Laserfiche WebLink
1,�a� �i ` � � { rl t ;' t l �i.. � t t � •`... 4 •1��' �� k`,e ,t � i /'� \ , Sy �` 1 �.. \ \. � � <br />35, WIDE R.O.W. DEDICATION <br />LEGEND <br />PROPOSED FEATURES- <br />;`' tl i i P It r \ y MATCH LIN -SEE SHEET C .1 \ y \ I W DOMESTIC WATER SERVICE, SEE 01, 02 & 03/C3.2 <br />N <br />SANITARY SEWER PIPE, SEE 01, 02 & 03/C3.2 <br />Iim7 <br />y <br />ill �1 4n 'I 111 t I 1 SS PROVIDE 3' MINIMUM COVER <br />91 <br />'t1�KEYNOTES NOTES Y SEWER FORCE MAIN SSFM SANITARY C3.3 <br />, \ 162LF R SEE 03 / <br />„ <br />20 SCH. 80 PVC, LENGTH PER PLAN \ I I s - - <br />� t 4 \ } � � � � 1`' �., - BP -BURIED POWER AND COMMUNICATIONS,SEE 05/C3.3 <br />(1) 2" SCH. 80 PVC 90° ELBOW \ s{ I 13 \ y �, >. • SANITARY SEWER CLEANOUT, SEE 04/C3.2 & 02/C3.3 <br />Ott 3 (1) 2"x2" SCH. 80 PVC TEE ` SANITARY SEWER FORCEMAIN BACKFLOW AND PLUG <br />7 F 1 \ \ y i \ N FLOW ASSEMBLY & VAULT, SEE 01 /C3.3 <br />i (1) 2" SCH. 80 PVC 22.5' ELBOW f \, <br />l'1 ' \, \ `� ■ ELECTRICAL HANDHOLE <br />SANITARY SEWER PUMP STATION PER 04/C3.3 <br />SANITARY SEWER PUMP STATION PER DETAIL 04/C3.3 <br />i <br />1;1�1 6 SANITARY SEWER PUMP STATION PANEL MOUNTED ON POST <br />CAP SANITARY SEWER FOR FUTURE CONNECTION \\ 1 1 y\ \ \ I <br />�! CONNECT SANITARY SEWER AT EXISTING STUB <br />t 't 9 CONNECT WATER TO 2" METER INSTALLED WITH RAILWAY AVENUE <br />I � <br />IMPROVEMENTS PROJECT \ 13 <br />,i 10 DOMESTIC WATER 2" RPBA AND HOTBOX PER DETAIL 06/C3.3 <br />i t 11 1.25 0 SCH. 80 PVC, LENGTH PER PLAN I / <br />t� It; 12 SANITARY SEWER FORCEMAIN BACKFLOW AND PLUG { \ SAD <br />1 <br />FLOW ASSEMBLY & VAULT, SEE 01 /C3.3 \ y \ <br />SID <br />It 13 (1) 2" SCH. 80 PVC 45' ELBOW II ? \ S° \ <br />tl 14 YARD HYDRANT PER OWNER'S SPECIFICATION. <br />i sa �\ GENERAL NOTES <br />l is ttr i SANITARY SEWER NOTES ;' SD! o \ \ <br />1, S° ;. 74LF \ 1. SEE SHEET C0.1 FOR PROJECT NOTES RELATED TO UTILITIES. <br />41 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE CITY OF EVERETT w! <br />STANDARDS AND WSDOT/APWA STANDARD SPECIFICATIONS. I S° \ 13 <br />2. NO PART OF THE SANITARY SEWER SYSTEM SHALL BE COVERED, S° S° \\ wI ! <br />1 t t CONCEALED OR PUT INTO USE UNTIL IT HAS BEEN TESTED, INSPECTED, I \ <br />1 AND APPROVED BY THE CITY INSPECTOR. SD i \ �� SD 13 \ ! <br />SD <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED ' �' SD I \ FROM AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE. THE h r T - - - --� - - - -c3-- - - - SD / . ✓ f <br />CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS <br />1 t 1 AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES NOT SHOWN. IF <br />CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE <br />�, �. CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY N I \ \ ! y <br />CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR f s y y \ \ <br />\ o I y <br />TO COMMENCEMENT. OF RELATED. CONSTRUCTION ON THE PROJECT. <br />i, ; <br />4. ALL SEWER MAIN EXTENSIONS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN <br />EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO \ \ \ <br />1 } STARTING CONSTRUCTION. \ I I \ y <br />WATER SYSTEM