My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4937 EVERGREEN WAY 2021 QFC FUELING STATION Plans 2023-02-27 (4)
>
Address Records
>
EVERGREEN WAY
>
4937
>
QFC FUELING STATION
>
Plans
>
4937 EVERGREEN WAY 2021 QFC FUELING STATION Plans 2023-02-27 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 8:04:12 AM
Creation date
2/23/2023 1:15:48 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
4937
Tenant Name
QFC FUELING STATION
Permit
PW2111-007
Year
2021
Notes
SITEWORK FOR NEW QFC FUELING STATION
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O SITE DEVELOPMENT NOTES: <br />1. PROPOSED ON -SITE ASPHALT PAVEMENT. SEE DETAIL 1/C7.0. <br />2. PROPOSED CONCRETE FUEL DISPENSER CANOPY SLAB. SEE <br />FUEL PLANS FOR DETAILS. SEE DETAIL 8/C7.0 FOR <br />CONNECTION TO ON -SITE ASPHALT PAVEMENT. <br />3. PROPOSED REINFORCED CONCRETE SLAB ABOVE UNDERGROUND <br />GASOLINE STORAGE TANKS (USTs). SEE TANK PLANS FOR <br />DETAILS, <br />4. PROPOSED FUELING CANOPY. CANOPY TO BE HYDRAULICALLY <br />ISOLATED AND DRAIN TO SANITARY SEWER FOLLOWING <br />TREATMENT. SEE ARCHITECTURAL PLANS FOR DETAILS.. <br />5. PROPOSED SELF-SERVICE AIR/WATER UNIT ENCLOSURE. SEE <br />ARCHITECTURAL PLANS FOR DETAILS. <br />6. <br />PROPOSED <br />ON -SITE <br />CONCRETE PAVEMENT. SEE DETAIL 2/C7.0. <br />7. <br />PROPOSED <br />ON -SITE <br />BARRIER CURB. SEE DETAIL 4/C7.0. <br />8. <br />PROPOSED <br />PARKING <br />STALL MARKINGS SHALL BE 4" WIDE WHITE <br />PAINTED STRIPES TO <br />DIMENSIONS. SEE DETAIL 5/C7.0 <br />9. <br />PROPOSED <br />PREFABRICATED <br />KIOSK ENCLOSURE WITH RESTROOM. <br />SEE ARCHITECTURAL <br />PLANS FOR DETAILS. <br />10. PROPOSED BOLLARDS (10 TOTAL, TYP). SEE ARCHITECTURAL <br />PLANS FOR DETAILS. <br />11. PROPOSED LANDSCAPING. SEE LANDSCAPING PLANS. <br />12. PROPOSED LOCATION OF FIRE HYDRANT. <br />13. PAVEMENT MARKINGS - 4" WIDE WHITE PAINTED STRIPES @ 2' <br />O.C/45` ANGLE. SEE DETAIL 6/C7.0. <br />14. PROPOSED NEW FUEL DISPENSER ISLAND. SEE ARCHITECTURAL <br />PLANS FOR DETAILS, <br />15. PROPOSED CONCRETE SWALE. SEE DETAIL 7/C7.0. <br />16. PROPOSED U-SHAPED BOLLARD (9 TOTAL, TYP). SEE <br />ARCHITECTURAL PLANS FOR DETAILS, <br />17. STORAGE TANK VENT STACK AND VENT RISER PAD PER TANK <br />DRAWINGS. <br />18. (1) 10,000/8,000 GALLON DUAL COMPARTMENT AND (1) <br />20,000 GALLON UNDERGROUND GASOLINE STORAGE TANKS PER <br />TANK PLANS. <br />19. PROPOSED FIRE HYDRANT CONCRETE SLAB PER CITY OF <br />EVERETT STANDARD DETAIL 508. SEE DETAIL 9/C7.0 <br />20. PROPOSED CURB CUT. SEE DETAIL 6/C7.1. <br />21. PROPOSED ACCESSIBLE PARKING STALL AND AISLE. SEE DETAIL <br />1 /C7.1. <br />22. ADA ACCESSIBLE PATH. SEE ACCESSIBLE PATH NOTE THIS <br />SHEET. <br />23, PROPOSED LOCATION OF ACCESSIBLE PARKING AND AISLE <br />SIGNS. SEE DETAIL 3/C7.1. <br />24. PROPOSED WHEEL STOP. SEE DETAIL 5/C7.1. <br />25. PROPOSED ACCESSIBLE PARKING PAVEMENT SYMBOL. SEE <br />DETAIL 2/C7.1. <br />26. EXISTING LANDSCAPING. REPLACE WITH IN -KIND IF DAMAGED. <br />27. PROTECT EXISTING ASPHALT TO REMAIN. <br />WALKWAYS ALONG ACCESSIBLE ROUTES OF TRAVEL SHALL BE <br />CONTINUOUSLY ACCESSIBLE, BE A MINIMUM OF 44" IN WIDTH, HAVE <br />A MAXIMUM 2.0% CROSS SLOPE, AND SHALL HAVE RAMPS <br />COMPLYING WITH ACCESSIBILITY STANDARDS (SECTION 405) WHERE <br />NECESSARY TO CHANGE ELEVATION AT A LONGITUDINAL SLOPE <br />EXCEEDING 5% (1:20). <br />THE CONTRACTOR SHALL PROTECT AND <br />PRESERVE <br />FROM DAMAGE, <br />INTERFERENCE AND <br />DESTRUCTION ALL PRIVATE AND PUBLIC <br />PROPERTY <br />ON OR IN THE <br />VICINITY OF THE WORK. IF <br />SUCH PROPERTY IS DAMAGED OR DESTROYED OR <br />ITS USE INTERFERED WITH BY THE CONTRACTOR <br />OR HIS OR HER AGENTS, IT SHALL BE <br />RESTORED <br />IMMEDIATELY TO <br />ITS FORMER CONDITION BY THE <br />CONTRACTOR AT HIS OR HER EXPENSE <br />AND SUCH <br />INTERFERENCE <br />TERMINATED. <br />AUAWKWiLiffil! on VMS <br />THE LOCATION OF THE EASEMENTS SHOWN ON THIS SHEET SET WERE ADDED BASED ON THE <br />INFORMATION INCLUDED IN THE TITLE REPORT UNDER FIRST AMERICAN TITLE INSURANCE <br />COMPANY NO. NCS-1067959-OR1, DATED MAY 12, 2021, THESE EASEMENTS WERE NOT <br />SURVEYED, THEREFORE BARGHAUSEN CONSULTING ENGINEERS DOES NOT GUARANTEE THE <br />ACCURACY OF EASEMENT LOCATIONS SHOWN ON THESE PLANS. <br />UTILITY PROTECTION NOTE: <br />APPROXIMATE LOCATION OF EXISTING UTILITIES ARE SHOWN ON THESE PLANS. CONTRACTOR TO <br />COORDINATE WITH PURVEYORS AND USE EXTREME CAUTION WHEN EXCAVATING ON -SITE, UNTIL <br />EXISTING GAS AND POWER SERVICE LOCATIONS ARE CONFIRMED. CONTRACTOR TO ORDER <br />INDEPENDENT UTILITY LOCATES (INCLUDING GAS AND POWER) FOR THE FULL SCOPE OF WORK <br />PRIOR TO CONSTRUCTION OR ANY GROUND DISTURBING ACTIVITIES. <br />UTILITY CONFLICT NOTE: <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH <br />OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE <br />UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS <br />SHALL INCLUDE CALLING UTILITY LOCATE 0 811 AND THEN POTHOLING ALL OF THE EXISTING <br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT <br />CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON <br />THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD <br />OCCUR, THE CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE <br />ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />Sec. 31, Twp. 29N, Rge. 5E, W.M. <br />A1121;jim <br />'A: _... 26 <br />~` <br />STREET EASEMENT <br />NO. 8806070036 <br />8806100156 <br />9205260230 <br />84 25 } r ; <br />a <br />4 6''ly 413.0 V, i <br />ri..r <br />p 25" 6 - --_.__ _-meµ;°/ .4 a . <br />sr <br />ROAD � . ,,.,... <br />CENTERLINE <br />UST EXCAVATION NOTE: <br />TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS. TANK <br />EXCAVATIONS WILL REQUIRE SHORING AND SHALL BE ENGINEERED <br />AND PERMITTED SEPARATELY AND SHALL BE THE RESPONSIBILITY OF <br />THE INSTALLING CONTRACTOR. <br />N <br />0 10' 20' 40' <br />SCALE: 1 "=20' <br />L1 <br />Know What's below. <br />Call before you dig. <br />Dial 811 <br />Barghausen <br />Consulting Engineers, Inc. <br />18215 72nd Avenue South <br />Kent, WA 98032 <br />425.251.6222 <br />barghausen.com <br />BCE #20996 <br />W <br />W <br />N <br />to <br />00 <br />W <br />Z <br />W <br />U <br />_1 <br />LL <br />U <br />11. <br />Ii <br />• <br />a <br />W N <br />a 1 <br />o N <br />I <br />0 <br />3 <br />a <br />J <br />d m <br />w w <br />Q � <br />0 0° <br />N c <br />0 <br />m <br />Nov <br />"C (U cn ao <br />w ° 4 003m <br />.. <br />LL <br />4 <br />!p?A <br />r ,5 <br />�✓ Q 6mu <br />O � � <br />U C 00§ <br />61 C Ct of I <br />N w� <br />o a� <br />�Qo0� <br />1- 001 <br />28527 <br />FBI1 1 7 �4 <br />10NA L <br />10/15/21 <br />ti <br />Zr <br />r <br />�- <br />g <br />S <br />W <br />Project #: 20996 Store #00852 <br />Designed By. ADW <br />Drown By. ADW <br />`r <br />Checked By. CJRCD <br />Dote: 10-15-2021 <br />N <br />Scale: 1 " = 20' <br />cti <br />Disk File: 20996-Al <br />Model: �? <br />3 <br />Address: <br />d <br />4919 EVERGREEN WAY <br />�o <br />EVERETT, WA 98203 <br />0 <br />N <br />SITE PLAN <br />C FC <br />FiBJW FAGN_ITY <br />?rowing No.: <br />o <br />ApIll <br />CJU0 <br />of <br />Q <br />0 <br />ca <br />c- <br />
The URL can be used to link to this page
Your browser does not support the video tag.