CITY OF EVERETT' TESC NOTES <br />1. APPROVAL OF THIS ERCSION/SEDIMENTATION CONTROL (ESC) PLAN DOES <br />NOT CONSTITUTE AN AP)ROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN <br />(E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, <br />RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION 01' THESE ESC PLANS AND THE CONSTRUCTION, <br />MAINTENANCE, REPLACEhIENT, AND UPGRADING OF THESE ESC FACILITIES IS <br />THE RESPONSIBILITY OFTHE APPLICANT/CONTRACTOR UNTIL ALL <br />CONSTRUCTION IS COMFLETED AND APPROVED AND <br />VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF TFiE CLEARING LIMITS SHOWN ON THIS PLAN SHALL <br />BE CLEARLY FLAGGED III THE FIELD PRIOR TO CONSTRUCTION. DURING THE <br />CONSTRUCTION PERIOD, 'NO DISTURBANCE BEYOND THE FLAGGED CLEARING <br />LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE <br />APPLICANT/CONTRACTOR, FOR THE DURATION OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN <br />CONJUNCTION WITH ALL .CLEARING AND GRADING ACTIVITIES, AND IN SUCH <br />A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER <br />DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE <br />APPLICABLE WATER QUA-ITYSTANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM <br />REQUIREMENTS FOR AN11CIPATED SITE CONDITIONS. DURING THE <br />CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS <br />NEEDED FOR UNEXPECT7D STORM EVENTS AND TO ENSURE THAT SEDIMENT <br />AND SEDIMENT -LADEN HATER DO NOT LEAVE THE SITE. <br />6. THE ESC FACILITIES SH),LL BE INSPECTED ROUTINELY AND MAINTAINED BY <br />THE APPLICANT/CONTRA-;,TOR TO ENSURE THEIR CONTINUED FUNCTIONING, <br />ESPECIALLY AFTER STORM EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND <br />MAINTAINED A MINIMUM X ONCE A MONTH OR WITHIN THE 48 HOURS <br />FOLLOWING A MAJOR STORM EVENT. <br />8. AT NO TIME SHALL MOFE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO <br />ACCUMULATE WITHIN A '*RAPPED CATCH BASIN. ALL CATCH BASINS AND <br />CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING <br />OPERATION SHALL NOT IUSH SEDIMENT LADEN WATER INTO THE <br />DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE <br />BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE <br />PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL <br />PAVED AREAS ARE KEPI; CLEAN FOR THE DURATION OF THE PROJECT. <br />10. THE CONTRACTOR SHALI-, PROVIDE PERIODIC STREET CLEANING TO REMOVE <br />DEBRIS AND SEDIMENT '`RACKED OFF THE SITE. <br />11. APPROPRIATE MEASURE'' SHALL BE TAKEN TO STOP SEDIMENT FROM <br />ENTERING SURFACE WATrR BODIES IF THE PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR <br />UNSTABILIZED FOR NO 14ORE THAN 2 DAYS FROM OCTOBER 1 THROUGH <br />APRIL 30, AND FOR NC MORE THAN 7 DAYS FROM MAY 1 THROUGH <br />SEPTEMBER 30. <br />CD EROSION CONTROL CALLOUTS: <br />1 . CONTRACTOR TO INSTALL SILT FENCE AROUND PERIMETER OF SITE <br />AS NECESSARY TO PREVENT SILT -LADEN RUNOFF FROM LEAVING <br />SITE, AND AS DIRECTED BY CITY INSPECTOR. SEE DETAIL 1/C2.2. <br />2. CONTRACTOR TO INSTALL TEMPORARY INLET SEDIMENT PROTECTION <br />AT ALL EXISTING AND PROPOSED CATCH BASINS AS NECESSARY <br />TO PREVENT SILT -LADEN WATER FROM ENTERING