CITY OF EVERETT' TESC NOTES
<br />1. APPROVAL OF THIS ERCSION/SEDIMENTATION CONTROL (ESC) PLAN DOES
<br />NOT CONSTITUTE AN AP)ROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN
<br />(E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS,
<br />RETENTION FACILITIES, UTILITIES).
<br />2. THE IMPLEMENTATION 01' THESE ESC PLANS AND THE CONSTRUCTION,
<br />MAINTENANCE, REPLACEhIENT, AND UPGRADING OF THESE ESC FACILITIES IS
<br />THE RESPONSIBILITY OFTHE APPLICANT/CONTRACTOR UNTIL ALL
<br />CONSTRUCTION IS COMFLETED AND APPROVED AND
<br />VEGETATION/LANDSCAPING IS ESTABLISHED.
<br />3. THE BOUNDARIES OF TFiE CLEARING LIMITS SHOWN ON THIS PLAN SHALL
<br />BE CLEARLY FLAGGED III THE FIELD PRIOR TO CONSTRUCTION. DURING THE
<br />CONSTRUCTION PERIOD, 'NO DISTURBANCE BEYOND THE FLAGGED CLEARING
<br />LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE
<br />APPLICANT/CONTRACTOR, FOR THE DURATION OF CONSTRUCTION.
<br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN
<br />CONJUNCTION WITH ALL .CLEARING AND GRADING ACTIVITIES, AND IN SUCH
<br />A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER
<br />DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE
<br />APPLICABLE WATER QUA-ITYSTANDARDS.
<br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM
<br />REQUIREMENTS FOR AN11CIPATED SITE CONDITIONS. DURING THE
<br />CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS
<br />NEEDED FOR UNEXPECT7D STORM EVENTS AND TO ENSURE THAT SEDIMENT
<br />AND SEDIMENT -LADEN HATER DO NOT LEAVE THE SITE.
<br />6. THE ESC FACILITIES SH),LL BE INSPECTED ROUTINELY AND MAINTAINED BY
<br />THE APPLICANT/CONTRA-;,TOR TO ENSURE THEIR CONTINUED FUNCTIONING,
<br />ESPECIALLY AFTER STORM EVENTS.
<br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND
<br />MAINTAINED A MINIMUM X ONCE A MONTH OR WITHIN THE 48 HOURS
<br />FOLLOWING A MAJOR STORM EVENT.
<br />8. AT NO TIME SHALL MOFE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO
<br />ACCUMULATE WITHIN A '*RAPPED CATCH BASIN. ALL CATCH BASINS AND
<br />CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING
<br />OPERATION SHALL NOT IUSH SEDIMENT LADEN WATER INTO THE
<br />DOWNSTREAM SYSTEM.
<br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE
<br />BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE
<br />PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL
<br />PAVED AREAS ARE KEPI; CLEAN FOR THE DURATION OF THE PROJECT.
<br />10. THE CONTRACTOR SHALI-, PROVIDE PERIODIC STREET CLEANING TO REMOVE
<br />DEBRIS AND SEDIMENT '`RACKED OFF THE SITE.
<br />11. APPROPRIATE MEASURE'' SHALL BE TAKEN TO STOP SEDIMENT FROM
<br />ENTERING SURFACE WATrR BODIES IF THE PROPOSED BMPS FAIL.
<br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR
<br />UNSTABILIZED FOR NO 14ORE THAN 2 DAYS FROM OCTOBER 1 THROUGH
<br />APRIL 30, AND FOR NC MORE THAN 7 DAYS FROM MAY 1 THROUGH
<br />SEPTEMBER 30.
<br />CD EROSION CONTROL CALLOUTS:
<br />1 . CONTRACTOR TO INSTALL SILT FENCE AROUND PERIMETER OF SITE
<br />AS NECESSARY TO PREVENT SILT -LADEN RUNOFF FROM LEAVING
<br />SITE, AND AS DIRECTED BY CITY INSPECTOR. SEE DETAIL 1/C2.2.
<br />2. CONTRACTOR TO INSTALL TEMPORARY INLET SEDIMENT PROTECTION
<br />AT ALL EXISTING AND PROPOSED CATCH BASINS AS NECESSARY
<br />TO PREVENT SILT -LADEN WATER FROM ENTERING STORM DRAINAGE
<br />SYSTEM. COORDINATE PLACEMENT AS DIRECTED BY CITY
<br />INSPECTOR. SEE DETAIL 2/C2.2.
<br />3. APPROXIMATE LOCATION OF CONSTRUCTION STAGING AREA.
<br />CONTRACTOR TO USE THIS AREA FOR TEMPORARY STOCKPILE
<br />STORAGE AND CONCRETE WASHOUT. ADJUST SIZE AND LOCATION
<br />OF AREA AS NEEDED DURING CONSTRUCTION.
