Laserfiche WebLink
I V `A I L I I ROOF NAII INC- <br />--- <br />PER PLAN 2x6 OUTRIGGER ROOF NAILING--\ 2x BLKG W/ VENT HOLES <br />BLKG W/ VENT HOLES PER PLAN 2x6 BLKG A\ CLIP-----_ _ 4 -0 MAX _ _ROOF NAILING PER PLAN <br />- - ) �,� 2" DEEPER THAN TRUSS <br />AT 24" 0, C. 1 \ A T 6 0. C. I PER PLAN _- TOP CHORD <br />2 DEEPER THAN TRUSS ALIGN W 10d AT b ' 0. C, TO BA\� RAFT 1� / <br />� 3 2 CS16x4'-0" W/ <br />-4 0 MAX I _ N W/ (2)TRUSS BAY BACKSPAN EA SIDE OF BLKG A i �111 <br />TOP CHORD �` � SH\THING , � v <br />r T - I SHEAR TRUSS OFFSET OF WADI V (22)8d NAILS EA \ �� <br />ROOF SHEATHING AND\/ -��� DESIGN FOR 200 PLF� \ SHEAR TRUSS OVER WALL-­,(2)2" THRUM = I A34 PER PI AN ROOF SHEATHIN <br />- �� <br />3'--O" MAX OVERHAN <br />2x4 PLATE W/ 16d A T� <br />6" O.C. INTO TOP PLATE <br />JLTP4 PER SCHEDULE <br />r <br />(16" O.C. MAX) <br />NAILED INTO <br />TOP PLATE AND RIM <br />SHEARWALL SHEATHING <br />AND NAILING PER PLAN <br />ROOF SEC Ti ON <br />16d PER SCHFDUIF <br />(6" O.C. MAX <br />1%" LSL RI <br />NON-STRUCTURAL CHANNEI <br />PER ARCH WHERE OCCURS <br />CONNECT TO RIM W/ 2" O <br />THRU BOLT AT 48" O.C. MIN <br />r��LTP4 PER SCHEDULE <br />(16" 0. C. MAX' <br />NAILED INTC <br />TOP PLATE AND ft <br />FLOOR SECTION <br />SW SHEATHING AND <br />NAILING PER PLAN <br />NAMING PER PLAN V �j '%\ n DESI\ FOR 200 PLF BOLTS �' <br />-_� AXIAL LOAD <br />r <br />I <br />L_ AXIAL LOAD \ T - !' - <br />\� ` 1 MIN —A34 EA �� <br />LTP4 AT 24" O.C, 2 MAX OUTRIGGER X 16d AT �� <br />\x4 BLKG TO <br />SHEATHING I �/ D\\ STOP T ALANCE PER 2/S4 RECEIVE STRAP <br />W/ 8d AT 6" O.C. OR (3)16a' 2x4 LADDER - 6 O.C. PER ARCH ail PER' <br />\ X / NAILING <br />- ! ARCH 1 <br />SHEAR IRUSS FLUSH FRAMING 1 <br />W SHEATHING BELOW ( W A34 EAF--16d AT ,I BARGE RAFTER <br />/ / Z�i2 " i IIN / <br />' v �x, - 6 O. C: i r� P\ PLAN � <br />(DESIGN FOR 250 PLF) END A / T <br />_- �� %" KNIFE PLATE <br />_--L . 4-- a <br />TRUSS PER PER PLAN DROPPED- DROPPED TRUSS J A35 AT <br />6 �_ �, 4x4 BLKG TO RECEIVE <br />ENS \ 2.4" O.C. MAX 1 „ <br />GABLE END 1 SHEATHING NAILING 1� TYP <br />TRUSS 2x4 BRACE 9Y 2x BLKG BETWEEN <br />�H25 EA TRUSS OR A T 8'-0" 0. C. - / li „' r-� ��.