATION. CONTRACTOR TO <br />PROVIDE SNORING DESIGN AND f' <br />ASSOCIATED PERMITTING, SEE UST <br />EXCAVATION NOTE THIS SKEET. <br />? } o _ <br />"Aur <br />4 7' r <br />PUBLIC TRANSPORTATION EASEMENT NO. 20080725021- <br />� V <br />302 <br />i <br />STREET EASEMENT r <br />NO. 8806070036 ._ <br />8806100156 <br />AmIm"Im, ON <br />_- - <br />rpp� <br />EWER EASEMENT <br />NO. 870076 <br />70077 <br />870078 <br />870079 <br />t <br />0 <br />t <br />t � <br />1 t <br />f <br />'' l ii <br />)' <br />9205260230 <br />' -ii4 I <br />r.0a It <br />Iv <br />0'i5 <br />4y / <br />RCr-NTOAD <br />FRLINE <br />i <br />i <br />I € N <br />f� <br />f <br />0 <br />f <br />5 <br />u <br />�- <br />10/15/21 <br />Uj <br />6 <br />z <br />Project . 20996 Store #00852 <br />Designed By; ADW <br />Drown By. ADW <br />ti <br />Checked By. CJR <br />Date: 10-15-2021 <br />Scale. 20' <br />Disk File: 2099®EN.dwg <br />a <br />- <br />Model- <br />-c� <br />Address, <br />u <br />4919 EVERGREEN WAY to <br />EVERETT, WA 9203 s <br />TESL PLAN <br />