<br />4. CONTRACTOR TO INSTALL TEMPORARY STABILIZED CONSTRUCTION
<br />ENTRANCE ROCK PAD PER CITY STANDARDS. SEE DETAIL 3/C2.2.
<br />5. INSTALL TEMPORARY CONSTRUCTION FENCE AND 20' WIDE
<br />SITE ACCESS GATE (6' HIGH -CHAIN LINK WITH LOCKING DEVICE)
<br />AT TEMPORARY CONSTRUCTION ENTRANCES; PER DETAIL 5/C2.2.
<br />FIELD VERIFY AND CONFIRM EXACT LOCATION WITH OWNER.
<br />6. FLOW ARROWS INDICATING DIRECTION OF STORMWATER RUNOFF
<br />(TYP).
<br />7. APPROXIMATE LIMITS OF DISTURBANCE.
<br />8. APPROXIMATE LOCATION OF TEMPORARY "V" DITCH PER DETAIL 4/C2.2
<br />CONTRACTOR TO CONFIRM POSITIVE DRAINAGE.
<br />9. APPROXIMATE LOCATION OF TEMPORARY SEDIMENT TRAP.
<br />CONTRACTOR TO INSTALL TEMPORARY SEDIMENT TRAP.
<br />CONTRACTOR TO GRADE TO SEDIMENT TRAP. SEE DETAIL 6/C2.2.
<br />D] =Fft 4v 9[wm
<br />MINIMUM REQUIRED SURFACE AREA FOR SEDIMENT TRAP IS ;
<br />SA =2xQ/0.00096 = 736 SF
<br />02 =0.3533 CFS
<br />SA =2083 SF x 02
<br />SA = 736 SF
<br />DESIGN SURFACE AREA = 837 SF
<br />PROVIDE 6' WIDE OVERFLOW SPILLWAY.
<br />EROSION CONTFOL NOTES:
<br />DUST CONTROL NOTES:
<br />1. ALL NECESSARY EQUIPM1,NT AND MATERIALS SHALL BE
<br />1.
<br />WATER ALL ACTIVE CONSTRUCTION AREAS AT
<br />AVAILABLE ON SITE TO IACILITATE RAPID INSTALLATION OF
<br />LEAST TWICE DAILY.
<br />EROSION AND SEDIMENT ;CONTROL BMPS WHEN RAIN IS
<br />IMMINENT.
<br />2.
<br />WATER OR COVER STOCKPILES OF DEBRIS,
<br />SOIL, SAND OR OTHER MATERIALS THAT CAN
<br />2. THE CONTRACTOR SHALL: RESTORE ALL EROSION CONTROL
<br />BE BLOWN BY THE WIND.
<br />DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE
<br />AUTHORITY HAVING JURI�DICTION AFTER EACH RUN-OFF
<br />3.
<br />COVER ALL TRUCKS HAULING SOIL, SAND,
<br />PRODUCING RAINFALL.
<br />AND OTHER LOOSE MATERIALS OR REQUIRE
<br />ALL TRUCKS TO MAINTAIN AT LEAST TWO
<br />3. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION
<br />FEET OF FREEBOARD.
<br />CONTROL MEASURES AS MAY BE REQUIRED BY THE
<br />AUTHORITY HAVING JURI�IDICTION DUE TO UNCOMPLETED
<br />4.
<br />SWEEP DAILY (PREFERABLY WITH WATER
<br />GRADING OPERATIONS Olt UNFORESEEN CIRCUMSTANCES
<br />SWEEPERS) ALL PAVED ACCESS ROADS,
<br />WHICH MAY ARISE.
<br />PARKING AREAS AND STAGING AREAS AT
<br />CONSTRUCTION SITES.
<br />4. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER
<br />PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST
<br />5.
<br />SWEEP STREETS DAILY (PREFERABLY WITH
<br />BE INSTALLED AND MAINrAINED.
<br />WATER SWEEPERS) IF VISIBLE SOIL MATERIAL
<br />IS CARRIED ONTO ADJACENT PUBLIC STREETS.
<br />5. CONTRACTOR TO IMPLEM.NT SLOPE STABILIZATION MEASURES
<br />AS NECESSARY FOR EXFOSED SLOPES DURING
<br />CONSTRUCTION. MEASURES CAN INCLUDE TEMPORARY AND
<br />PERMANENT SEEDING PER DOE BMP C120.
<br />VA
<br />Sec. 31, Twp. 29N, Rge. 5E, W.M.
