POLLUTION PREVENTION NOTES (BMP C151, g
<br />C16?)
<br />DEWATERING NOTES
<br />DEMOLITION NOTES
<br />EROSION CONTROL SEEDING (BMP C120
<br />1.
<br />EQUIPMENT LUBRICATION AND FUELING OPERATIONS SHALL OCCUR AT EXISTING
<br />1. COORDINATE ENTRY, SECURITY, TRAFFIC CONTROL PLAN, AND OTHER REQUIREMENTS
<br />1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING ALL EXCAVATIONS. ALL
<br />1.
<br />REMOVE ALL DELETERIOUS MATERIAL FOUND ON -SITE INCLUDING VEGETATION, SCRAP
<br />1.
<br />SEE SEEDING NOTES ON L1.2.
<br />PAVED AREAS.
<br />WITH OWNER PRIOR TO BEGINNING WORK.
<br />WATER GENERATED FROM DEWATERING OPERATIONS SHALL BE DISPOSED OF IN
<br />WOOD, TRASH, ETC. AND DISPOSE OF AT AN APPROVED OFF -SITE LOCATION.
<br />MANNER AND LOCATION APPROVED BY THE CITY OF EVERETT. CONTRACTOR SHALL
<br />2,
<br />PREVENT OILS AND FUELS FROM ENTERING THE STORM DRAINAGE SYSTEM WITH
<br />2. POST SIGN WITH NAME AND PHONE NUMBER OF SUPERVISOR (MAY BE
<br />PREPARE AND SUBMIT A DEWATERING PLAN PRIOR TO COMMENCING CONSTRUCTION.
<br />2,
<br />AT ALL TIMES THE CONTRACTOR SHALL MAINTAIN SIGNS, BARRICADES, FENCING, OR
<br />STANDARD
<br />EROSION CONTROL NOTES CITY OF EVERETT
<br />PROPER CONTAINMENT DEVICES.
<br />CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN).
<br />OTHER MEASURES TO ENSURE CONTINUOUS PROTECTION OF THE PUBLIC AND TO
<br />2. CONTRACTOR TO ANTICIPATE GROUNDWATER WITHIN 52 -7 FEET OF SURFACE AND
<br />PREVENT UNAUTHORIZED ENTRY TO THE CONSTRUCTION AREA. AT A MINIMUM FENCING
<br />1.
<br />APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN
<br />3.
<br />ACCESS TO CONSTRUCTION IS VIA ADJACENT EXISTING PAVED STREETS. SWEEP
<br />3, CONTRACTOR TO COORDINATE WITH OWNER FOR PHASING OF PROJECT TO MEET
<br />PROVIDE ALL EQUIPMENT NECESSARY TO DE -WATER EXCAVATIONS. COORDINATE
<br />SHALL BE 6.0 FEET HIGH. COORDINATE SAFETY AND SECURITY MEASURES WITH
<br />APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS,
<br />DIRT FROM PAVING DAILY OR AS NEEDED. THE INTENT IS TO PREVENT DIRT AND
<br />OWNERS OPERATIONAL REQUIREMENTS. IT IS ASSUMED THAT EACH PORTION OF
<br />DISCHARGE WITH OWNER IN TRAFFIC AREAS AND NEAR OPERATIONAL FACILITIES
<br />ADJACENT WORK .
<br />PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES ) .
<br />DEBRIS FROM VEHICLES AND EQUIPMENT FROM BEING DEPOSITED ON CITY STREET
<br />THE PROJECT WILL BE COMPLETED IN SERIES, WITH ONLY ONE ACTIVE WORK AREA
<br />(I.E. SURFACE PIPING IS NOT ACCEPTABLE WITHOUT APPROPRIATE, APPROVED
<br />PAVEMENT.
<br />AT ANY GIVEN TIME. THE BELOW SEQUENCE DESCRIBES THE GENERAL
<br />TRAFFIC CONTROL MEASURES). SEE GEOTECH REPORT CONCERNING .GROUNDWATER
<br />3.
<br />DAMAGE TO ANY PROPERTY, INCLUDING BUT NOT LIMITED TO, BUILDINGS, UTILITIES,
<br />2.
<br />THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE,
<br />CONSTRUCTION SEQUENCE THAT WOULD OCCUR FOR EACH WORK AREA.