STORM DRAINAGE <br />SYSTEM. COORDINATE PLACEMENT AS DIRECTED BY CITY <br />INSPECTOR. SEE DETAIL 2/C2.2. <br />3. APPROXIMATE LOCATION OF CONSTRUCTION STAGING AREA. <br />CONTRACTOR TO USE THIS AREA FOR TEMPORARY STOCKPILE <br />STORAGE AND CONCRETE WASHOUT. ADJUST SIZE AND LOCATION <br />OF AREA AS NEEDED DURING CONSTRUCTION. <br />4. CONTRACTOR TO INSTALL TEMPORARY STABILIZED CONSTRUCTION <br />ENTRANCE ROCK PAD PER CITY STANDARDS. SEE DETAIL 3/C2.2. <br />5. INSTALL TEMPORARY CONSTRUCTION FENCE AND 20' WIDE <br />SITE ACCESS GATE (6' HIGH -CHAIN LINK WITH LOCKING DEVICE) <br />AT TEMPORARY CONSTRUCTION ENTRANCES; PER DETAIL 5/C2.2. <br />FIELD VERIFY AND CONFIRM EXACT LOCATION WITH OWNER. <br />6. FLOW ARROWS INDICATING DIRECTION OF STORMWATER RUNOFF <br />(TYP). <br />7. APPROXIMATE LIMITS OF DISTURBANCE. <br />8. APPROXIMATE LOCATION OF TEMPORARY "V" DITCH PER DETAIL 4/C2.2 <br />CONTRACTOR TO CONFIRM POSITIVE DRAINAGE. <br />9. APPROXIMATE LOCATION OF TEMPORARY SEDIMENT TRAP. <br />CONTRACTOR TO INSTALL TEMPORARY SEDIMENT TRAP. <br />CONTRACTOR TO GRADE TO SEDIMENT TRAP. SEE DETAIL 6/C2.2. <br />D] =Fft 4v 9[wm <br />MINIMUM REQUIRED SURFACE AREA FOR SEDIMENT TRAP IS ; <br />SA =2xQ/0.00096 = 736 SF <br />02 =0.3533 CFS <br />SA =2083 SF x 02 <br />SA = 736 SF <br />DESIGN SURFACE AREA = 837 SF <br />PROVIDE 6' WIDE OVERFLOW SPILLWAY. <br />EROSION CONTFOL NOTES: <br />DUST CONTROL NOTES: <br />1. ALL NECESSARY EQUIPM1,NT AND MATERIALS SHALL BE <br />1. <br />WATER ALL ACTIVE CONSTRUCTION AREAS AT <br />AVAILABLE ON SITE TO IACILITATE RAPID INSTALLATION OF <br />LEAST TWICE DAILY. <br />EROSION AND SEDIMENT ;CONTROL BMPS WHEN RAIN IS <br />IMMINENT. <br />2. <br />WATER OR COVER STOCKPILES OF DEBRIS, <br />SOIL, SAND OR OTHER MATERIALS THAT CAN <br />2. THE CONTRACTOR SHALL: RESTORE ALL EROSION CONTROL <br />BE BLOWN BY THE WIND. <br />DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE <br />AUTHORITY HAVING JURI�DICTION AFTER EACH RUN-OFF <br />3. <br />COVER ALL TRUCKS HAULING SOIL, SAND, <br />PRODUCING RAINFALL. <br />AND OTHER LOOSE MATERIALS OR REQUIRE <br />ALL TRUCKS TO MAINTAIN AT LEAST TWO <br />3. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION <br />FEET OF FREEBOARD. <br />CONTROL MEASURES AS MAY BE REQUIRED BY THE <br />AUTHORITY HAVING JURI�IDICTION DUE TO UNCOMPLETED <br />4. <br />SWEEP DAILY (PREFERABLY WITH WATER <br />GRADING OPERATIONS Olt UNFORESEEN CIRCUMSTANCES <br />SWEEPERS) ALL PAVED ACCESS ROADS, <br />WHICH MAY ARISE. <br />PARKING AREAS AND STAGING AREAS AT <br />CONSTRUCTION SITES. <br />4. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER <br />PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST <br />5. <br />SWEEP STREETS DAILY (PREFERABLY WITH <br />BE INSTALLED AND MAINrAINED. <br />WATER SWEEPERS) IF VISIBLE SOIL MATERIAL <br />IS CARRIED ONTO ADJACENT PUBLIC STREETS. <br />5. CONTRACTOR TO IMPLEM.NT SLOPE STABILIZATION MEASURES <br />AS NECESSARY FOR EXFOSED SLOPES DURING <br />CONSTRUCTION. MEASURES CAN INCLUDE TEMPORARY AND <br />PERMANENT SEEDING PER DOE BMP C120. <br />VA <br />Sec. 31, Twp. 29N, Rge. 5E, W.M. <br />TESC PLAN <br />V9 <br />PROPOSED CITY OF <br />EVERETT WATER