CITY OF EVERETT TESC NOTES
<br />I. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (EC) PLAN DOES
<br />NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN
<br />(E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS,
<br />RETENTION FACILITIES, UTILITIES),
<br />2, THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION,
<br />MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS
<br />THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL
<br />CONSTRUCTION IS COMPLETED AND APPROVED AND
<br />VEGETATION/LANDSCAPING IS ESTABLISHED.
<br />I THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SMALL
<br />BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION, DURING THE
<br />CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING
<br />LIMITS SMALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE
<br />APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION,
<br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN
<br />CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH
<br />A MANNER AS TO ENSURE THAT 'SEDIMENT AND SEDIMENT LADEN WATER
<br />DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE
<br />APPLICABLE WATER QUALITY STANDARDS,
<br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM
<br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE
<br />CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS
<br />NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT
<br />AND SEDIMENT —LADEN WATER DO NOT LEAVE THE SITE,
<br />THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY
<br />THE APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING,
<br />ESPECIALLY AFTER STORK EVENTS,
<br />7, THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND
<br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 46 FOURS
<br />FOLLOWING A MAJOR STORM EVENT.
<br />. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO
<br />ACCUMULATE WITHIN A TRAPPED CATCH BASIN, ALL CATCH BASINS AND
<br />CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING
<br />OPERATION SMALL NOT FLUSH SEDIMENT LADEN WATER INTO THE
<br />DOWNSTREAM SYSTEM,
<br />9, STABILIZED CONSTRUCTION ENTRANCES SMALL BE INSTALLED AT THE
<br />BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE
<br />PROJECT, ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL
<br />PAVED AREAS ARE KEPT CLEANFOR THE DURATION OF THE PROJECT.
<br />10, THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE
<br />DEBRIS AND SEDIMENT TRACKED OFF THE SITE.
<br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM
<br />ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL,
<br />12. BARE AND/OR DISTURBED SOILS SMALL REMAIN UNCOVERED AND/OR
<br />UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH
<br />APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH
<br />SEPTEMBER 30.
<br />EROSION CONTROL NOTES:
<br />1, ALL NECESSARY EQUIPMENT AND MATERIALS SMALL BE
<br />AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF
<br />EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS
<br />IMMINENT.
<br />2. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL
<br />DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE
<br />AUTHORITY HAVING JURISDICTION AFTER EACH RUNOFF
<br />PRODUCING RAINFALL,
<br />3. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION
<br />CONTROL MEASURES AS MAY DE REQUIRED BY THE
<br />AUTHORITY HAVING JURISDICTION DUE TO UNCOMPLETED
<br />GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES
<br />WHICH MAY ARISE.
<br />4, ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER
<br />PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST
<br />BE INSTALLED AND MAINTAINED.
<br />5. CONTRACTOR TO IMPLEMENT SLOPE STABILIZATION MEASURES
<br />AS NECESSARY FOR EXPOSED SLOPES DURING
<br />CONSTRUCTION. MEASURES CAN INCLUDE TEMPORARY .AND
<br />PERMANENT SEEDING PER DOE BMP C120,
<br />} : 9
<br />EROSION
<br />I. CONTRACTOR TO INSTALL SILT FENCE AROUND PERIMETER OF SITE
<br />AS NECESSARY TO PREVENT SILT —LADEN RUNOFF FROM LEAVING
<br />SITE, AND AS DIRECTED BY CITY INSPECTOR. SEE DETAIL I /C2.2.
<br />2. CONTRACTOR TO INSTALL TEMPORARY INLET SEDIMENT PROTECTION
<br />AT ALL EXISTING AND PROPOSED CATCH BASINS AS NECESSARY
<br />TO PREVENT SILT LADEN WATER FROM ENTERING STORM DRAINAGE
<br />SYSTEM. COORDINATE PLACEMENT AS DIRECTED BY CITY
<br />INSPECTOR, SEE DETAIL 2/C2,2o
<br />3. APPROXIMATE LOCATION OF CONSTRUCTION STAGING AREA.
