POLLUTION PREVENTION NOTES (BMP C151, g <br />C16?) <br />DEWATERING NOTES <br />DEMOLITION NOTES <br />EROSION CONTROL SEEDING (BMP C120 <br />1. <br />EQUIPMENT LUBRICATION AND FUELING OPERATIONS SHALL OCCUR AT EXISTING <br />1. COORDINATE ENTRY, SECURITY, TRAFFIC CONTROL PLAN, AND OTHER REQUIREMENTS <br />1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING ALL EXCAVATIONS. ALL <br />1. <br />REMOVE ALL DELETERIOUS MATERIAL FOUND ON -SITE INCLUDING VEGETATION, SCRAP <br />1. <br />SEE SEEDING NOTES ON L1.2. <br />PAVED AREAS. <br />WITH OWNER PRIOR TO BEGINNING WORK. <br />WATER GENERATED FROM DEWATERING OPERATIONS SHALL BE DISPOSED OF IN <br />WOOD, TRASH, ETC. AND DISPOSE OF AT AN APPROVED OFF -SITE LOCATION. <br />MANNER AND LOCATION APPROVED BY THE CITY OF EVERETT. CONTRACTOR SHALL <br />2, <br />PREVENT OILS AND FUELS FROM ENTERING THE STORM DRAINAGE SYSTEM WITH <br />2. POST SIGN WITH NAME AND PHONE NUMBER OF SUPERVISOR (MAY BE <br />PREPARE AND SUBMIT A DEWATERING PLAN PRIOR TO COMMENCING CONSTRUCTION. <br />2, <br />AT ALL TIMES THE CONTRACTOR SHALL MAINTAIN SIGNS, BARRICADES, FENCING, OR <br />STANDARD <br />EROSION CONTROL NOTES CITY OF EVERETT <br />PROPER CONTAINMENT DEVICES. <br />CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN). <br />OTHER MEASURES TO ENSURE CONTINUOUS PROTECTION OF THE PUBLIC AND TO <br />2. CONTRACTOR TO ANTICIPATE GROUNDWATER WITHIN 52 -7 FEET OF SURFACE AND <br />PREVENT UNAUTHORIZED ENTRY TO THE CONSTRUCTION AREA. AT A MINIMUM FENCING <br />1. <br />APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN <br />3. <br />ACCESS TO CONSTRUCTION IS VIA ADJACENT EXISTING PAVED STREETS. SWEEP <br />3, CONTRACTOR TO COORDINATE WITH OWNER FOR PHASING OF PROJECT TO MEET <br />PROVIDE ALL EQUIPMENT NECESSARY TO DE -WATER EXCAVATIONS. COORDINATE <br />SHALL BE 6.0 FEET HIGH. COORDINATE SAFETY AND SECURITY MEASURES WITH <br />APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, <br />DIRT FROM PAVING DAILY OR AS NEEDED. THE INTENT IS TO PREVENT DIRT AND <br />OWNERS OPERATIONAL REQUIREMENTS. IT IS ASSUMED THAT EACH PORTION OF <br />DISCHARGE WITH OWNER IN TRAFFIC AREAS AND NEAR OPERATIONAL FACILITIES <br />ADJACENT WORK . <br />PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES ) . <br />DEBRIS FROM VEHICLES AND EQUIPMENT FROM BEING DEPOSITED ON CITY STREET <br />THE PROJECT WILL BE COMPLETED IN SERIES, WITH ONLY ONE ACTIVE WORK AREA <br />(I.E. SURFACE PIPING IS NOT ACCEPTABLE WITHOUT APPROPRIATE, APPROVED <br />PAVEMENT. <br />AT ANY GIVEN TIME. THE BELOW SEQUENCE DESCRIBES THE GENERAL <br />TRAFFIC CONTROL MEASURES). SEE GEOTECH REPORT CONCERNING .GROUNDWATER <br />3. <br />DAMAGE TO ANY PROPERTY, INCLUDING BUT NOT LIMITED TO, BUILDINGS, UTILITIES, <br />2. <br />THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />CONSTRUCTION SEQUENCE THAT WOULD OCCUR FOR EACH WORK AREA. <br />LEVELS ENCOUNTERED. <br />VEHICLES, FENCING, OR LANDSCAPING AS A RESULT OF CONTRACTORS ACTIVITIES WILL <br />REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE <br />4. <br />THE CONTRACTOR SHALL PREVENT ALL MATERIAL USED OR GENERATED ON -SITE <br />BE REPAIRED OR REPLACED AT THE CONTRACTORS EXPENSE. <br />APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND <br />FROM ENTERING THE STORM DRAINAGE SYSTEM, THE CONTRACTOR IS <br />RESPONSIBLE FOR PROVIDING ADEQUATE CONTAINMENT/SEPARATION AT ALL <br />3.1. MARK CLEARING LIMITS. INSTALL FENCING AT WORK AREA. INSTALL EROSION <br />3. ALL GROUNDWATER OR INCIDENTAL SURFACE RUNOFF COLLECTED SHALL BE <br />4. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING <br />VEGETATION/LANDSCAPING IS ESTABLISHED. <br />TIMES. <br />CONTROL DEVICES. INSTALL TRAFFIC CONTROL DEVICES. <br />DISCHARGED TO THE ON -SITE STORMWATER SYSTEM FOLLOWING APPROPRIATE <br />SURVEY MONUMENTS AND OTHER SURVEY MARKERS DURING CONSTRUCTION, ALL SUCH <br />TREATMENT OR TO THE: SANITARY SEWER SYSTEM (PER CITY OF EVERETT <br />MONUMENTS OR MARKERS DESTROYED DURING CONSTRUCTION SHALL BE REPLACED AT <br />3. <br />THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED <br />5. <br />CONFORM TO BMP C151, C153, C154 REQUIREMENTS. <br />3.2. REMOVE FEATURES AS SHOWN. ON REMOVAL PLANS. <br />DISCHARGE AUTHORIZATION) UNTIL CONSTRUCTION IS COMPLETE, <br />THE CONTRACTOR'S EXPENSE TO ORIGINAL LOCATION AND ELEVATION. <br />IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE <br />BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE <br />3.3. CLEAN SURFACE OF PAVEMENT ADJACENT TO WORK AREA. <br />4. NO SEDIMENT, TURBID WATER, OR OTHER POLLUTANTS (HEAVY METALS, OIL SHEEN, <br />5. <br />THE CONTRACTOR IS FINANCIALLY RESPONSIBLE FOR THE MAINTENANCE OR REPAIR OF <br />MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br />INSPECTION, MONITORING, DOCUMENTATION AND <br />ETC.) SHALL BE DISCHARGED TO THE ON -SITE STORMWATER SYSTEM. ANY <br />OFF -SITE AND ON -SITE PAVED SURFACES WHERE DAMAGE HAS BEEN SUSTAINED <br />REPORTING SCHEDULE (BMP 150162) <br />3.4. REMOVE EXISTING UTILITIES DESIGNATED FOR REMOVAL <br />TREATMENT OF COLLECTED WATER SHALL BE APPROVED BY CITY OF EVERETT. <br />BECAUSE OF CONSTRUCTION TRAFFIC. <br />4. <br />THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL <br />CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT <br />g <br />3.5. PERFORM EARTHWORK ACTIVITIES, <br />5. ANY DISCHARGE TO THE SANITARY SEWER SYSTEM WILL REQUIRE PRIOR <br />6. <br />ALL CONCRETE, PAVEMENT, CURBS, SIDEWALKS AND RAMPS INDICATED TO BE <br />AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE <br />1. <br />EROSION AND SEDIMENT CONTROL (ESC) FACILITIES SHALL NOT BE ALLOWED TO <br />3.6. INSTALL NEW UTILITIES, <br />COORDINATION WITH CITY OF EVERETT TO ESTABLISH SAMPLING PROTOCOL, <br />REMOVED OR REPLACED SHALL BE REMOVED TO THE NEAREST JOINT