Laserfiche WebLink
IBM <br />THE SITE IS UNDERLAIN BY UP TO FIVE FEET UE VERY LOOSE FILL COMPRISED OF <br />SILTY SAND WITH TRACE GRAVEL OVER NATIVE DEPOSITS OF MEDIUM DENSE TO VERY <br />DENSE SILTY SAND WITH TRACE GRAVEL, AND SAND WITH VARYING AMOUNT OF SILT <br />AND GRAVEL UP TO 20 FEET. <br />SITE PREPARATION: <br />STRIPPING EFFORTS SHOULD INCLUDED REMOVAL OF PAVEMENTS, VEGETATION, <br />ORGANIC MATERIALS AND DELETERIOUS DEBRIS FROM AREAS SLATED FOR BUILDING, <br />PAVEMENT AND UTILITY CONSTRUCTION. <br />THE RILEY GROUP, INC. ANTICIPATED THAT SOME AREAS OF LOOSE SOIL MAY DE <br />PRESENT ON THE SITE AFTER STRIPPING. THEREFORE, ITS IS RECOMMEND THAT THE <br />BUILDING, PAVEMENT, AND OTHER AREAS TO RECEIVE STRUCTURAL AREAS ARE <br />PROOFROLLED AND COMPACTED, SOILS SHOULD DE COMPACTED TO ACHIEVE A <br />MINIMUM COMPACTION LEVEL OF 95 PERCENT OF THE MODIFIED PROCTOR MAXIMUM <br />DRY DENSITY AS DETERMINED BY ASTM D15 7 TEST METHOD. PROOFROLLING AND <br />ADEQUATE SUBGRADE COMPACTION CAN ONLY BE ACHIEVED WHEN THE SOILS ARE <br />WITHIN APPROXIMATELY ± 2 PERCENT MOISTURE CONTENT OF THE OPTIMUM <br />MOISTURE CONTENT. <br />SUBGRADE SOILS THAT BECOME DISTURBED DUE TO ELEVATED MOISTURE CONDITIONS <br />SHOULD BE OVEREXCAVATED TO REVEAL FIRM, NON —YIELDING, NON —ORGANIC SOILS <br />AND BACKFILLED WITH COMPACTED STRUCTURAL FILL. THE RILEY GROUP, INC. <br />RECOMMENDS THAT THE EARTHWORK PORTION OF THIS PROJECT BE COMPLETED <br />DURING EXTENDED PERIODS OF WARM AND DRY WEATHER IF POSSIBLE, <br />EXCAVATIONS AND FILL <br />FOR EXCAVATION MORE THAN 4 FEET BUT LESS THAN 20 FEET IN DEPTH THE <br />TEMPORARY SIDE SLOPES SHOULD BE LAID BACK WITH A MINIMUM SLOPE <br />INCLINATION OF 1.5,1 (HORIZONTAL:VERTICAL). IF THERE IS INSUFFICIENT ROOM TO <br />COMPLETE THE EXCAVATIONS IN THIS MANNER, OR EXCAVATIONS GREATER THAN 20 <br />FEET IN DEPTH ARE PLANNED, TEMPORARY SNORING SHOULD BE USED. FOR OPEN <br />CUTS AT THE SITE THE RILEY GROUP, INC, RECOMMENDS THE FOLLOWING: <br />NO TRAFFIC, CONSTRUCTION EQUIPMENT, STOCKPILES OR BUILDING SUPPLIES <br />ARE ALLOWED AT THE TOP OF CUT SLOPES WITHIN A DISTANCE OF AT LEAST 5 <br />FEET FROM THE TOP OF THE CUT. <br />— EXPOSED SOIL ALONG THE SLOPE IS PROTECTED FROM SURFACE EROSION <br />USING WATERPROOF TARPS AND/OR PLASTIC SHEETING. <br />CONSTRUCTION ACTIVITIES ARE SCHEDULED SO THAT THE LENGTH OF TIME THE <br />TEMPORARY CUT IS LEFT OPEN 15 MINIMIZED <br />— SURFACE WATER IS DIVERTED AWAY FROM THE EXCAVATION <br />THE GENERAL CONDITION OF SLOPES SHOULD BE OBSERVED PERIODICALLY BY <br />A GEOTECHNICAL ENGINEER TO CONFIRM ADEQUATE STABILITY AND EROSION <br />CONTROL MEASURES. <br />PAVEMENTTHE RILEY GROUP, INC, RECOMMENDS FILL BELOW THE FOUNDATION AND FLOOR <br />SLAB, AND BELOW <br />ACCORDANCE <br />e THE RECOMMENDATION <br />I1 STRUCTURAL FILL, <br />COMPACTION <br />SANDY NATIVE SOILS MAY BE SUITABLE FOR STRUCTURAL FILL IF THE MOISTURE CAN <br />BE PROPERLY CONTROLLED AT THE TIME OF <br />OCCURS IN DRY WEATHER. IF NOT, IT MAY BE R <br />GRANULAR SOILS THAT E <br />COMPACTEDREPORT. STRUCTURAL FILL MATERIALS SHOULD BE PLACED IN UNIFORM LOOSE <br />LAYERS NOT EXCEEDING 12 INCHES AND P D IN THE <br />GEOTECHNICAL REPORT. <br />1, ALL SPOT ELEVATIONS SHOWN ARE TO FINISH SURFACE (TOP OF ASPHALT OR TOP OF CONCRETE <br />PAVEMENT, NOT TOP OF CURD/SIDEWALK) UNLESS OTHERWISE NOTED. (TA = TOP OF ASPHALT, TC <br />TOP OF CONCRETE SIDEWALK/CURB, ME o MATCH EXISTING ELEVATIONS, FC ® FLUSH CURD, FL <br />FLOW LINE, GB = GRADE BREAK) <br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL PROPOSED GRADES IN RELATIONSHIP TO <br />SURVEYED BASIS OF ELEVATION. <br />3. FILL MATERIAL AND COMPACTION SHALL CONFORM TO THE GEOTECHNICAL REPORT AND CITY OF EVERETT <br />REQUIREMENTS. <br />4. CONTRACTOR TO PROTECT AND MAINTAIN EROSION CONTROL FACILITIES DURING GRADING OPERATIONS. <br />5. CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE GEOTECHNICAL REPORT AND CITY <br />OF EVERETT REQUIREMENTS, <br />G. CONTRACTOR TO RAISE AND ADJUST PROPOSED SANITARY SEWER CLEANOUTS LIDS TO FINAL GRADE AS <br />NECESSARY. CLEANOUTS WITHIN ADA ACCESSIBLE PATHS SHALL BE ADJUSTED TO FINAL ELEVATIONS IN <br />COMPLIANCE WITH CURRENT ADA REQUIREMENTS. <br />7. CONTRACTOR TO RAISE AND ADJUST ALL EXISTING AND PROPOSED CATCH BASIN RIDS TO FINAL GRADE <br />AS NECESSARY. CATCH BASINS WITHIN ADA ACCESSIBLE PATHS SHALL BE ADJUSTED TO FINAL <br />ELEVATIONS IN COMPLIANCE WITH CURRENT ADA STANDARDS. <br />B. CONTRACTOR TO ORDER LOCATES AND FIELD VERIFY ALL UTILITIES PRIOR TO CONSTRUCTION TO ENSURE <br />THAT UTILITY CONFLICTS DO NOT EXIST. CONTRACTOR TO REVIEW UTILITY ASBUILTS IN ORDER TO VERIFY <br />EXISTING UTILITY LOCATIONS. CONTRACTOR SHALL POTHOLE ALL POTENTIAL UTILITY CONFLICTS PRIOR TO <br />CONSTRUCTION. NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. OF ANY CONFLICTS. <br />CONTRACTOR SHALL PROTECT AND <br />PRESERVE <br />FROM DAMAGE, <br />INTERFERENCE AND <br />PRIVATETHE <br />DESTRUCTION ALL AND PUBLICi <br />ON OR IN THE <br />VICINITY OF THE fi <br />SUCH PROPERTY 15 DAMAGED OR DESTROYED OR <br />ITS USE INTERFERED WITH BY THE CONTRACTOR <br />OR HIS OR E AGENTS, <br />RESTORED <br />TO <br />ITS FORMER CONDITIONB, THE <br />CONTRACTOR AT HIS OR HER EXPENSE <br />AND SUCH <br />INTERFERENCE <br />TERMINATED. <br />MEMO I ' ' <br />THE LOCATION OF THE EASEMENTS SHOWN ON THIS SHEET SET WERE ADDED BASED ON THE <br />INFORMATION INCLUDED IN THE TITLE REPORT UNDER FIRST AMERICAN TITLE INSURANCE <br />COMPANY NO. NCS— 1 OG7959—OR1, DATED MAY 12, 2021. THESE EASEMENTS WERE NOT <br />SURVEYED, THEREFORE BARGHAUSEN CONSULTING ENGINEERS DOES NOT GUARANTEE THE <br />,ACCURACY OF EASEMENT LOCATIONS SHOWN ON THESE PLANS. <br />s <br />!nn��l� �pl� ono q) i o00000o i 000i <br />PROPOSED CONTOUR <br />EXISTING CONTOUR <br />PROPOSED RIDGE LINE <br />SWALE FLOWLINE <br />PROPOSED GRADING SLOPE <br />SPOT ELEVATION <br />FLUSH ELEVATION <br />LATCH EXISTING ELEVATION <br />TOP OF PAVEMENT/TOP OF CUR-T; <br />FLOW/GUTTER L_ OF CUI <br />- - - - - - 30 - - - - - - <br />-_- 3 <br />1.00 <br />30. 1 <br />v FC <br />30.01 ± ME <br />30.01 TA <br />30.51 TC <br />.�30.01 FF <br />v to <br />302.'97 cc <br />0 if 303.05' � <br />�n <br />95 <br />0105 F 'ia G8 <br />303.04 302. <br />�� ! 302. <br />! _0. 6Z <br />P-; F <br />hc <br />�O <br />_ <br />j > 1_5i0 <br />l <br />303.02 !! <br />02.4 <br />SCALE: V = 5s <br />0 <br />"Waft, <br />302.95 <br />30®. <br />0 <br />of <br />�dddiii p i( v _ <br />�__q <br />ji y <br />i,! . <br />Consulting I Engineers, Inc. <br />m <br />Cq <br />to <br />VNA L' <br />11 <br />4_3 � <br />v) L'i <br />Cq <br />C) <br />00 0&0 <br />10/15/21 <br />® <br />< <br />z <br />Q <br />w <br />Project - 20906 Store #00852 <br />Designed By, ADW <br />= <br />Drown By. ADW <br />Checked By CJR <br />Dote: 10-15-2021 <br /><v <br />-- <br />Scale. 1 , c 5' <br />Ln <br />Disk File: 20996-GD.dwq <br />CD <br />Model: <br />cs <br />Address: <br />4919 EVERGREEN WAY � <br />EVERETT, WA 98203 0' <br />GRAD. DETAIL AND NOTES a) <br />