Laserfiche WebLink
RACKS <br />FOUND 1/2M IEAVkLYAY y ,.:3PROPOSED CONCRETE 1 <br />c.£'..�..& 0�aa' t "P" CYkS;._�sF�.�F �Df.� 9,.sP�B@.,� - - <br />fR - <br />SOIL RETENTION, RETAIN: IN AN UNDISTURBED STATE, THE DUFF LAYER AND NATIVE TOPSOIL TO THE MAXIMUM EXTENT PRACTICABLE. IN <br />i ANY AREAS REQUIRING GRADING REMOVE AND STOCKPILE THE DUFF LAYER AND TOPSOIL ON SITE IN A DESIGNATED, CONTROLLED AREA, <br />NOT ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS, TO BE REAPPLIED TO OTHER PORTIONS OF THE SITE WHERE FEASIBLE. <br />SOIL QUALITY. ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN COVERED BY IMPERVIOUS SURFACE, INCORPORATED. <br />` INTO A DRAINAGE FACILITY OR ENGINEERED AS STRUCTURAL FILL OR SLOPE SHALL.., AT PROJECT COMPLETION, DEMONSTRATE THE <br />t GRtDE AREA OVER 407., FOLLOWING: <br />TRACT 999 1. A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF. 1 O DRY WEIGHT IN PLANTING BEDS, AND 5% ORGANIC MATTER <br />y CONTENT IN TURF .AREAS, AND .A PH FROM 6.0 TO 8.0 OR. MATCHING THE PH OF THE UNDISTURBED SOIL, THE TOPSOIL LAYER SHALL <br />HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED <br />TO MEET THE CRITERIA. SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES WITH SOME INCORPORATION <br />OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE. <br />EXISTING SIDE�E ������ � ��,v NL-I l ln1� TE: 2. MULCH PLANTING BEDS WITH 2 INCHES OF ORGANIC MATERIAL <br />��� <br />. USE COMPOST AND OTHER MATERIALS THAT FEET THESE ORGANIC CONTENT .REfUIREMENTS <br />CONTACTOR TO POTI—TOLE AND VERIFY SEWER 0. THE ORGANIC CONTENT FOR 'PRE— APPROVED" AMEN DMENT DATES CAN DE MET ONLY USING COMPOST MEETING THE COMPOST <br />ass <br />t DEPTH PRIOR TO CONSTRUCTION. SPECIFICATION FOR BMP T7.30: BIOsRETENTION CELLS, S TALES, AND PLANTER BOXES (P.959)9 :WITH THE EXCEPTION THAT THE <br />COMPOST MAY HAVE UP TO 5% BIOSOLIDS OR MANURE. THE COMPOST MUST ALSO HAVE AN ORGANIC MATTER CONTENT OF 40% TO <br />65 AND A CARBON TO NITROGEN RATIO BELOW 2: 1. THE CARBON TO NITROGEN RATIO) MAY DE AS HIGH AS 35:1 FOR PLANTINGS <br />COMPOSED ENTIRELY OF PLANTS NATIVE TO TI-1cPR IGE T SOUND LOWLANDS RE —ION. <br />to <br />b. CALCULATED AMENDMENT DATES MAY BE MET THROUGH USE OF COMPOSTED MATERIAL MEETING ('A,) ABOVE; OR OTHER ORGANIC <br />s"ww t �? �g t F \� `�., � _ MATERIALS AMENDED TO MEET THE CARBON TO NITROGEN RATIO REQUIREMENTS, AND NOT EXCEEDING THE CONTAMINANT LILIMITSi< n { `^Z 0 C.^lowy. -- IDENTIFIED INTABLE 220-D, TESTING PARAMETERS, IN 'SAC 173-550-220. <br />f 2' �' T -� \7, <br />VE" <br />` ° THE RESULTING SOIL SHOULD DE CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED. <br />—'\ %, wt <br />' \ _ �' Nn IMPLEMENTATION OPTIONS: THE SOIL QUALITY DESIGN GUIDELINES LISTED ABOVE CAN DE DIET BY USING ONE OF THE METHODS LISTED <br />P BELOW: <br />55 <br />EXC 1, LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM COMPACTION CTION DURING CONSTRUCTION, <br />?_:..: vv <br />AMEND EXISTING ING SITE TOPSOIL OR SUBSOIL EITHER AT DEFAULT 'PRE—APPROVEDDATES, OR AT. CUSTOM CALCULATED DATES BASED <br />ON TESTS OF THE SOIL AND AMENDMENT. <br />s z b..� 3. STOCKPILE EXISTING TOPS® <br />\ _- ..z <br />FIR 0 <br />f , 2'3 ,„ PVC IL DURING GRADING, AND REPLACE IT PRIOR TO PLANTING. STOCKPILED TOPSOIL MUST ALSO BE AMENDED <br />�. 1 r� "` IF NEEDED TO MEET THE ORGANIC MATTER OR DEPTH REQUIREMENTS, EITHER AT A DEFAULT `PRE— APPROVED" RATE OR AT A CUSTOM <br />N ft✓ E�Y Z It B, AL i t <„r "�. ' r a. 9 -._.' �? G ' € - <br />__,_,,�' mV AC, ._.