<br />CONTRACTOR TO USE THIS AREA FOR TEMPORARY STOCKPILE
<br />STORAGE AND CONCRETE WASHOUT, ADJUST SIZE AND LOCATION
<br />OF AREA. AS NEEDED DURING CONSTRUCTION.
<br />4, CONTRACTOR TO INSTALL TEMPORARY STABILIZED CONSTRUCTION
<br />ENTRANCE ROCK PAD PER CITY STANDARDS. SEE DETAIL 3/C2.2.
<br />5. INSTALL TEMPORARY CONSTRUCTION FENCE AND 20' WIDE
<br />SITE ACCESS GATE (C' NIGH —CHAIN LINK WITH LOCKING DEVICE)
<br />AT TEMPORARY CONSTRUCTION ENTRANCES; PER DETAIL 5/C2.2,
<br />FIELD VERIFY AND CONFIRM EXACT LOCATION WITH OWNER.
<br />C. FLOW ARROWS INDICATING DIRECTION OF STORMWATER RUNOFF
<br />(TYP),
<br />7. APPROXIMATE LIMITS OF DISTURBANCE.
<br />. APPROXIMATE LOCATION OF TEMPORARY "V" DITCH PER DETAIL 4/C2.2
<br />CONTRACTOR TO CONFIRM POSITIVE DRAINAGE,
<br />9� APPROXIMATE LOCATION OF TEMPORARY SEDIMENT TRAP.
<br />CONTRACTOR TO INSTALL TEMPORARY SEDIMENT TRAP,
<br />CONTRACTOR TO GRADE TO SEDIMENT TRAP. MINIMUM REQUIRED
<br />SURFACE AREA FOR SEDIMENT TRAP IS 67 SF, CONTRACTOR TO
<br />ENSURE SEDIMENT TRAP LENGTH TO WIDTH RATIO OF 3: 1 MIN.
<br />SEE DETAIL 6/C2.2.
<br />DUST CONTROL NOTES,
<br />1, WATER ALL ACTIVE CONSTRUCTION AREAS AT
<br />LEAST TWICE DAILY.
<br />2. WATER OR COVER STOCKPILES OF DEBRIS,
<br />SOIL, SAND OR OTHER MATERIALS THAT CAN
<br />BE BLOWN BY THE WIND.
<br />3, COVER ALL TRUCKS MAULING SOIL, SAND,
<br />AND OTHER LOOSE MATERIALS OR REQUIRE
<br />ALL TRUCKS TO MAINTAIN AT LEAST TWO
<br />FEET OF FREEBOARD.
<br />4, SWEEP DAILY (PREFERABLY WITH WATER
<br />SWEEPERS) ALL PAVED ACCESS ROADS,
<br />PARKING AREAS AND STAGING AREAS AT
<br />CONSTRUCTION SITES,
<br />5, SWEEP STREETS DAILY (PREFERABLY WITH
<br />WATER SWEEPERS) IF VISIBLE SOIL MATERIAL
<br />IS CARRIED ONTO ADJACENT PUBLIC STREETS,
<br />THE CONTRACTOR
<br />SHALL. PROTECT AND
<br />PRESERVE
<br />FROM DAMAGE,
<br />INTERFERENCE AND
<br />DESTRUCTION ALL
<br />PRIVATE AND PUBLIC
<br />PROPERTY
<br />ON OR IN THE
<br />VICINITY OF THE WORK, IF
<br />SUCH PROPERTY
<br />IS DAMAGED OR DESTROYED OR
<br />ITS USE INTERFERED WITH BY THE CONTRACTOR
<br />OR HIS OR HER
<br />AGENTS, IT SHALL BE
<br />RESTORED
<br />IMMEDIATELY TO
<br />ITS FORMER CONDITION BY THE
<br />CONTRACTOR AT
<br />HIS OR HER EXPENSE
<br />AND SUCH
<br />INTERFERENCE
<br />TERMINATED,
<br />THE LOCATION OF THE EASEMENTS SHOWN ON THIS SHEET SET WERE ADDED BASED ON THE
<br />INFORMATION INCLUDED IN THE TITLE REPORT UNDER FIRST AMERICAN TITLE INSURANCE
<br />COMPANY NO. NCS-1067959—OR1, DATED MAY 12, 2021. THESE EASEMENTS WERE NOT
<br />SURVEYED, THEREFORE BARGHAUSEN CONSULTING ENGINEERS DOES NOT GUARANTEE THE
<br />ACCURACY OF EASEMENT LOCATIONS SHOWN ON THESE PLANS.