<br />TESC PLAN
<br />V9
<br />PROPOSED CITY OF
<br />EVERETT WATER EASEMENT
<br />In
<br />LAJ
<br />L NO, 870076
<br />870077
<br />co
<br />870078
<br />2 870079
<br />X 09
<br />A
<br />dp
<br />dp
<br />pF
<br />2
<br />Li
<br />z TOP 9 I .4
<br />Uj
<br />j
<br />X-ft 5
<br />3A
<br />Of
<br />3.1
<br />YJ 0
<br />Uj cfwj l
<br />
<br />01
<br />9
<br />BTM.
<br />Imo` �d
<br />4 zZ
<br />ROCK PAD (TYP)
<br />' o
<br />Z-9
<br />01
<br />ql> 0
<br />3
<br />W)
<br />UTILITY EASEMENT
<br />NO. 200811250386
<br />j
<br />t
<br />APPROXIMATE FOOTPRINT OF
<br />UNDERGROUND STORAGE TANK
<br />EXCAVATION. CONTRACTOR TO
<br />PROVIDE SHORING DESIGN AND
<br />ASSOCIATED PERMITTING. SEE UST
<br />EXCAVATION NOTE THIS SHEET.
<br />5
<br />7
<br />5
<br />PUBLIC TRANSPORTATION EASEMENT _Ag 4R)
<br />NO. 200807250218
<br />302
<br />A
<br />PROPERTY PROTECTION NOTE:
<br />STREET EASEMENT
<br />THE CONTRACTOR SHALL PROTE,T AND PRESERVE FROM DAMAGE, INTERFERENCE AND NO. 8806070036 P(U(;) _4�,
<br />DESTRUCTION ALL PRIVATE AND PUBLIC PROPERTY ON OR IN THE VICINITY OF THE WORK. IF 8806100156
<br />SUCH PROPERTY IS DAMAGED CR DESTROYED OR ITS USE INTERFERED WITH BY THE CONTRACTOR 9205260230
<br />OR HIS OR HER AGENTS, IT SHALL BE RESTORED IMMEDIATELY TO ITS FORMER CONDITION BY THE 4 0
<br />CONTRACTOR AT HIS OR HER E:(PENSE AND SUCH INTERFERENCE TERMINATED. 14
<br />N80'2546,w
<br />EASEMENT NOTE '480*25 777-77
<br />463-47-1--
<br />THE LOCATION OF THE EASEMEINTS SHOWN ON THIS SHEET SET WERE ADDED BASED ON THE SON
<br />INFORMATION INCLUDED IN THE TITLE REPORT UNDER FIRST AMERICAN TITLE INSURANCE
<br />COMPANY NO. NCS-1067959-0R1, DATED MAY 12, 2021. THESE EASEMENTS WERE NOT
<br />SURVEYED, THEREFORE BARGHAUSEN CONSULTING ENGINEERS DOES NOT GUARANTEE THE ROAD CENTER
<br />ACCURACY OF EASEMENT LOCATIONSLIN, ONS SHOWN ON THESE PLANS. 1, -- Ss SS
<br />con
<br />UTILITY PROTECTION NOTE: UST EXCAVATION NOTE:
<br />APPPnY1kJATl7 LOCATION 017 I7Y!qT1K1r. HT111T1l7q ARE ql4r)WN ON TW17ql7 PLANS. CONTRACTOR TO
<br />COORDINATE WITH PURVEYORS AND USE EXTREME CAUTION WHEN EXCAVATING ON -SITE, UNTIL TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS. TANK
<br />EXISTING GAS AND POWER SERVICE LOCATIONS ARE CONFIRMED. CONTRACTOR TO ORDER EXCAVATIONS WILL REQUIRE SHORING AND SHALL BE ENGINEERED
<br />INDEPENDENT UTILITY LOCATES (INCLUDING GAS AND POWER) FOR THE FULL SCOPE OF WORK AND PERMITTED SEPARATELY AND SHALL BE THE RESPONSIBILITY OF
<br />PRIOR TO CONSTRUCTION OR ANY GROUND DISTURBING ACTIVITIES. THE INSTALLING CONTRACTOR.
<br />UTILITY CONFLICT NOTE:
<br />THE CONTRACTOR SHALL BE RE`�PONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH A UTILITY POTHOLING NOTE:
<br />OF ALL EXISTING UTILITIES WHETIER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE
<br />UTILITIES AND SURVEYING THE H)RIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS THE CIRCLED LOCATIONS ARE REQUIRED TO BE POTHOLED TO
<br />SHALL INCLUDE CALLING UTILITY LOCATE 0 811 AND THEN POTHOLING ALL OF THE EXISTING VERIFY VERTICAL AND HORIZONTAL LOCATION OF EXISTING UTILITY
<br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT AND/OR POTENTIAL CONFLICTS WITH EXISTING UTILITIES. POTHOLING
<br />CONFLICTS EXIST. LOCATIONS CF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON SHALL BE PERFORMED PRIOR TO INSTALLING ANY PROPOSED
<br />THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD UTILITIES. CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING
<br />OCCUR, THE CONTRACTOR SHALL, NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE
<br />ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. ENGINEERS, INC. OF ANY CONFLICTS.
