SOILS. <br />THE SITE IS UNDERLAIN B r UP TO FIVE FEET OF VERY LOOSE FILL COMPRISED OF <br />SILTY SAND WITH TRACE (RAVEL OVER NATIVE DEPOSITS OF MEDIUM DENSE TO VERY <br />DENSE SILTY SAND WITH ]`RACE GRAVEL, AND SAND WITH VARYING AMOUNT OF SILT <br />AND GRAVEL UP TO 20 F __ET. <br />SITE PREPARATION: <br />STRIPPING EFFORTS SHOU oD INCLUDED REMOVAL OF PAVEMENTS, VEGETATION, <br />ORGANIC MATERIALS AND DELETERIOUS DEBRIS FROM AREAS SLATED FOR BUILDING, <br />PAVEMENT AND UTILITY CONSTRUCTION. <br />THE RILEY GROUP, INC. ANTICIPATED THAT SOME AREA'S OF LOOSE SOIL MAY BE <br />PRESENT ON THE SITE AFTER STRIPPING. THEREFORE, ITS IS RECOMMEND THAT THE <br />BUILDING, PAVEMENT, AND OTHER AREAS TO RECEIVE STRUCTURAL AREAS ARE <br />PROOFROLLED AND COMPACTED. SOILS SHOULD BE COMPACTED TO ACHIEVE A <br />MINIMUM COMPACTION LEVI OF 95 PERCENT OF THE MODIFIED PROCTOR MAXIMUM <br />DRY DENSITY AS DETERMINED BY ATM D'1 57 TEST METHOD, PROOFROLLING AND <br />ADEQUATE SUBGRADE CON`PACTION CAN ONLY BE ACHIEVED WHEN THE SOILS ARE <br />WITHIN APPROXIMATELY ± ''2 PERCENT MOISTURE CONTENT OF THE OPTIMUM <br />MOISTURE CONTENT. <br />I THAT SUBGRAD_F SOILS HA BEyOME DISTURBED DUE TO ELEVATED MOISTURE CONDITIONS <br />SHOULD BE OVEREXCAVATI.D TO REVEAL FIRM, NON —YIELDING, NON —ORGANIC SOILS <br />AND BACKFILLED WITH CO 4dPACTED STRUCTURAL FILL. THE RILEY GROUP, INC. <br />RECOMMENDS THAT THE E NRTHWORK PORTION OF THIS PROJECT BE COMPLETED <br />DURING EXTENDED PERIODS OF WARM AND DRY WEATHER IF POSSIBLE. <br />EXCAVATIONS AND FILL <br />FOR EXCAVATION MORE TF AN 4 FEET BUT LESS THAN 20 FEET IN DEPTH, THE <br />TEMPORARY SIDE SLOPES SHOULD BE LAID BACK WITH A MINIMUM SLOPE <br />INCLINATION OF 1,5;1 (HORIZONTAL —.VERTICAL). IF THERE IS INSUFFICIENT ROOM TO <br />COMPLETE THE EXCAVATIONS IN THIS MANNER, OR EXCAVATIONS GREATER THAN 20 <br />FEET IN DEPTH ARE PLAN 4ED, TEMPORARY SHORING SHOULD BE USED. FOR OPEN <br />CUTS AT THE SITE THE RII`EY GROUP, INC. RECOMMENDS THE FOLLOWING: <br />NO TRAFFIC, CONSTF UCTION EQUIPMENT, STOCKPILES OR BUILDING SUPPLIES <br />ARE ALLOWED AT THE TOP OF CUT SLOPES WITHIN A DISTANCE OF AT LEAST <br />FEET FROM THE TOE OF THE CUT. <br />EXPOSED SOIL ALON 3 THE SLOPE IS PROTECTED FROM SURFACE EROSION <br />USING WATERPROOF TARPS AND/OR PLASTIC SHEETING. <br />CONSTRUCTION ACTH TIES ARE SCHEDULED SO THAT THE LENGTH OF TIME THE <br />TEMPORARY CUT IS LEFT OPEN IS MINIMIZED <br />SURFACE WATER IS 31VERTED AWAY FROM THE EXCAVATION <br />THE GENERAL CONDITION OF SLOPES SHOULD BE OBSERVED PERIODICALLY BY <br />A GEOTECHNICAL EN 'JINEER TO CONFIRM ADEQUATE STABILITY AND EROSION <br />CONTROL MEASURES. <br />THE RILEY GROUP, INC. RECOMMENDS FILL BELOW THE FOUNDATION AND FLOOR <br />SLAB, AND BELOW PAVEMENT AND HARDSCAPE SURFACES BE PLACED IN <br />ACCORDANCE WITH THE FOLLOWING RECOMMENDATION FOR STRUCTURAL FILL. THE <br />SANDY NATIVE SOILS MAY BE SUITABLE FOR STRUCTURAL FILL IF THE MOISTURE CAN <br />BE PROPERLY CONTROLLEI) AT THE TIME OF COMPACTION IF THE CONSTRUCTION <br />OCCURS IN DRY WEATHER IF NOT, IT MAY BE NECESSARY TO IMPORT CLEAN, <br />GRANULAR SOILS THAT MELTS THE GRADING REQUIREMENT IN THE GEOTECHNICAL <br />REPORT. STRUCTURAL FILL. MATERIALS