AS IDENTIFIED <br />APPLICABLE WATER QUALITY STANDARDS. <br />FALL INTO DISREPAIR. THE PROPONENT OR DESIGNATED ESC LEAD SHALL INSPECT <br />DISCHARGE VOLUMES, AND NOTIFICATION TO THE CITY. <br />DURING CONSTRUCTIONWHERE THIS IS NOT POSSIBLE DUE TO CONFLICTS OR <br />. <br />5. <br />THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED <br />ALL PROJECT FACILITIES IN ACCORDANCE WITH CITY OF EVERETT CONSTRUCTION <br />STORMWATER POLLUTION REQUIREMENTS. <br />3.7. PREPARE FINISH SUBGRADE. <br />6. A LOG OF ALL DISCHARGED STORMWATER SHALL BE KEPT ON -SITE AT ALL TIMES <br />ADJACENT DAMAGED CONCRETE / ASPHALT, THE CONTRACTOR SHALL MAKE A FULL <br />PAVEMENT DEPTH SAWCUT AT THE PROPOSED JOINT IN SOUND PAVEMENT. PROPOSED <br />SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE <br />3.6. INSTALL NEW PAVEMENT, AND PAVEMENT MARKINGS. <br />DURING CONSTRUCTION. AT A MINIMUM, THE LOG SHALL CONTAIN THE FOLLOWING <br />CONCRETE / ASPHALT SHALL EXTEND TO THE SAWCUT EDGE AND BE APPROPRIATELY <br />UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND <br />SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />2. <br />THE ESC LEAD SHALL IMPLEMENT THE ESC PLAN. IMPLEMENTATION SHALL <br />ITEMS: <br />JOINED / SEALED. <br />INCLUDE BUT IS NOT LIMITED TO: INSTALLING, MAINTAINING, INSPECTING <br />MONITORING, DOCUMENTING, REPORTING AND REPAIRING ALL TEMPORARY EROSION <br />3.9. REMOVE FENCING, TRAFFIC CONTROL, AND EROSION CONTROL DEVICES. <br />@ DATE DISCHARGED <br />® SOURCE OF WATER (VAULT, PIPE, ETC.) <br />6. <br />THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE <br />AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES INCLUDED IN THE PLAN <br />o TYPE OF WATER DISCHARGED (GROUNDWATER, STORMWATER, ETC.) <br />p } <br />BMP <br />APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTION, ESPECIALLY AFTER STORM <br />SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY FIVE <br />4. THROUGHOUT EACH PHASE OF CONSTRUCTION <br />9 METHOD OF COLLECTION (PUMP TO TANK, ETC.) <br />g 9 <br />EVENTS. <br />WORKING DAYS, EACH WORKING DAY DURING A RUNOFF PRODUCING RAIN EVENT, <br />AND WITHIN 24 HOURS AFTER A RUNOFF PRODUCING RAIN EVENT. ALL PROJECT <br />TAN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF <br />4.1 MAINTAIN <br />® METHOD OF DISCHARGE DRAIN FROM TANK, PUMPED DISCHARGE, ETC.) <br />( <br />1, <br />STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER APPROVED <br />7. <br />THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF <br />CONSTRUCTION STORMWATER DISCHARGES SHALL COMPLY WITH CITY OF EVERETTEVERETT <br />STANDARDS AND MANUFACTURER'S RECOMMENDATIONS. <br />® VOLUME OF WATER DISCHARGED <br />DEVICE) DAILY BETWEEN NOVEMBER 1 AND MARCH 31. <br />ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. <br />DISCHARGE REQUIREMENTS: <br />4.2. RELOCATE EROSION CONTROL MEASURES, OR INSTALL NEW MEASURES SO <br />® DISCHARGE .LOCATION <br />® RECEIVING SYSTEM (ON -SITE STORM SYSTEM, SEWER, OFF -SITE FACILITY, ETC.) <br />2. <br />IN ANY SEASON, SEDIMENT LEACHING FROM STOCK PILES MUST BE PREVENTED. <br />6. <br />AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A <br />THAT AS SITE CONDITIONS CHANGE, THE EROSION AND SEDIMENT CONTROL IS <br />® DURATION OF DISCHARGE <br />TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR <br />ALWAYS IN ACCORDANCE WITH THE CITY OF EVERETT EROSION AND SEDIMENT <br />3. <br />TOPSOILS SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN <br />TO PAVING, THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE <br />CONTROL STANDARDS. <br />7. ANY STORMWATER COLLECTED INTO A TRUCK SHALL NOT BE DISCHARGED TO THE <br />THE SUBGRADE IS EXCESSIVELY WET OR WHEN CONDITIONS EXIST THAT MAY <br />DOWNSTREAM SYSTEM. <br />STORMWATER SYSTEM. <br />OTHERWISE BE DETRIMENTAL TO PROPER GRADING OR PROPOSED SODDING OR <br />PLASTIC <br />COVERING NOTES <br />4.3. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS <br />SEEDING. <br />9. <br />STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF <br />( <br />DURING THE DRY SEASON OR 2 DAYS DURING THE WET SEASON WITH PLASTIC <br />6. THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL FROM CITY OF EVERETT FOR <br />CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES <br />SHEETING. <br />ANY OFF -SITE DISPOSAL OF WATER, SEDIMENT, OR DEBRIS. <br />4. <br />PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE <br />MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION <br />1. <br />PLASTIC SHEETING SHAD_ HAVE A MINIMUM THICKNESS OF 6 MILS AND SHALL <br />MAINTAINED ACCORDING TO THE APPROVED. PLAN. <br />OF THE PROJECT. <br />MEET THE REQUIREMENTS OF THE STATE STANDARD SPECIFICATIONS SECTION <br />4.4. STABILIZE ALL AREAS WITHIN SEVEN DAYS OF REACHING FINAL GRADE. <br />9-14,6(3). <br />10. <br />THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT <br />5. PROVIDE AS -BUILT DRAWINGS TO OWNER/ENGINEER FOR THE COMPLETION OF <br />TRACKED OFF THE SITE. <br />2. <br />COVERING SHALL BE INSTALLED AND MAINTAINED TIGHTLY IN PLACE BY USING <br />RECORD DRAWINGS. <br />SANDBAGS OR TIRES ON ROPES WITH A MAXIMUM 10-FOOT GRID SPACING IN ALL <br />11. <br />APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER <br />DIRECTIONS. ALL SEAMS SHALL BE TAPED OR WEIGHTED DOWN FULL LENGTH AND <br />6. PROCEED WITH PROJECT CLOSE-OUT. <br />BODIES IF THE PROPOSED BMP°S FAIL. <br />THERE SHALL BE AT LEAST A 12-INCH OVERLAP OF ALL SEAMS. <br />3. <br />CLEAR PLASTIC COVERING SHALL BE INSTALLED IMMEDIATELY ON AREAS SEEDED <br />11 <br />BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO <br />BETWEEN NOVEMBER 1 AND MARCH 31 AND REMAIN UNTIL VEGETATION IS FIRMLY <br />MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NOT MORE THAN 7 DAYS <br />ESTABLISHED. <br />FROM MAY 1 THROUGH