NOTES <br />1. POTABLE WATER MAINS SHALL MAINTAIN A MINIMUM OF 10 5. A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE <br />1 FEET HORIZONTAL CLEARANCE AND 18 INCHES VERTICAL CITY PRIOR TO THE START OF CONSTRUCTION. THE CITY OF I i <br />1 SEPARATION ABOVE NON -POTABLE UTILITIES (INCLUDING EVERETT PUBLIC WORKS CONSTRUCTION DIVISION MUST BE <br />j SEWER, STORM DRAINAGE AND IRRIGATION) WHENEVER NOTIFIED AT LEAST 24 HOURS PRIOR TO COMMENCEMENT OF <br />I ! POSSIBLE. IF SITE CONDITIONS DO NOT ALLOW SUCH CONSTRUCTION 22 <br />MINIMUM SEPARATIONS, PIPELINE MAY BE LOCATED CLOSER <br />t TO EACH OTHER PROVIDED ADDITIONAL PRECAUTIONS ARE 6. THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT <br />IDENTIFIED AND INSTITUTED TO ASSURE PROTEC11ON OF THE SHALL NOTIFY THE PUBLIC WORKS DEPARTMENT OF A <br />POTABLE LINE. NO OTHER UTILITIES, POTABLE OR PERSON WHO CAN BE CONTACTED REGARDING PROBLEMS <br />NON -POTABLE, SHALL BE WITHIN 5 FEET HORIZONTAL AND DURING CONSTRUCTION ON A 24 HOUR BASIS: <br />12 INCHES VERTICAL FROM THE WATER MAIN. <br />7. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 <br />2. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED INCHES VERTICAL SEPARATION BETWEEN POTABLE AND <br />EXCEPT BY MEANS OF AN APPROVED BACKFLOW NON -POTABLE CONVEYANCE SYSTEMS. ( 21 <br />PREVENTION DEVICE PRIOR TO SATISFACTORY FLUSHING, <br />TESTING, DISINFECTION, AND RECEIPT OF SATISFACTORY 8. ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY t' \ It � � � 254LF 1 <br />BACTERIOLOGICAL TEST RESULTS. PUBLIC WORKS DEPARTMENT PERSONNEL ONLY. ALL VALVES, <br />NEW AND EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES. <br />3. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE <br />MADE BY THE PUBLIC WORKS DEPARTMENT AT THE 9. PROVIDE 4 FOOT MIN. COVER OVER PIPING. \ I ! \\ y <br />DEVELOPER'S EXPENSE. THE PUBLIC WORKS DEPARTMENT <br />SHALL THEREAFTER DETERMINE THE DATE AND AT WHICH <br />THE CONNECTION SHALL BE MADE. <br />\ o� 9 <br />4. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF \ �`� \ OLF <br />EVERETT STANDARDS. r \ i <br />I" F tt ; t 20 t'� \ �' 4LF-6" PVC SDR35 @ 6.02% <br />I 1 t r 4i It - - - - - - - - - 42L------- 137LF------------ 19 _ <br />t I i 2 1 3 J SSCO 04 P 117LF-6" PVC SDR35 6.02% y 10 <br />♦ \ <br />IE=16.12 I •1c1 3 \ \ \ \ \ <br />1 1 1 1 In 1 I 1 1 / COORDINATE WH :EL W W W W w\ \ \ <br />WASH DRAIN TH <br />MANUFACTURER 3 20LF 1 SD I 29LF ! <br />�� 27LF 1 6 7 4 5\� .\y \y 53LF-6" PVC SDR35 @ 2.00% <br />�1 1t ie G1 - I <br />j \ \ \ COORDINATE INSTALLATION <br />4� I WITH RAILWAY AVENUE <br />19 I 14 SS SS S \ ! 'y \ IMPROVEMENTS <br />43LF-6 PVC SDR35 ® 1.81% S( S� ° t y <br />PUMP S1ATNIV�3� y <br />RIM=18.27 1 on \ <br />I <br />SD 203 F-6 PVC SDR35 ®1.81 % ! <br />t \ I I SSCO Ol <br />s i I 15 - _ I IE=13.45 -- SS 19 S SS SS --7- SS 1 ch IE=9.51 6" _SW (JN) f y <br />f "" i 5LF-f� PVC SDR35 C�,1.81% I I� N IE=9.51 6 ,IW"(IN) <br />\ ` I f SSCO 02 SSCO 03 I� IE=14.12 1.25 S (OUT) \ \ <br />i r t u IE=13.37 <br />= t 1 \ <br />92LF-6" PVC SDR35 ® 6.16% t 495E 11 I I 60L SSCO 0 ♦A V <br />t`�j 1�1 11 I y I j {�7 I I ! I IE=7.81 \ \ <br />FOUND 5 8" REBAR & CAP, =" SPUR SSFM 1 SSFM SSFM SSFM SSFM --� ",i SSFM --1--- SSFM SSFM SSFM SS SSFM SSFM SSFM SSF 2 <br />/ ; • � R D Tr �08 '12 /1910 r: i l s � <br />L.S.