SHOULD BE PLACED IN UNIFORM LOOSE <br />LAYERS NOT EXCEEDING 12 INCHES AND COMPACTED AS SPECIFIED IN THE <br />GEOTECHNICAL REPORT. <br />GROUNDWATER: <br />GROUNDWATER WAS NOT ENCOUNTERED DURING THE SUBSURFACE EXPORTATION. IT <br />SHOULD BE RECOGNIZED THAT FLUCTUATION OF THE GROUNDWATER TABLE WILL <br />OCCUR DUES TO SEASONAL {' VARIATION. IN ADDITION, PERCHED WATER CAN DEVELOP <br />WITHIN SEAMS AND LAYER 3 CONTAINED IN FILL SOIL OR HIGHER PERMEABILITY SOILS <br />OVERLYING LESS PERMEAE.LE SOILS FOLLOWING PERIODS OF HEAVY OR PROLONGED <br />PRECIPITATION. <br />z„ c <br />WALKWAYS ALONG ACCESSIBLE EOUTES OF TRAVEL SHALL BE <br />CONTINUOUSLY ACCESSIBLE, BE A MINIMUM OF 44" IN WIDTH, HAVE <br />A MAXIMUM 2.0% CROSS SLOPE; AND SHALL HAVE RAMPS <br />COMPLYING WITH ACCESSIBILITY STANDARDS (SECTION 405) WHERE <br />NECESSARY TO CHANGE ELEVATI?N AT A LONGITUDINAL SLOPE <br />EXCEEDING S% (1e20). <br />1. ALL SPOT ELEVATIONS SHOWN ARE TO FINISH SURFACE (TOP OF ASPHALT OR TOP OF CONCRETE <br />PAVEMENT, NOT TOP OF CURB/SIDEWALK) UNLESS OTHERWISE NOTED. (TA = TOP OF ASPHALT, TC <br />TOP OF CONCRETE SIDEWALK/CURB, ME = MATCH EXISTING ELEVATIONS, FU m FLUSH CURB, FL <br />FLOW LINE, OU ® GRADE BREAK) <br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL PROPOSED GRADES IN RELATIONSHIP TO <br />SURVEYED BASIS OF ELEVATION. <br />3. FILL MATERIAL AND COMPACTION SHALL CONFORM TO THE GEOTECHNICAL REPORT AND CITY OF EVERETT <br />REQUIREMENTS. <br />4. CONTRACTOR TO PROTECT AND MAINTAIN EROSION CONTROL FACILITIES DURING GRADING OPERATIONS. <br />S. CONSTRUCTION AND MATERIALS SMALL BE IN ACCORDANCE WITH THE GEOTECHNICAL REPORT AND CITY <br />OIL EVERETT REQUIREMENTS. <br />6. CONTRACTOR TO RAISE AND ADJUST PROPOSED SANITARY SEWER CLEANOUTS LIDS TO FINAL GRADE A <br />NECESSARY. CLEANOUTS WITHIN ADA ACCESSIBLE PATHS SHALL BE ADJUSTED TO FINAL ELEVATIONS IN <br />COMPLIANCE WITH CURRENT ADA REQUIREMENTS. <br />7. CONTRACTOR TO RAISE AND ADJUST ALL EXISTING AND PROPOSED CATCH BASIN RIDS TO FINAL GRADE <br />AS NECESSARY. CATCH BASINS WITHIN ADA ACCESSIBLE PATHS SHALL BE ADJUSTED TO FINAL <br />ELEVATIONS IN COMPLIANCE WITH CURRENT ADA STANDARDS. <br />8. CONTRACTOR TO ORDER LOCATES AND FIELD VERIFY ALL UTILITIES PRIOR TO CONSTRUCTION TO ENSURE <br />THAT UTILITY CONFLICTS DO NOT EXIST. CONTRACTOR TO REVIEW UTILITY ASBUILTS IN ORDER TO VERIFY <br />EXISTING UTILITY LOCATIONS. CONTRACTOR SMALL POTHOLE ALL POTENTIAL UTILITY CONFLICTS PRIOR TO <br />CONSTRUCTION. NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. OF ANY CONFLICTS. <br />PROPERTY IR�T NOTE., <br />THE CONTRACTOR SHALL PROTE T AND PRESERVE FROM DAMAGE, INTERFERENCE AND <br />DESTRUCTION ALL PRIVATE AND PUBLIC PROPERTY ON OR IN THE VICINITY OF THE WORK. IF <br />SUCH PROPERTY IS DAMAGED OR DESTROYED OR ITS USE INTERFERED WITH BY THE CONTRACTOR <br />OR HIS OR HER AGENTS, IT SH,\LL BE RESTORED IMMEDIATELY TO ITS FORMER CONDITION BY THE <br />CONTRACTOR AT HIS OR HER E ePENSE AND SUCH INTERFERENCE TERMINATED. <br />EASEMENT NOTE: <br />THE LOCATION OF THE EASEMEI TS SHOWN ON THIS SHEET SET WERE ADDED BASED ON THE <br />INFORMATION INCLUDED IN THE TITLE REPORT UNDER FIRST AMERICAN TITLE INSURANCE, <br />COMPANY NO. NCS-1067959-01�1, DATED MAY 12, 2021a THESE EASEMENTS WERE NOT <br />SURVEYED, THEREFORE BARGHAUSEN CONSULTING ENGINEERS DOES NOT GUARANTEE THE <br />ACCURACY OF EASEMENT LOCATIONS SHOWN ON THESE PLANS. <br />UTILITY PROTECTIONT <br />APPROXIMATE LOCATION OF EXISTING UTILITIES ARE SHOWN ON THESE PLANS. CONTRACTOR TO <br />COORDINATE WITH PURVEYORS ;AND USE EXTREME CAUTION WHEN EXCAVATING ON —SITE, UNTIL <br />EXISTING GAS AND POWER 'ERVICE LOCATIONS ARE CONFIRMED. CONTRACTOR TO ORDER <br />INDEPENDENT UTILITY LOCATES (INCLUDING GAS AND POWER) FOR THE FULL SCOPE OF WORK <br />PRIOR TO CONSTRUCTION OR AP 1Y GROUND DISTURBING ACTIVITIES, <br />THE CONTRACTOR SHALL BE RE! POSSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH <br />OF ALL EXISTING UTILITIES WHET3ER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE <br />UTILITIES AND SURVEYING THE H )RIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS <br />SHALL INCLUDE CALLING UTILITY LOCATE 0 811 AND THEN POTHOLING ALL OF THE EXISTING <br />UTILITIES AT LOCATIONS OF NEW' UTIL ITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT <br />CONFLICTS EXIST, LOCATIONS G F SAID UTILITIES AS SHOWN ON THESE FLANS ARE BASED UPON <br />THE UNVERIFIED PUBLIC INFORM,.kTION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD <br />OCCUR, THE CONTRACTOR SHALL,! NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE <br />ALL PROBLEMS PRIOR TO PROCFEDING WITH CONSTRUCTION, <br />II�III .� I <br />N�_}�. <br />PROPOSED CONTOUR <br />EXISTING CONTOUR <br />PROPOSED RIDGE LINE <br />SWALE FLOWLINE <br />PROPOSED GRADING SLOPE <br />SPOT ELEVATION <br />FLUSH ELEVATION <br />MATCH EXISTING ELEVATION <br />TOP OF PAVEMENT/TOP OF CURB <br />FLOW/GUTTER LINE/TOP OF CURB <br />----o 30 - - - - - <br />., 0 <br />1,00% <br />� 30.0 1 FC <br />30_ 1 ± ME <br />30.01 TA <br />30.51 TC <br />�, 3Q 1 FL <br />I <br />f <br />i U13 <br />r <br />302.I <br />I 302.7 <br />- . <br />303.��t <br />0.I e0 <br />° 303.04. r o <br />° 302 <br />0.6io 3Q2, <br />J % <br />302, <br />302.99 0,5Z <br />' 1 5p % <br />F , 302,9 <br />302.95 <br />a <br />3O 9210 <br />-3 13 (OF rEN R r <br />Iv <br />3 x y ,r O ., <br />.,... d< R'Tl, PER 11, R � 1 <br />Know what'sIS <br />Call before u di <br />y� <br />Dial 811 <br />Barghausen <br />Consulting Engineers, Inc. <br />I <br />W <br />W <br />W <br />I v <br />cc <br />z <br />m <br />0 pg � <br />W <br />LL <br />0 <br />LL <br />3 <br />P <br />0 CN <br />�3 <br />Owl <br />dn 0-0 <br />2r <br />V10.a-L, <br />05/02/22 <br />Q <br />N <br />N <br />0 <br />0 <br />Uj <br />N <br />N <br />N <br />e a <br />a) <br />I <br />l <br />I <br />I <br />I <br />04 <br />a <br />IAJ <br />W <br />m m <br />z <br />0 0 <br />0 U <br />LJ <br />L, <br />L_ <br />LLj Lyq <br />)®g9 � <br />L'I <br />� Uj <br />0 <br />i <br />ZITLI <br />I I <br />T <br />Project . 20996 <br />Store #00852 <br />s <br />Deigned By. ADW <br />Drawn By. ADW <br />- <br />< <br />Checked By. CJR <br />Date: 12- 7-2021 <br />Sca e. <br />1 e ° <br />tv <br />Disk File; <br />20996-GD.dw(j <br />00 <br />Model: <br />Address; - - --- <br />4919 EVERGREEN WAY <br />EVERETT, WA 98203 <br />