<br />HIM a.6 },
<br />t- 1 r?, I k
<br />APPROXIMATE LOCATION OF EXISTING UTILITIES ARE SHOWN ON THESE PLANS. CONTRACTOR TO
<br />COORDINATE WITH PURVEYORS AND USE EXTREME CAUTION WHEN EXCAVATING ON —SITE, UNTIL
<br />EXISTING GAS AND POWER SERVICE LOCATIONS ARE CONFIRMED. CONTRACTOR TO ORDER
<br />INDEPENDENT UTILITY LOCATES (INCLUDING GAS AND POWER) FOR THE FULL SCOPE OF WORK
<br />PRIOR TO CONSTRUCTION OR ANY GROUND DISTURBING ACTIVITIES.
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH
<br />OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE
<br />UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS
<br />SHALL INCLUDE CALLING UTILITY LOCATE 0 811 AND THEN POTHOLING ALL OF THE EXISTING
<br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT
<br />CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON
<br />THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD
<br />OCCUR, THE CONTRACTOR SHALL NOTIFY BARGMAUSEN CONSULTING ENGINEERS, INC, TO RESOLVE
<br />ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.
<br />IM11 ME
<br />fi
<br />0
<br />E�
<br />0
<br />1
<br />Lu! t=
<br />9
<br />to a` f
<br />4qq ,
<br />�
<br />6
<br />^��
<br />f
<br />y: `N'
<br />PROPOSES CITY OF
<br />EVERETT WATER EASEMENT
<br />r ' I
<br />Q l
<br />f ROCK PAD (TYP)# 4
<br />j
<br />� 1
<br />b`
<br />{
<br />s I UTILITY EASEMENT ,lro # f
<br />NO. 200811250386 (( t
<br />Y�:� Q_
<br />4 t. f
<br />a
<br />APPROXIMATE FOOTPRINT OF i
<br />t UNDERGROUND STORAGE TANK r � .
<br />EXCAVATION. CONTRACTOR TO
<br />PROVIDE SNORING DESIGN AND f'
<br />ASSOCIATED PERMITTING, SEE UST
<br />EXCAVATION NOTE THIS SKEET.
<br />? } o _
<br />"Aur
<br />4 7' r
<br />PUBLIC TRANSPORTATION EASEMENT NO. 20080725021-
<br />� V
<br />302
<br />i
<br />STREET EASEMENT r
<br />NO. 8806070036 ._
<br />8806100156
<br />AmIm"Im, ON
<br />_- -
<br />rpp�
<br />EWER EASEMENT
<br />NO. 870076
<br />70077
<br />870078
<br />870079
<br />t
<br />0
<br />t
<br />t �
<br />1 t
<br />f
<br />'' l ii
<br />)'
<br />9205260230
<br />' -ii4 I
<br />r.0a It
<br />Iv
<br />0'i5
<br />4y /
<br />RCr-NTOAD
<br />FRLINE
<br />i
<br />i
<br />I € N
<br />f�
<br />f
<br />0
<br />f
<br />5
<br />u
<br />�-
<br />10/15/21
<br />Uj
<br />6
<br />z
<br />Project . 20996 Store #00852
<br />Designed By; ADW
<br />Drown By. ADW
<br />ti
<br />Checked By. CJR
<br />Date: 10-15-2021
<br />Scale. 20'
<br />Disk File: 2099®EN.dwg
<br />a
<br />-
<br />Model-
<br />-c�
<br />Address,
<br />u
<br />4919 EVERGREEN WAY to
<br />EVERETT, WA 9203 s
<br />TESL PLAN
<br />
|