#32441, OA N. & W. OF I I I `i 12 / _ <br />'�1' 10 il�IT} - � fi ti�c3y - �'� ---a <br />ED <br />CALC. POSITION.% ; ` I ��-v> _ �_ ram,-------j --p -38-------------I--- - ��- _ <br />_ _ _ <br />$---__.-- -- --s_-------- - 1 t �=f� <br />- - _. - -_ - - - _ - - -i-" _... P _ � .-_ m � � 1_ �. _._ _ _ .- _. .�� _._e __ . o __ _.._ - � ':?�� . __ _ ._ _ _ • � ._. __ _ . ,,ray <br />i} } 1 1 ` -` ^�_ "- _--- �_ .._._ �- � ✓9-4_... _.®._ -m-.., � _._... .......- ,.�.n �_... ,�._ .-r .�. .._.._... _.,.__ ......._. _ i y- <br />BLO <br />S89°20 06 E-818.57 - - - =- - _= = - OF <br />__ -- _ -- _= _- --_- _.- <br />S89°20'06 E-818.5T- HIB <br />®� _ <br />I `' 7 ,{ 11 s I . t_ t " I GUYPOLE Ik r e- s - _ ®- - g - --- - - -- - {_� 9'2 ._._..�_ - <br />{ 30.1; s tcn I x � � `----_------------------__-- _ <br />i _ <br />1d I 'tr I t Irj�>-__ i cad' =------------------- -------------- ----- ---- ----- -- <br />t f / j'ffi� s/ <br />tp" <br />i <br />1 1 It It I i s'> i I I x�� ��r' y .> - - ® _ - _ - _ - y i x il_ - i \ �\ <br />�.� i <br />z ' C"� ` Q , X \�J _ it _7 p <br />20UTILITY �11,i Its I i ! 'I 1� I ' x� j /o - /,Q ! <br />!= AC�f A�nIT D� f{ alit Il,n t z I ,�i �:i� h� •' i j t . -0HP- _ � f�`I - _ d !/ a\ A <br />SITE UTILITY PLAN NORTH <br />SCALE:1"=30' HORIZONTAL SCALE: 1"=30' <br />30 0 30 60 <br />mew <br />CITY OF EVERETT <br />REVIEWED FOR PERMIT <br />rn <br />z <br />0 <br />Ln <br />W <br />x <br />W <br />0 <br />cn <br />I <br />W <br />Of <br />0 <br />rn <br />N <br />NO <br />0 <br />m <br />w <br />0- <br />Of <br />0 <br />Lid <br />V) <br />L <br />0 <br />0 <br />m <br />0 <br />o <br />_ <br />0 <br />N <br />Z <br />o <br />J <br />7 <br />0 <br />W <br />LLj <br />0z <br />3 <br />U <br />w <br />Lij <br />a <br />a. <br />a <br />O <br />U <br />0 <br />VU <br />■ <br />t9 <br />� <br />� <br />W <br />E <br />_z <br />U) <br />m <br />O <br />N <br />V <br />L <br />d <br />I.i. <br />as <br />W <br />D <br />IF- <br />L) <br />Mw <br />Zw <br />� <br />� <br />M <br />it <br />f- <br />1a <br />3 <br />_ <br />■ <br />_J <br />F <br />W <br />a <br />_ <br />m <br />o <br />w <br />> <br />u <br />w <br />Z <br />o <br />co <br />= <br />CL <br />a <br />w <br />a <br />0- <br />I- <br />W <br />Z <br />0 <br />Z <br />(j <br />cj) <br />Z <br />Q <br />Ld <br />m <br />J <br />= <br />oNo <br />O) <br />_ <br />Z <br />z <br />= <br />o <br />w <br />F_ <br />Q <br />0 <br />0 <br />0 <br />co <br />� <br />o <br />0 <br />(, <br />m <br />U <br />w <br />Q <br />a <br />W <br />a <br />0 <br />U <br />9 <br />3 <br />C0 <br />F <br />w <br />0 Z <br />V W <br />cr <br />j <br />H W <br />W>w <br />w <br />Z <br />WExw <br />> CL <br />Q <br />J <br />CL <br />uj <br />LLJ <br />U/ <br />Q <br />J <br />U G <br />Lg LW � <br />a ~ Q <br />O <br />p <br />N <br />t= <br />W W <br />Z >­ <br />04 <br />1 co <br />SHEET 10. <br />C3,0 <br />PROJECT NO. <br />18,,831 <br />