SEPTEMBER 30. <br />4, <br />WHEN THE COVERING IS USED ON UN -SEEDED SLOPES, IT SHALL BE KEPT IN <br />PLACE UNTIL THE NEXT SEEDING PERIOD. <br />NOTES (BMP C121) <br />5. <br />PLASTIC COVERING SHEETS SHALL BE BURIED TWO FEET AT THE TOP OF SLOPES <br />-MULCHING <br />IN ORDER TO PREVENT SURFACE WATER FLOW BENEATH SHEETS. <br />1. <br />MULCH MATERIALS USED SHALL BE STRAW OR WOOD CELLULOSE FIBERS, AND SHALL BE APPLIED <br />6. <br />PROPER MAINTENANCE INCLUDES REGULAR CHECKS FOR RIPS AND DISLODGED <br />PER WSDOT STANDARD SPECIFICATION 9-14 EROSION CONTROL AND ROADSIDE PLANTING. PROVIDE <br />ENDS. <br />SOLID COVER OVER FINISH GRADE. <br />2. <br />SHALL BE D IMMEDIATELY AFTER SEEDING OR IN AREAS WHICH CANNOT BE SEEDED <br />EROSION CONTROL NOTES1, <br />BMULCHING <br />ECAUSE OF THE SEASON. <br />ON -SITE EROSION MEASURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />CLEAR PLASTIC <br />3. <br />ALL AREAS NEEDING MULCH SHALL BE COVERED BY OCTOBER 31. <br />ANY PROBLEMS OCCURRING BEFORE FINAL ACCEPTANCE OF THE STORM SYSTEM BY <br />COVERING <br />THE OWNER SHALL BE CORRECTED BY THE CONTRACTOR. <br />10' <br />- <br />STAKE AND SAND BAG <br />10' (TYP.) <br />2. <br />IN CASE EROSION OR SEDIMENTATION OCCURS ON ADJACENT PROPERTY, ALL <br />TYP._ <br />2" x2" x3' WOODEN STAKE <br />CONSTRUCTION WORK WITHIN THE DEVELOPMENT THAT WILL AGGRAVATE THE <br />-_ <br />= TYP. <br />SITUATION MUST CEASE AND THE CONTRACTOR SHALL IMMEDIATELY COMMENCE <br />RESTORATION OR MITIGATION METHODS. RESTORATION ACTIVITY WILL CONTINUE <br />SAND BAG <br />UNTIL SUCH TIME AS THE PROBLEM IS RECTIFIED. <br />= A <br />3. <br />ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHOWN ON THESE DRAWINGS <br />SHALL BE INSTALLED PRIOR TO OR AS THE FIRST STAGE OF SITE PREPARATION <br />A - <br />- - <br />AND SHALL BE MAINTAINED UNTIL COMPLETION OF WORK. <br />II II III 1�1=III 11-fI-1Tl�ll �I�I1= ill <br />n u,-1 �T-I nl III=III lil ul it-lu iu ,ll-_ In I� <br />_- <br />_ <br />-- <br />- <br />4. <br />SHOULD THE TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES AS <br />f <br />-III I T=11 i i i l III L-I I <br />"-111 If Il III <br />u-� III ul <br />'�Illllli�fllilll� <br />a <br />1 OVERLAP - ALL SEAMS TO <br />SHOWN ON THESE DRAWINGS NOT PROVE ADEQUATE TO CONTROL EROSION AND <br />20' Q -nl ul=1n III BE TAPED OR WEIGHTED DOWN <br />�® q- <br />SEDIMENTATION, THE CONTRACTOR SHALL INSTALL HAY BALES, LOOSE STRAW, SILT <br />i <br />"'IIIIl1 <br />WITH SAND BAGS AT 10' <br />FENCE, OR ADDITIONAL FACILITIES AS NECESSARY TO PROTECT ADJACENT <br />S( ®,o <br />hlIlia r_ CENTERS ALONG THE SEAM <br />a III II <br />PROPERTIES, SENSITIVE AREAS, NATURAL WATER COURSES AND/OR STORM <br />F <br />III IIHu l - <br />u l Il�lil <br />-III ul <br />II III III III_i <br />1' OVERLAP <br />DRAINAGE SYSTEMS. <br />-ul uliif�nul Ilnl <br />ISOMETRIC MEW'irlll-I�� <br />nl a 'll- <br />-I