-1 ,� <br />SDWC15600 INSTALLED SHEAR WALL MAX LADDER FRAMING SHEAR WALL— 3/2 STD PIPE BRAG - ,, --ram / KNIFE PLATE <br />LTP4 Al NOTCH EA END z T ' k <br />PER MFR SPECS. �-A34 EA, SIDE PER PLAN PER PLAN Q, z <br />24" 0, C. FOR KNIFE PLATE L-i <br />NAIL TO BRA\ I� �I <br />C <br />SCREW TO PLATE <br />1 F J <br />STUD PER PLAN W gx2„ %"0 THRU BOLTS 1 2" TYP PER <br />/ CENTER IN BRACE <br />OFFSET SHEAR TRUSS TYPICAL SHEAR TRUSS EA END ARCH <br />SCALE 3/4" = 1'-0" <br />PROVIDE 1%" LSL BLKG <br />AT 48" O.C. <br />AT PARA. CORD <br />OOR _ <br />LTP4 NOT REQUIREDI <br />IF BTM SHEATHING <br />LAPS RIM, 2" MIN <br />OR TOP SHEATHING <br />NAILED TO <br />TOP -TAT PLATE <br />ROOF SECTION <br />SCALE 3/4" <br />WALL WHERE-"16d PER SCHEDULE <br />- � <br />(6" O.C. MAX) <br />OCCURS <br />FI-OOR NAILING <br />1 2" LSL RIM PER PLAN <br />SUB LOOR A, <br />NOTE: <br />AT SIM SECTION, <br />STAIRWELL IN LIEU <br />OF FLOOR JOISTS <br />ON SHEATHING SIDE <br />AT PARA COND <br />FLOOR SECTION <br />A35 PER SCHEDULE <br />(16" O.C. MAX) <br />WHERE OCC <br />FLOAT NAILIN <br />PER PLA <br />1%" LSL R <br />STAIRWEL <br />16d TN-/ <br />AT 6" O.C. <br />SCALE 3/4" = 1'-0 S4 SCALE 3/4" = 1'-0" <br />-2x6 PT PLATE <br />W/ %"T A. BOLT PER SCHEDULE <br />W/ WASHER PER S1 <br />MASAP ANCHORS AT A. BOLT <br />(2) #4H AT TOP AND-" A T 18 0. C. SPACING ARE ACCEPTABLE <br />� ,� <br />SLAB WHERE A� SLAB PER PLAN <br />OCCURS <br />co 5 , <br />z <br />�r— <br />� <br />#4V AT 18" O.C. <br />i <br />FTC DRAIN — <br />AROUND <br />c -(2) #4 <br />U <br />PERIMETER n� <br />/--Ti FQU IDATION SEC TI Oil _ <br />1 <br />5„ <br />s -a:- <br />= <br />8' <br />�A <br />5„ <br />� 1'-6 <br />ENTER WALL/FTG <br />ROOF- SECTION <br />POST PER PLANG---- <br />W/ A34 CLIP TOP ��--(2)%"0 THRU BOLTS <br />EC �-I ON CEN\RFD IN POST <br />_ (���_�OOF <br />SCALE 3/4" = 1'-0" <br />WHERE <br />GUARDRAIL FLOOR N. <br />PER ARCH PER <br />FLOOR <br />STAIRWELL <br />RIM PER-/ 16d TN <br />PLAN AT 6" O.C. <br />T ILEVER JOIST--- <br />-IERE OCCURS <br />PER PLAN <br />AT STAIR BRG WALL <br />FLOOR SECTION <br />AT BRC WALL <br />SCALE 3/4" = 1'-0" <br />TER WALL/FAT <br />10d AT 6" O.C. NAL <br />FLOOR - LUS2E <br />- STAIR LANDING <br />2x8 LED <br />(2)%"Ox4i <br />SCREWS TO Ef <br />AND 16d AT <br />TO BLKG <br />FLOOR SECIO <br />2x WALL- INTERIOR SHEARWALL- v A35 W/ SD9 SCRENS- <br />RHO WHERE PER PLAN �-P7 2x6 PLATE ROOF NAILING <br />OCCURS PER PLAN SHOT PINS AT 16" O.C. ` W/ `/"T A, BOLT PER SCHEDULE PER PLAN <br />STOP INSULT S (48" O.C. MAX) <br />PT 2x PLATE STOP IN.�UL RIPPED 2x BLKG— <br />ATI ) <br />W/ WASHER PER S1 <br />FfG AT FLG (� W/ VENT HOLES I <br />-� FLOOR ,�_ A { FL00 A\ 16d TN AT 8" O.C. 1- <br />\ - T _- <br />�j '`; <br />\iA�.� <br />r ice,, <br />- <br />�/�\;\, i. /•ij/�jfj:rr,.`,�i,\;rrr�,; �. ff�i f�.