<br />01URTAV001TWOU"s- 111111111 AIL
<br />CONTRACTOR TO OVEREXCAVATE TO REVEAL FIRM NON -YIELDING, NON -ORGANIC
<br />SOIL. INSTALLATION OF STRUCTURAL FILL MAY BE REQUIRED TO PROVIDE A
<br />SUITABLE SUBGRADE FOR BUILDING FOUNDATIONS. CONTRACTOR TO REFER TO
<br />THE GEOTECHNICAL ENGINEERING REPORT PREPARED BY THE RILEY GROUP, INC.
<br />DATED JANUARY 7, 2020 FOR FOUNDATION SUBGRADE PREPARATION
<br />REQUIREMENTS.
<br />TEMPORARY EXCAVATION SLOPE NOTE:
<br />CONTRACTOR TO ENSURE TEMPORARY SLOPES HAVE A MAXIMUM SLOPE
<br />INCLINATION OF 1.5H:1V. CONTRACTOR TO REFER TO THE GEOTECHNICAL
<br />ENGINEERING REPORT PREPARED BY THE RILEY GROUP, INC. DATED JANUARY 7,
<br />2020 FOR EXCAVATION AND SLOPE REQUIREMENTS.
<br />0 101 20' 40'
<br />SCALE: 1 "=20'
<br />CITY OF EVES ETI.
<br />REVIENED FOR PERMIT
<br />Know what's below.
<br />Call before you dig.
<br />Dial 811
<br />Barghausen
<br />Consulting Engineers, Inc.
<br />18215 72nd Avenue South
<br />Kent, WA 98032
<br />425.251.6222
<br />barghausen.com
<br />BCE #20996
<br />a:
<br />W
<br />W
<br />04
<br />U')
<br />00
<br />4t:
<br />I
<br />Wcr
<br />z
<br />W
<br />W
<br />ILL
<br />0
<br />ILL
<br />0
<br />in
<br />C
<br />.0
<br />m
<br />Z.
<br />4,
<br />"a
<br />co fe 00
<br />0 V) 000
<br />0 00.3:
<br />0
<br />M
<br />Uj
<br />0 E_;A&S
<br />o 0 V
<br />N N
<br />-, C ,, 'Cr.,
<br />Cm01
<br />11
<br />0 (N;;�-
<br />o4m ,_ 0 0-
<br />Ne Lj -Lnrn
<br />C
<br />x
<br />00 0=L2
<br />W) a. a-
<br />S
<br />28527 IQ, -
<br />AL
<br />05/02122
<br />N
<br />0
<br />0 04
<br />0 N
<br />N
<br />C10 4
<br />N
<br />C104
<br />N
<br />N
<br />C4
<br />N
<br />N
<br />0
<br />N
<br />0
<br />N
<br />o
<br />0
<br />im
<br /><
<br /><¢
<br /><
<br /><
<br />CN
<br />N
<br />V)
<br />N
<br />CN
<br />0
<br />N
<br />0
<br />C'4
<br />1
<br />0
<br />V)
<br />C*4
<br />>
<br />10
<br />LLJ
<br />>
<br />Ld
<br /><
<br />U
<br />LLJ
<br />0
<br />�
<br />V)
<br />z
<br />V)
<br />z
<br />LAJ
<br />LLJ
<br />z
<br />0
<br />0
<br />0
<br />L)
<br />_j
<br />LLj
<br />m
<br />D
<br />Uj
<br />Uj
<br />of
<br />W
<br />Q_
<br />0:
<br />W
<br />Q_
<br />00
<br />a.
<br />V)
<br />W
<br />W
<br />>
<br />Uj
<br />ca
<br />Q_
<br />m
<br />m
<br />W
<br />W
<br />0_
<br />T
<br />N0
<br />Project #. 20996 Store
<br />#00852
<br />T
<br />Designed By.
<br />ADW
<br />Drown By.
<br />ADW
<br /><
<br />Checked By.
<br />CJR
<br />Date: 12-7-2021
<br />C14
<br />CN
<br />0
<br />N
<br />Scale.
<br />20'
<br />01
<br />Disk File:
<br />20996-ENdwg
<br />Model:
<br />Address:
<br />z
<br />4919 EVERGREEN WAY
<br />EVERETT, WA 98203
<br />0
<br />(N
<br />1�
<br />TESC PLAN
<br />CFC
<br />4M
<br />FUELM FACLM
<br />0
<br />Drawing No.:
<br />cn
<br />C2 1
<br />of 16
<br />F.ml