EASEMENT <br />In <br />LAJ <br />L NO, 870076 <br />870077 <br />co <br />870078 <br />2 870079 <br />X 09 <br />A <br />dp <br />dp <br />pF <br />2 <br />Li <br />z TOP 9 I .4 <br />Uj <br />j <br />X-ft 5 <br />3A <br />Of <br />3.1 <br />YJ 0 <br />Uj cfwj l <br />­ <br />01 <br />9 <br />BTM. <br />Imo` �d <br />4 zZ <br />ROCK PAD (TYP) <br />' o <br />Z-9 <br />01 <br />ql> 0 <br />3 <br />W) <br />UTILITY EASEMENT <br />NO. 200811250386 <br />j <br />t <br />APPROXIMATE FOOTPRINT OF <br />UNDERGROUND STORAGE TANK <br />EXCAVATION. CONTRACTOR TO <br />PROVIDE SHORING DESIGN AND <br />ASSOCIATED PERMITTING. SEE UST <br />EXCAVATION NOTE THIS SHEET. <br />5 <br />7 <br />5 <br />PUBLIC TRANSPORTATION EASEMENT _Ag 4R) <br />NO. 200807250218 <br />302 <br />A <br />PROPERTY PROTECTION NOTE: <br />STREET EASEMENT <br />THE CONTRACTOR SHALL PROTE,T AND PRESERVE FROM DAMAGE, INTERFERENCE AND NO. 8806070036 P(U(;) _4�, <br />DESTRUCTION ALL PRIVATE AND PUBLIC PROPERTY ON OR IN THE VICINITY OF THE WORK. IF 8806100156 <br />SUCH PROPERTY IS DAMAGED CR DESTROYED OR ITS USE INTERFERED WITH BY THE CONTRACTOR 9205260230 <br />OR HIS OR HER AGENTS, IT SHALL BE RESTORED IMMEDIATELY TO ITS FORMER CONDITION BY THE 4 0 <br />CONTRACTOR AT HIS OR HER E:(PENSE AND SUCH INTERFERENCE TERMINATED. 14 <br />N80'2546,w <br />EASEMENT NOTE '480*25 777-77 <br />463-47-1-- <br />THE LOCATION OF THE EASEMEINTS SHOWN ON THIS SHEET SET WERE ADDED BASED ON THE SON <br />INFORMATION INCLUDED IN THE TITLE REPORT UNDER FIRST AMERICAN TITLE INSURANCE <br />COMPANY NO. NCS-1067959-0R1, DATED MAY 12, 2021. THESE EASEMENTS WERE NOT <br />SURVEYED, THEREFORE BARGHAUSEN CONSULTING ENGINEERS DOES NOT GUARANTEE THE ROAD CENTER <br />ACCURACY OF EASEMENT LOCATIONSLIN, ONS SHOWN ON THESE PLANS. 1, -- Ss SS <br />con <br />UTILITY PROTECTION NOTE: UST EXCAVATION NOTE: <br />APPPnY1kJATl7 LOCATION 017 I7Y!qT1K1r. HT111T1l7q ARE ql4r)WN ON TW17ql7 PLANS. CONTRACTOR TO <br />COORDINATE WITH PURVEYORS AND USE EXTREME CAUTION WHEN EXCAVATING ON -SITE, UNTIL TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS. TANK <br />EXISTING GAS AND POWER SERVICE LOCATIONS ARE CONFIRMED. CONTRACTOR TO ORDER EXCAVATIONS WILL REQUIRE SHORING AND SHALL BE ENGINEERED <br />INDEPENDENT UTILITY LOCATES (INCLUDING GAS AND POWER) FOR THE FULL SCOPE OF WORK AND PERMITTED SEPARATELY AND SHALL BE THE RESPONSIBILITY OF <br />PRIOR TO CONSTRUCTION OR ANY GROUND DISTURBING ACTIVITIES. THE INSTALLING CONTRACTOR. <br />UTILITY CONFLICT NOTE: <br />THE CONTRACTOR SHALL BE RE`�PONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH A UTILITY POTHOLING NOTE: <br />OF ALL EXISTING UTILITIES WHET­IER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE <br />UTILITIES AND SURVEYING THE H)RIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS THE CIRCLED LOCATIONS ARE REQUIRED TO BE POTHOLED TO <br />SHALL INCLUDE CALLING UTILITY LOCATE 0 811 AND THEN POTHOLING ALL OF THE EXISTING VERIFY VERTICAL AND HORIZONTAL LOCATION OF EXISTING UTILITY <br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT AND/OR POTENTIAL CONFLICTS WITH EXISTING UTILITIES. POTHOLING <br />CONFLICTS EXIST. LOCATIONS CF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON SHALL BE PERFORMED PRIOR TO INSTALLING ANY PROPOSED <br />THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD UTILITIES. CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING <br />OCCUR, THE CONTRACTOR SHALL, NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE <br />ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. ENGINEERS, INC. OF ANY CONFLICTS. <br />01URTAV001TWOU"s- 111111111 AIL <br />CONTRACTOR TO OVEREXCAVATE TO REVEAL FIRM NON -YIELDING, NON -ORGANIC <br />SOIL. INSTALLATION OF STRUCTURAL FILL MAY BE REQUIRED TO PROVIDE A <br />SUITABLE SUBGRADE FOR BUILDING FOUNDATIONS. CONTRACTOR TO REFER TO <br />THE GEOTECHNICAL ENGINEERING REPORT PREPARED BY THE RILEY GROUP, INC. <br />DATED JANUARY 7, 2020 FOR FOUNDATION SUBGRADE PREPARATION <br />REQUIREMENTS. <br />TEMPORARY EXCAVATION SLOPE NOTE: <br />CONTRACTOR TO ENSURE TEMPORARY SLOPES HAVE A MAXIMUM SLOPE <br />INCLINATION OF 1.5H:1V. CONTRACTOR TO REFER TO THE GEOTECHNICAL <br />ENGINEERING REPORT PREPARED BY THE RILEY GROUP, INC. DATED JANUARY 7, <br />2020 FOR EXCAVATION AND SLOPE REQUIREMENTS. <br />0 101 20' 40' <br />SCALE: 1 "=20' <br />CITY OF EVES ETI. <br />REVIENED FOR PERMIT <br />Know what's below. <br />Call before you dig. <br />Dial 811 <br />Barghausen <br />Consulting Engineers, Inc. <br />18215 72nd Avenue South <br />Kent, WA 98032 <br />425.251.6222 <br />barghausen.com <br />BCE #20996 <br />a: <br />W <br />W <br />04 <br />U') <br />00 <br />4t: <br />I <br />Wcr <br />z <br />W <br />W <br />ILL <br />0 <br />ILL <br />0 <br />in <br />C <br />.0 <br />m <br />Z. <br />4, <br />"a <br />co fe 00 <br />0 V) 000 <br />0 00.3: <br />0 <br />M <br />Uj <br />0 E_;A&S <br />o 0 V <br />N N <br />-, C ,, 'Cr., <br />Cm01 <br />11 <br />0 (N;;�- <br />o4m ,_ 0 0- <br />Ne Lj -Lnrn <br />C <br />x <br />00 0=L2 <br />W) a. a- <br />S <br />28527 IQ, - <br />AL <br />05/02122 <br />N <br />0 <br />0 04 <br />0 N <br />N <br />C10 4 <br />N <br />C104 <br />N <br />N <br />C4 <br />N <br />N <br />0 <br />N <br />0 <br />N <br />o <br />0 <br />im <br />< <br /><¢ <br />< <br />< <br />CN <br />N <br />V) <br />N <br />CN <br />0 <br />N <br />0 <br />C'4 <br />1 <br />0 <br />V) <br />C*4 <br />> <br />10 <br />LLJ <br />> <br />Ld <br />< <br />U <br />LLJ <br />0 <br />� <br />V) <br />z <br />V) <br />z <br />LAJ <br />LLJ <br />z <br />0 <br />0 <br />0 <br />L) <br />_j <br />LLj <br />m <br />D <br />Uj <br />Uj <br />of <br />W <br />Q_ <br />0: <br />W <br />Q_ <br />00 <br />a. <br />V) <br />W <br />W <br />> <br />Uj <br />ca <br />Q_ <br />m <br />m <br />W <br />W <br />0_ <br />T <br />N0 <br />Project #. 20996 Store <br />#00852 <br />T <br />Designed By. <br />ADW <br />Drown By. <br />ADW <br />< <br />Checked By. <br />CJR <br />Date: 12-7-2021 <br />C14 <br />CN <br />0 <br />N <br />Scale. <br />20' <br />01 <br />Disk File: <br />20996-ENdwg <br />Model: <br />Address: <br />z <br />4919 EVERGREEN WAY <br />EVERETT, WA 98203 <br />0 <br />(N <br />1� <br />TESC PLAN <br />CFC <br />4M <br />FUELM FACLM <br />0 <br />Drawing No.: <br />cn <br />C2 1 <br />of 16 <br />F.ml <br />0 <br />CD <br />CD <br />. <br />