�✓,f�\ <br />NOTCH RAFTER <br />�(3#4-- 1 �6 -(3)f4 <br />FTG MUST BEAR ON� n p Y FIG MUST BEAR ON �' � ABEAR ON BEAM <br />EP OX EMBED 4" cPO;�'Y EMBED 4'—A <br />NATIVE SOIL OR INTO STEM WALL NATIVE SOIJ- OR INLO STEM WALL <br />COMPACTED STRUCTURAL FILL BEYOND COMPACTED STRUCTURAL FILL BEYOND OVERHANG PER ARCH <br />2'-6" MAX <br />FOUNDATION SEC TI ON <br />\\,,,S 4 SCALE 3/4" = 1'-0"S/� / <br />ANCHOR DOLT SCHEDULE <br />PANEL NAILING LTD OF HOCK N No. KIND' <br />BOLT DIA EMBED <br />INTO EA HD STUD SHEAR WALL ANCHOR _ ST OS <br />5 �, 12 MIN AT STEM <br />E HDU5 o (2)2x6 USE PANEL ED <br />9" MIN AT FTG NAILING AT HD STU, <br />CRIPPLE STUDS- BOTH EI00� <br />AS REO'D <br />--KING STUDS AT <br />A307 ALL THREAD -- HOEDOWN PER SCHEDULE <br />DIA PER SCHEDULE <br />/ ,<3 SO WASHER HOLDOWN PER PLAN <br />V! „� „ � = <br />AND DBL NUT _ -/ LAG SCREWS PER MFR <br />PER SCHEDUI E <br />\�\\ o <br />aw <br />m <br />Q6 <br />ICON\ATE <br />STEM/FOOTING <br />R a <br />R6 DU AT FOOTINC - <br />SCALE- 3/4" = 1' O" <br />(2) 2x4 FLAT BLKG <br />IN FLOOR SPACE <br />Imo_ END OF - <br />SHEAR WALL <br />MST STRAP HOEDOWN <br />SCALE 3/4" = 1'-0" <br />)OWN! STUDS <br />IRS PER PLAN <br />SHEATHING <br />FI OOR <br />SCALE 3/4" = 1'0" <br />FO NUA TION SECTION <br />2x6 BLKG T/B HEADER TIGHT TO - <br />BEHIND STRAP ROUGH OPENING OR <br />PER TABLE PLATES SIMILAR TO <br />D TM1A Nb I r'71 A TFC` <br />SCALE 3/4" = 1'0" <br />2x BLKG <br />SCALE 3/4" - 1' 0" <br />SHEARWALL SHEATHING <br />AND NAILING PER PIAN <br />BEAM PER PLAN W/ 2x PLATE ROOF NAIL ING— <br />HIPPED TO FLANGE WIDTH AND PER PLAN. <br />a" T WTS AT 12" O.C. <br />A35 W/ SD9-- <br />SCREWS TO <br />RAFTER PER PLAN- LEDGER <br />SLOPE PER ARCH <br />2x8 LEDGER W/- <br />(2) %"ox3s" SDS LAGS <br />AT 24" O.C. <br />AND 16d AT 6" O.C, INTO BLKG <br />LOW ROOF SECTION <br />SCALE 3/4" = 1'-0 S� SCALE 3/4" <br />COIL STRAP PER PLAN 1 -0 SQ --%" BASE --� COL/PLNITII <br />TOP AND BTM WINDOW fi -� � PLATE ) <br />LOCATE 11z" FROM ROUGH - \ /-POST PER PLAN <br />- <br />I � I <br />OPENING STRAP <br />STRAP MIN END NAILING BLKG SILL <br />LENGTH EA END PLATE <br />CS16 14" (11) 10d (o2x (2)2x <br />CMSTC16 25" (\) 16d (2)2x (3)2x <br />CMS [14 _ 30" (33) 16d (22x (3)2x <br />-- <br />--I-- <br />!I -FURRED OUT PLINTH <br />L� 1�� DIMENSION PER ARCH <br />1" NON -SHRINK —I' ALL WOOD AND SHEATHING <br />GROUT ICI TO BE PT AND ALL NAILS <br />�(4) %"0 A. BOLTS W/ TO BE HOT DIP GALVANIZED <br />DBL NUT AND %"x3"x3" l I 1'-6" SO PLINTH <br />PLATE WASHERS 1%" C\_ I j�� 1 PL -CONC PORCH <br />EMBED 9" INTO PLINTH ,,- \ATE OCCURS <br />END LENGTH <br />PER TABLE _ BASE PLATE PLAIN <br />-BARGE RAf' TER � Ay, - ' <br />PER PLAN \ AND NAILING <br />PER PLAN <br />L=3'-0,, <br />MAX OVERHANG I, 4'-0 <br />2x4 PLATE W/ 16d AT-----,, PER PLAN <br />6" O.C. INTO TOP PLATE \� 2x OUTRI\ER <br />L TRUSS TOP CORD EXTEND <br />[--�ILTP4 PER SCHEDULE.