III Ill ll <br />Ill I=11-I Ilrnl-� - - <br />SECTION A -A <br />5. <br />IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION OR EXPERIENCED LAND <br />-Il�lnl�l-Illul_ Tr <br />DISTURBING ACTIVITIES AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A <br />-Ill _ <br />PERIOD EXCEEDING 5 DAYS, ALL DISTURBED AREAS MUST BE IMMEDIATELY <br />-ill II,, <br />OVERLAP DETAIL <br />STABILIZED WITH MULCHING, GRASS, PLANTING OR OTHER APPROVED EROSION <br />1® <br />CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR IN QUESTION. GRASS <br />SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL <br />THROUGH SEPTEMBER INCLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER IT <br />IS iN THE INTEREST OF THE CONTRACTOR, BUT MUST BE AUGMENTED WITH <br />MULCHING. <br />6. <br />THE CONTRACTOR'S LICENSED SURVEYOR WILL BE RESPONSIBLE FOR FIELD <br />LOCATING THE CLEARING LIMITS AND ESTABLISHING THOSE BOUNDARIES WITH <br />BRIGHT COLORED FLAGGING, PAINT, FENCING, OR OTHER VISIBLE MEANS. THE <br />CONTRACTOR SHALL CLEAR TO THE LIMITS AS ESTABLISHED ON THIS PLAN AND AS <br />MARKED IN THE FIELD. <br />7. <br />ALL WORK ASSOCIATED WITH STABILIZING THE DISTURBED AREAS SHALL BE IN <br />ACCORDANCE WITH CURRENT CITY OF EVERETT STANDARDS. <br />8. <br />ALL NECESSARY FACILITIES SHALL BE MAINTAINED ON -SITE TO PREVENT DEBRIS, <br />DUST AND MUD FROM ACCUMULATING ON THE PUBLIC RIGHT-OF-WAY. <br />9. <br />THE CONTRACTOR IS RESPONSIBLE FOR KEEPING EROSION CONTROL MEASURES <br />FUNCTIONING. AFTER EACH DAY OF RAINFALL, THE CONTRACTOR SHALL INSPECT <br />THE EROSION CONTROL FACILITIES FOR DAMAGE. IF DAMAGE HAS OCCURRED TO <br />ANY OF THE FACILITIES, THE CONTRACTOR SHALL IMMEDIATELY MAKE ANY <br />NECESSARY REPAIRS IN CONFORMANCE WITH THE APPROVED PLANS. <br />10. <br />THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE SITE'S <br />CONSTRUCTION STORMWATER GENERAL PERMIT. <br />11. <br />AS STORMWATER FEATURES ARE REMOVED DURING THE DEMOLITION PROCESS, <br />CONTRACTOR MUST PROVIDE MEANS OF CONVEYING STORMWATER FROM ISOLATED <br />STRUCTURES/SYSTEMS TO ON -SITE CONSTRUCTION STORMWATER FACILITIES. <br />T <br />CITY OF EVERETT <br />EVIE1 IEl-I FOR PEIRMI T <br />V) <br />z <br />Ld <br />w <br />75 <br />CLI <br />0 <br />V) <br />V) <br />0 <br />04 <br />C) <br />0 <br />CD <br />® <br />m <br />ry <br />0co <br />a <br />< <br />0 ® <br />w <br />� z <br />V) <br />2: <br />® <br />Ld <br />w <br />v <br />WM <br />v <br />w <br />n <br />Lu <br />V <br />F <br />is <br />%3` <br />U) <br />�'•3 <br />- <br />LLJLu <br />Lu <br />K_;: Sfi ti <br />"m <br />to <br />Z <br />�d00 <br />a E. <br />3 <br />co <br />o <br />"` <br />r: <br />'" <br />Z IA <br />4 w <br />Ld <br />1 9 4uil <br />f <br />�x <br />r <br />- <br />0 <br />{N <br />*, <br />F <br />�° o <br />LJ =I <br />; <br />ow <br />vx�,�,' <br />�� <br />E1 <br />L :L <br />1 <br />v <br />