` s `� i .,. ;ITRACT <br />.mu= CALCULATED DATE. <br />`� x, S.0 4. IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH TO MEET THE REQUIREMENTS. <br />} t 1 <br />MORE THAN ONE METHOD MAY BE USED ON DIFFERENT PORTIONS OF THE SAME SITE, SOIL THAT ALREADY MEETS THE DEPTH AND <br />ORGANIC MATTER QUALITY® STANDARDS, AND IS NOT COMPACTED, DOES. NOT NEED TO BE AMENDED. <br />EX <br />z'� FLOC 4 3 ' AREA A -AREA B <br />7 PARCEL/ BARROW <br />STOCKPILE AND LJ <br />UNCOMPACTED, UNGRADED, <br />(TYP.)MA =115­1 <br />_ a "li _ r AMEND SOIL IF UNDISTURBED <br />y@q tE _ 10 "' ✓$ � ,.�� ,„, ,._i� NECESSARY "OPTION a' <br />OT 5 <br />s38 <br />37,595 SF <br />YARD :. <br />f DRAIN F 110.08 <br />r LINAGE NOTES <br />BASIC DRDOWNSTREAM <br />FLOW L A <br />r > at g <br />ARROWS/ E € 1. NO DART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT <br />_ (TAP HAS BEEN INSPECTED, aTESTED AND ACCEPTED BY THE CITY OF EVERETT. <br />�' d ,I jai • •®` s } a`�' . - <br />�' 2. ALL. WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION <br />ADDITIONAL 'D/W . a' �" �a ..��•.kl�R <br />(1,549 SF) e ` �� , _ •�4s m: x STANDARDS AND SPECIFICATIONS AND THE SDOT/AP A STANDARD SPECIFICATIONS FOR LOAD, <br />�.. �. CONNECT N DRAINS BRIDGE, AND MUNICIPAL CONSTRUCTION CURRENT EDITION). <br />CONVEYANCE ( ) <br />Vr , — 5. APPROXIMATE LOCATIONS OF 'EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS <br />AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL DE RESPONSIBLE FOR VERIFICATION <br />OF LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH <br />'yam EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY" THE PUBLIC <br />°k v„ e WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER <br />f °f " ` t PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. <br />AREA `A' f f f ! s / v: 4 r <br />3,145 SFDOWNSPOUT, f � f,` f 4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT—OF—WAY OR IN EASEMENTS DUST BE STAKED BY <br />t, <br />f SURVEY FOR LIME AND GRADE PRIOR TO STARTING CONSTRUCTION. <br />1� CONNECTION <br />YARD DRAIN._P }' 5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO <br />ff 2'/ ,, f f STREAM, LAKE, RIVER, PUGE�T SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE <br />5, PROJECT. <br />L iD V''+.os NE I E....w. 5 > 0 2 4 S !`Y` <br />11 <br />t1PVCSL.. I. w? S,A z�I <br />t X <br />SWALE- <br />F i <br />50a INGRESS, EGRESS <br />�c UTILITY ESM T <br />- g APIDAT[ <br />i <br />r <br />a_ I <br />- _ <br />-IT <br />CALL 48 HOURS <br />0 Ds <br />ISS BEFORE YOU, DIG <br />ss <br />811 <br />t NO PARKING <br />L€JECORATIVE YARD LIGHT <br />'.,'.S ..i� r � t <br />,.......,.. E ,.., t P �. -ii t test, f.. <br />PUBLIC SERWCES A 8 <br />_ UB111gy- <br />U 71; 77ES D RANAG <br />A PUBLIC WORKS PERMIT IS REQUIRED <br />STARTING ANY CONSTRUCTION ON TH <br />PROJECT APPROVAL FOR THIS PRO, <br />CITE' ENGIMEER IS COND1770NAL PER CURRENT STANE <br />AND EXPIRES UNLES: <br />FOR CONSTRUCTION HAS BEEN ISSUE <br />E) <br />I <br />al <br />­ I . <br />, <br />­ I <br />m <br />0 <br />w <br />c6w< <br />1 <br />CL <br />(D <br />-< <br />j <br />0. <br />U) <br />Z <br />W <br />F_ <br />< <br />2 <br />- <br />I® <br />- <br />00 <br />0 <br />m <br />0 <br />< <br />LU <br />w, <br />LL <br />0 <br />0 <br />- <br />0 <br />z <br />ce <br />