-� y �� TO BARGE RAFTER <br />(16" O,C. MAX) �� A <br />NAILED INTO \-TRUSS PER PLAN <br />TOP PLATE AND RIM H2.5 EA TRUSS OR <br />SDWC1.5600 INSTALLED <br />PER MFR SPECS. <br />SHEARWALL SHEATHING --� STUD PER PLAN <br />AND NAILING PER PLAN <br />'00F SE( TION <br />SCALE 3/4" 1'-0" <br />A SIDE BEAN! <br />2" BR( <br />MA TCH <br />WID <br />STEEL BEAM TO POST DETAIL <br />)OR/ROOF <br />�MING PER PI AN <br />SINGLE T <br />SILL U.N <br />ATE STUL <br />HDR <br />IGID INSL <br />HEADER <br />SILL <br />SECTION <br />19_099 <br />SCALE 3/4" = 1'-0" <br />OOR <br />�00 <br />5 CRIPPLE STUDS <br />16" D.C. <br />R PER PLAT <br />NGLE KING STUD FOR HDR SPANS <br />SS THAN OR EQUAL TO 6'-0" <br />3L KING STUDS FOR HDR SPANS <br />SS THAN OR EQUAL TO 10'-0" <br />/(6)16d INTO HDR <br />). OF TRIMMERS <br />-R PLAN <br />U. N. 0. <br />CIE BTM SILL <br />0. <br />TYPICAL HEADER DETAIL <br />STAIR STRINGER SCHEDULE � <br />STRINGER SPACING <br />MAXIMUM RUN <br />2x12 DF#2 AT 12" O.C. <br />7' <br />2x12 DF#2 AT 16" O.C. <br />W1 2x6 DBLR <br />1 4x11%8 LVL AT 12" O.0 <br />8.5' <br />9' <br />�14x"I1�/BLVL ATI6"O.C. <br />W/ 2x6 DBLR <br />10.5' <br />1%x14 LVL AT 16" O.C. <br />1%'x14 LVL AT 16 O.C. <br />WI 2x8 DBLR <br />11' <br />— <br />14' <br />j <br />STAIR-\ <br />-- - Tf xl; �� ;�`' � %R '%� �'\ 9" FMB\ STRING\ <br />PANEL EN INTO (4) #4V W/ 90 ���°A'�< PER SCHEDULE <br />FULL LENGTH KING HOOKS INTO FTG !� o �- 2x4 THRUST BLOCK <br />FUR �A SIDE �v (3) #4 TIES AT TOP <br />o AND AT 12" O.C. �W/ (2)%"O E;TP. ANCHOR <br />OPENING _ y A OR (2)16d AT 6" O.C. NOTCH STRINGER <br />1- � <br />C --- A T WOOD ELVER FOR HAT <br />— : r— >r— < <br />ATM SILL PLAT' �� ,,,ram;/r..�.,,; ���,. /i• A _ 2x DBLR W/ (2)16d <br />x REINFORCEMENT AT 6" 0 C <br />P\ TABI E I <br />BEAM PER PLAN <br />JIN 12" DEPTH (NOM.) <br />FLO <br />SHEA THI, <br />OPENING IN SHEARI�JALL DETAIL <br />SCALE 3/4 = 1'-0" <br />R\\. PER SCHED. WHERE NEC. <br />FOUNDATION S�CTION 20 TYPIC'AL STAIR DETAIL <br />SCALE 3/4" = 1'-0" S <br />SCALE 1/2" = 1'-0" <br />A34 <br />NOTCH STRINGER <br />AT BEAM <br />2x BLKG W/ <br />-16d AT 6" O.C. <br />_ LANDING <br />OR E LOOR <br />R <br />LUS26HGR <br />I ANDIPJG <br />1R FLOOR <br />EANI PER PLAN <br />IN DEPTH 12"(NOM,) <br />SCALE 1/2" = 1'-0" <br />