My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE 2018 INTERWEST CONSTRUCTION INC Plans 2023-02-28 (2)
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
Plans
>
2320 RAILWAY AVE 2018 INTERWEST CONSTRUCTION INC Plans 2023-02-28 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 3:45:58 PM
Creation date
2/23/2023 2:48:18 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Permit
PW1809-013
Year
2018
Notes
CONSTRUCTION OF RAILWAY AVE ROAD AND UTILITY IMPROVEMENTS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■A A'r^"l 1kI1-_! C►CC <br />1 30 <br />125 <br />120 <br />115 <br />110 <br />. 5 <br />° 6+80 7+00 7+20 7+40 <br />CONSTRUCTION CENTERLINE <br />7+60 7+80 8+00 8+20 8+40 8+60 8+80 9+00 9+20 9+40 9+60 9+80 <br />GRADING AND DRAINAGE PROFILE <br />SCALE:1"=20' <br />10+00 10+20 10+40 10+60 10+80 11 +00 11 +20 <br />30 <br />491 <br />co <br />11+40 11+60 11+80 12+60 <br />HORIZONTAL SCALE: 1 "=20' <br />20 0 20 40 <br />5 0 5 10 <br />VERTICAL SCALE: 1 "=5' <br />LEGEND <br />PROPOSED FEATURES- <br />HMA PAVEMENT <br />6" MIN. DEPTH CONCRETE PAVEMENT <br />4" MIN. DEPTH CONCRETE PAVEMENT <br />SD <br />STORM DRAIN PIPE <br />- — — - — -- <br />GRADE BREAK <br />LIMIT OF GRADING <br />15— <br />MAJOR CONTOUR <br />14 <br />MINOR CONTOUR <br />TYPE 1 CATCH BASIN <br />TYPE 2 CATCH BASIN <br />FILTERRA <br />TC <br />TOP OF CURB <br />BC <br />BOTTOM OF CURB <br />TP <br />TOP OF PAVEMENT. <br />EP <br />EDGE OF PAVEMENT <br />m <br />w <br />w <br />w <br />Cs <br />U <br />r; <br />a: <br />0 <br />w <br />V) <br />v> <br />o <br />(A <br />m <br />O <br />N <br />C) <br />00 <br />0 <br />o- <br />� <br />cn <br />°0 <br />-� <br />o <br />> <br />Z <br />Y <br />N <br />Y <br />00 <br />Q <br />N <br />C) <br />J <br />w <br />o <br />z <br />w <br />w <br />o <br />a <br />< o <br />o <br />v <br />a <br />V) <br />\ <br />cq <br />� dty <br />� ' ®4o� <br />a <br />GENERAL NOTES <br />Z <br />c <br />V�Q <br />1. <br />SEE SHEET CO.1 FOR PROJECT NOTES RELATED TO GRADING <br />J <br />Z <br />> <br />AND DRAINAGE. <br />0 <br />2. <br />SPOT ELEVATIONS ARE AT EDGE OF PAVEMENT, BOTTOM OF <br />T� <br />■ <br />Q <br />�q <br />d <br />CURB, OR FLOWLINE UNLESS OTHERWISE NOTED. <br />i <br />" <br />a, <br />3. <br />ALL CATCH BASINS SHALL BE PRE -CAST CONCRETE AND <br />li <br />9 <br />— <br />— <br />1' <br />- <br />s <br />W <br />SHALL CONFORM TO THE APPLICABLE SPECIFICATIONS ON <br />SHEET C0.1 AND INSTALLED PER DETAILS C1 /C3.6 AND <br />W <br />B1 /C3.7. <br />z4. <br />STORM DRAIN PIPE TRENCH EXCAVATION AND BACKFILL PER <br />a <br />DETAIL A2/C3.6. <br />■ <br />s <br />J <br />W <br />5. <br />INSTALL FRAME AND BEEHIVE GRATE PER DETAILS B3/C3.7 <br />; <br />5;I <br />z <br />AND D1/C3.7. <br />� <br />V <br />c <br />_ <br />6. <br />INSTALL FRAME AND SOLID COVER PER DETAIL D3/C3.7. <br />Uj <br />a <br />7. <br />ALL FILTERRA UNITS SHALL BE FILTERRA INTERNAL BYPASS <br />CURB WITH CHAMBER (FTIBC-C) PER DETAILS C3/C3.6 AND <br />B3/C3.8. SIZE NOTED ON PLAN. CARE SHALL BE TAKEN TO <br />ENSURE ALIGNMENT OF THE INLET OPENING WITH THE <br />FLOWLINE. <br />8. <br />PROVIDE INLET PROTECTION AT FILTERRA CURB INLETS UNTIL <br />STREET, CURB/GUTTER, AND SIDEWALKS ARE PAVED. <br />O <br />0 <br />M <br />ULTRATECH 9320, ULTRA GUTTER GUARD, 9" DIA X 8' L. <br />U <br />0 <br />9. <br />ADJUST FRAMES OF EXISTING UTILITY COVERS AS NECESSARY <br />co <br />Z <br />> <br />TO MATCH THE FINISH GRADE. <br />O <br />10. <br />TEMPORARY CONSTRUCTION EASEMENT REQUIRED PRIOR TO <br />m <br />., <br />0 <br />r j <br />CONSTRUCTION ON CITY OF EVERETT PROPERTY. COORDINATE <br />U <br />z <br />r. <br />WITH CITY OF EVERETT REAL PROPERTY DIVISION. <br />W <br />= <br />J <br />0 <br />0 <br />en <br />0 <br />Z <br />-1 <br />Q <br />H <br />co <br />M <br />M <br />0 <br />N <br />o Z to w Z <br />O m <br />w <br />Of U <br />a <br />w <br />w <br />a <br />Z <br />W Q <br />J <br />� a <br />w w <br />O � <br />0 <br />(L � <br />m L 9 <br />=W <br />W W Z J <br />Q Z LL. <br />00 <br />Q0 ZaFo <br />JW W� <br />a j �� C'3Q <br />SHEET NO. <br />C3.1 <br />GaII 811 PROJECT N0. <br />• ® two business days 17754 <br />before you dig <br />
The URL can be used to link to this page
Your browser does not support the video tag.