Laserfiche WebLink
REQUIRED <br />REPORT ITEM <br />APPLICABLE <br />CROWN DOC <br />BRIEF DESCRIPTION <br />PRE® <br />, <br />THIS CHECKLISTSERVES <br />S S � A GUIDELINE FOR THE REQUIRED C�-f�JC�I DOCUMENTS AND <br />X <br />MI CHECKLIST DRAWING <br />CE ®SOW�1007 <br />INSPECTIONS FOR THIS MODIFICATION. <br />ONCE THE PRE -MODIFICATION APPI G IS COMPLETE AND PRIOR TO FABRICATION, THE CONTRACTOR SHALL <br />PROVIDE DETAILED ASSEMBLY DRAWINGS AND/OR SHOP DRAWINGS. THESE INCLUDE, BUT ARE NOT LIMITED <br />TO, A VISUAL LAYOUT OF NEW REINFORCEMENT, EXISTING REINFORCEMENT CONFIGURATION, PORTHOLES, <br />X <br />FOR APPROVED SHOP DRAWINGS <br />C D-S W®10007 <br />MOUNTS, STEP PEGS, SAFETY CLIMBS AND ANY THER MISCELLANEOUS ITEMS WHICH MAY AFFECT <br />SUCCESSFUL INSTALLATION OF MODIFICATIONS ON THE TOWER. THESE DRAWINGS SHALL BE SUBMITTED TO <br />THE FOR FOR APPROVAL. SHOP DRAWINGS SUBMISSION SMALL INCLUDE THE FOR RFI FORM DETAILING ANY <br />CHANGES FROM TIME ORIGINAL DESIGN. <br />A LETTER FROM THE FABRICATOR, STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH <br />X <br />FABRICATION INSPECTION <br />CED®SOW-10 07 <br />INDUSTRY STANDARDS AND THE CONTRACT DOCUMENTS, SHALL BE PROVIDED TO THE MI INSPECTOR FOR <br />INCLUSION IN THE MI REPORT. <br />X <br />FABRICATOR CERTIFIED WELD INSPECTION <br />CED®SOW-100 7 <br />A CWI SMALL INSPECT ALL WELDING PERFORMED ON STRUCTURAL MEMBERS DURING FABRICATION. A <br />CED®STD-100 9 <br />WRITTEN REPORT SHALL BE PROVIDED TO THE Mi INSPECTOR FOR INCLUSION IN THE MI REPORT. <br />MATERIAL TEST REPORTS ( TR) <br />CED-SOW-10007 <br />MATERIAL -TEST REPORTS SMALL BE PROVIDED FOR MATERIAL USED AS REQUIRED PER SECTION 9.3.5 OF <br />CED®SOWm10007. MTRS SHALL BE PROVIDED TO TIME MI INSPECTOR FOR INCLUSION IN THE MI REPORT. <br />CED-SOW-10066 <br />CRITICAL SHOP WELDS THAT REQUIRE TESTING ARE NOTED ON THESE CONTRACT DRAWINGS. A CERTIFIED <br />A <br />FABRICATOR NDE INSPECTION REPORT <br />CED�STD®10069 <br />DTINSPECTORSMALL PERFORM NON-DESTRUCTIVE EXAMINATION AND A REPORT SHALL BE PROVIDED TO <br />THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. <br />NA <br />NDE OF MONOPOLE BASE PLATE <br />ENG-SOW®10033 <br />A NDE OF THE POLE TO BASE PLATE CONNECTION IS REQUIRED AND A WRITTEN REPORT SHALL BE PROVIDED <br />TO THE MI INSPECTOR FOR INCLUSION IN THE Mi REPORT. <br />X <br />PACKING SLIPS <br />CED-SOW-10007 <br />PACKING/SHIPPING LIST FOR ALL MATERIAL THAT WAS USED DURING THE CONSTRUCTION OF <br />THE MODIFICATION. <br />ADDITIONAL TESTING AND INSPECTIONS: <br />A <br />CONSTRUCTION,,�. <br />A VISUAL OBSERVATION OF THE EXCAVATION AND REBAR SHALL BE PERFORMED BEFORE PLACING THE <br />NA <br />FOUNDATION INSPECTIONS <br />CED®S -10144 <br />CONCRETE. A VISUAL OBSERVATION OF THE REBAR SMALL BE PERFORMED BEFORE PLACING THE EPDXY. A <br />SEALED WRITTEN REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. <br />NA <br />CONCRETE COMP. STRENGTH AND SLUMP TEST <br />CED-SOW-10144 <br />THE CONCRETE MIX DESIGN, SLUMP TEST, AND COMPRESSIVE STRENGTH VESTS SHALL BE PROVIDED AS <br />PART OF THE FOUNDATION REPORT. <br />NA <br />EARTHWORK <br />CED-SOW-10144 <br />FOUNDATION SUB -GRADES SMALL BE INSPECTED AND APPROVED BY AN APPROVED FOUNDATION INSPECTOR <br />AND RESULTS INCLUDED AS PART OF THE FOUNDATION REPORT. <br />ICROPILES/ROCK ANCHORS SMALL BE INSPECTED BY THE FOUNDATION INSPECTION VENDOR AND SHALL BE <br />A <br />ICROPILE/ROCK ANCHOR <br />CED-SOW-10144 <br />INCLUDED AS PART OF THE FOUNDATION INSPECTION REPORT, ADDITIONAL TESTING AND/OR INSPECTION <br />REQUIREMENTS ARE NOTED IN THESE CONTRACT DOCUMENTS. <br />- <br />CED®SOW-10007 <br />POST INSTALLED ANCHOR ROD VERIFICATION SHALL BE PERFORMED l ACCORDANCE WITH CROW <br />NA <br />POST -INSTALLED ANCHOR ROD VERIFICATION <br />CED-FR -10 53 <br />REQUIREMENTS AND A REPORT SMALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI <br />REPORT. <br />THE GENERAL CONTRACTOR SHALL PROVIDE DOCUMENTATION TO THE MI INSPECTOR THAT CERTIFIES THAT <br />NA <br />BASE PLATE GROUT VERIFICATION <br />ENG-STDm10323 <br />THE GROUT WAS REMOVED AND/OR INSTALLED IN ACCORDANCE WITH CROWN REQUIREMENTS FOR <br />INCLUSION IN THE MI REPORT. <br />A CROWN APPROVED CERTIFIED WELD INSPECTOR SMALL INSPECT AND TEST FIELD WELDS, FOLLOWING ALL <br />CED®S W-10066 <br />PROCEDURES SPECIFIED IN CROWN STANDARD DOCUMENTS APPLICABLE TO WELD INSPECTIONS. A REPORT <br />NA <br />FIELD CERTIFIED WEL®I INSPECTION <br />CE -STD-10069 <br />SHALL BE PROVIDED. NDE OF FIELD WELDS SMALL BE PERFORMED AS REQUIRED BY CROWN STANDARDS <br />AND CONTRACT DOCUMENTS. THE NDE REPORT SHALL BE INCLUDED IN THE C I REPORT. <br />G�STUG1 14 <br />TIME GENERAL CONTRACTOR SMALL PROVIDE WRITTENAND PHOTOGRAPHIC DOCUMENTATION TO THE MI <br />X <br />ON -SITE COLD GALVANIZING VERIFICATIONE <br />CED-FR -1033 <br />INSPECTOR VERIFYING THAT ANY ON -SITE COLD GALVANIZING 11\/AS APPLIED PER MANUFACTURER <br />' <br />SPECIFICATIONS AND APPLICABLE STANDARDS. <br />A <br />TENSION TWIST AND PLUMB <br />CED-PRC-10132 <br />THE GENERAL CONTRACTOR SHALL PROVIDE A REPORT IN ACCORDANCE WITH APPLICABLE STANDARDS <br />CED-STD-10261 <br />DOCUMENTING TENSION TWIST AND PLUMB. <br />THE GENERAL CONTRACTOR SMALL SUBMIT A LEGIBLE CONY OF THE ORIGINAL DESIGN DRAWINGS EITHER <br />X <br />GC AS -BUILT DRAWINGS <br />CE -SOW-10007 <br />STATING "INSTALLED AS DESIGNED" OR NOTING ANY CHANGES THAT WERE REQUIRED ARID APPROVED BY <br />THEENGINEER OF RECORD. EOR1 FI FORMS APPROVING ALL CHANGES SHALL BE SUBMITTED, <br />ADDITIONAL TESTING AND INSPECTIONS: <br />NA <br />CED-S W-100 7 <br />A LETTER FROM THE GENERAL CONTRACTOR STATING THAT THEWORKMANSHIP AS PERFORMED IN <br />X <br />CONSTRUCTION COMPLIANCE LETTER <br />ACCORDANCE WITH INDUSTRY STANDARDS AND THESE CONTRACT DRAWINGS, INCLUDING LISTING <br />CE -F `10353 <br />ADDITIONAL PARTIES TO THE MODIFICATION PROCESS. <br />NA <br />POST -INSTALLED ANCHOR ROD PULL TESTS <br />CED-PRC-10119 <br />POST -INSTALLED ANCHOR RODS SHALL BE TESTED BY A CROWN APPROVED PULL TEST INSPECTOR AND A <br />REPORT SMALL BE PROVIDED INDICATING TESTING RESULTS. <br />PHOTOGRAPHS SHALL BE SUBMITTED TO THE MI. PHOTOS SHALL DOCUMENT ALL PHASES OF THE <br />X <br />PHOTOGRAPHS <br />CED-SO -100 7 <br />CONSTRUCTION. THE PHOTOS SHALL BE ORGANIZED IN A MANNER THAT EASILY IDENTIFIES THE EXACT <br />LOCATION OFT E PHOTO, <br />THE Mi INSPECTOR SHALL VERIFY THE INSTALLATION AND TIGHTNESS 10% OF ALL NON PRE -TENSIONED <br />BOLTS INSTALLED AS FART OF THE MODIFICATION. THE MI INSPECTOR SHALL LOOSEN THE NUT AND VERIFY <br />NA <br />BOLT HOLE INSTALLATION VERIFICATION REPORT <br />CED®SOW®10007 <br />THE BOLT DOLE SIZE AND CONDITION. THE MI REPORT SHALL CONTAIN THE COMPLETED BOLT INSTALLATION <br />VERIFICATION REPORT, INCLUDING THE SUPPORTING PHOTOGRAPHS. <br />X <br />PUNCH LIST DEVELOPMENT AND CORRECTION <br />CED-PRC-10233 <br />FINAL PUNCHLIST INDICATING ALL NONCONFORMANCE(S) IDENTIFIED AND THE FINAL RESOLUTION/APPROVAL. <br />DOCUMENTATION <br />CED-FRM-10235 <br />X <br />MI INSPECTOR REDLINE OR RECORD DRAWING(S) <br />CED-SOW-10007 <br />THE M! INSPECTOR SHALL OBSERVE ARID REPORT ANY DISCREPANCIES BETWEEN THE CONTRACTOR'S <br />REDLINE DRAWING AND THE ACTUAL COMPLETED INSTALLATION. <br />ADDITIONAL TESTING AND INSPECTIONS: <br />NA <br />i <br />THE Mi IS AN ON -SITE VISUAL AND D - HAN � ON INSPECTION OF TOWER MODIFICATIONS INCLUDING A REVIEW OF CONSTRUCTION REPORTS AND <br />ADDITIONAL PERTINENT DOCUMENTATION PROVIDED BY THE GENERAL CONTRACTOR (GC), AS WELL AS ANY INSPECTION DOCUMENTS PROVIDED BY <br />3RD PARTY INSPECTORS. THE MI IS TO ENSURE THE INSTALLATION WAS CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, NAMELY <br />THE MODIFICATION DRAWINGS; IN ACCORDANCE WITH APPLICABLE CROWN STANDARDS, AND AS DESIGNED BY THE ENGINEER OF RECORD (EOR). <br />NO DOCUMENT, CODE OR POLICY CAN ANTICIPATE EVERY SITUATION THAT MAY ARISE. ACCORDINGLY, THIS CHECKLIST IS INTENDED TO SERVE AS A <br />SOURCE OF GUIDING PRINCIPLES IN ESTABLISHING GUIDELINES FOR MODIFICATION INSPECTION. <br />THE Mi IS TO CONFIRM INSTALLATION CONFIGURATION AND WORKMANSHIP ONLY AND IS NOT A REVIEW OF THE MODIFICATION DESIGN ITSELF, AND THE <br />MI INSPECTOR DOES NOT TAKE OWNERSHIP OF THE MODIFICATION DESIGN. OWNERSHIP OF THE STRUCTURAL MODIFICATION DESIGN EFFECTIVENESS <br />AND INTEGRITY RESIDES WITH THE FOR AT ALL TIMES. THE MI INSPECTOR SMALL INSPECT AND NOTE CONFORMANCE/NONCONFORMANCE AND PROVIDE. <br />TO THE CROWN POINT OF CONTACT (CROWN POC) FOR EVALUATION. <br />ALL MI'S SHALL BE CONDUCTED BY A CROWN APPROVED MI INSPECTOR, WORKING FOR A CROWN APPROVED MI VENDOR. SEE CROWN CED-LST-10173, <br />"APPROVED Mi VENDORS". <br />TO ENSURE THAT THE. REQUIREMENTS OF THE MI ARE MET, IT IS VITAL THAT THE GENERAL CONTRACTOR (GC) AND THE MI INSPECTOR BEGIN <br />COMMUNICATING AND COORDINATING AS SOON AS A PURCHASE ORDER (PO) IS RECEIVED. IT IS EXPECTED THAT EACH PARTY WILL BE PROACTIVE IN <br />REACHING OUT TO THE OTHER PARTY. IF CONTACT INFORMATION IS NOT KNOWN THE GC AND/OR INSPECTOR SHALL CONTACT THE CROWN POINT OF <br />CONTACT (CROWN POC). <br />No. I DATE I oescaiPrioN <br />REVISIONS <br />Digitally signed by Yan Wang <br />Date: 2022.03.01 21:06:31-05'00' <br />CITY CI..tr.� <br />/ tIFT <br />, <br />r <br />R. � 3. <br />. i <br />. <br />^ill NEW <br />'1 , <br />SCALE; N.T.S. <br />