<br />LEVELS ENCOUNTERED.
<br />VEHICLES, FENCING, OR LANDSCAPING AS A RESULT OF CONTRACTORS ACTIVITIES WILL
<br />REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE
<br />4.
<br />THE CONTRACTOR SHALL PREVENT ALL MATERIAL USED OR GENERATED ON -SITE
<br />BE REPAIRED OR REPLACED AT THE CONTRACTORS EXPENSE.
<br />APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND
<br />FROM ENTERING THE STORM DRAINAGE SYSTEM, THE CONTRACTOR IS
<br />RESPONSIBLE FOR PROVIDING ADEQUATE CONTAINMENT/SEPARATION AT ALL
<br />3.1. MARK CLEARING LIMITS. INSTALL FENCING AT WORK AREA. INSTALL EROSION
<br />3. ALL GROUNDWATER OR INCIDENTAL SURFACE RUNOFF COLLECTED SHALL BE
<br />4.
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING
<br />VEGETATION/LANDSCAPING IS ESTABLISHED.
<br />TIMES.
<br />CONTROL DEVICES. INSTALL TRAFFIC CONTROL DEVICES.
<br />DISCHARGED TO THE ON -SITE STORMWATER SYSTEM FOLLOWING APPROPRIATE
<br />SURVEY MONUMENTS AND OTHER SURVEY MARKERS DURING CONSTRUCTION, ALL SUCH
<br />TREATMENT OR TO THE: SANITARY SEWER SYSTEM (PER CITY OF EVERETT
<br />MONUMENTS OR MARKERS DESTROYED DURING CONSTRUCTION SHALL BE REPLACED AT
<br />3.
<br />THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED
<br />5.
<br />CONFORM TO BMP C151, C153, C154 REQUIREMENTS.
<br />3.2. REMOVE FEATURES AS SHOWN. ON REMOVAL PLANS.
<br />DISCHARGE AUTHORIZATION) UNTIL CONSTRUCTION IS COMPLETE,
<br />THE CONTRACTOR'S EXPENSE TO ORIGINAL LOCATION AND ELEVATION.
<br />IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE
<br />BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE
<br />3.3. CLEAN SURFACE OF PAVEMENT ADJACENT TO WORK AREA.
<br />4. NO SEDIMENT, TURBID WATER, OR OTHER POLLUTANTS (HEAVY METALS, OIL SHEEN,
<br />5.
<br />THE CONTRACTOR IS FINANCIALLY RESPONSIBLE FOR THE MAINTENANCE OR REPAIR OF
<br />MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION.
<br />INSPECTION, MONITORING, DOCUMENTATION AND
<br />ETC.) SHALL BE DISCHARGED TO THE ON -SITE STORMWATER SYSTEM. ANY
<br />OFF -SITE AND ON -SITE PAVED SURFACES WHERE DAMAGE HAS BEEN SUSTAINED
<br />REPORTING SCHEDULE (BMP 150162)
<br />3.4. REMOVE EXISTING UTILITIES DESIGNATED FOR REMOVAL
<br />TREATMENT OF COLLECTED WATER SHALL BE APPROVED BY CITY OF EVERETT.
<br />BECAUSE OF CONSTRUCTION TRAFFIC.
<br />4.
<br />THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL
<br />CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT
<br />g
<br />3.5. PERFORM EARTHWORK ACTIVITIES,
<br />5. ANY DISCHARGE TO THE SANITARY SEWER SYSTEM WILL REQUIRE PRIOR
<br />6.
<br />ALL CONCRETE, PAVEMENT, CURBS, SIDEWALKS AND RAMPS INDICATED TO BE
<br />AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE
<br />1.
<br />EROSION AND SEDIMENT CONTROL (ESC) FACILITIES SHALL NOT BE ALLOWED TO
<br />3.6. INSTALL NEW UTILITIES,
<br />COORDINATION WITH CITY OF EVERETT TO ESTABLISH SAMPLING PROTOCOL,
<br />REMOVED OR REPLACED SHALL BE REMOVED TO THE NEAREST JOINT AS IDENTIFIED
<br />APPLICABLE WATER QUALITY STANDARDS.
<br />FALL INTO DISREPAIR. THE PROPONENT OR DESIGNATED ESC LEAD SHALL INSPECT
<br />DISCHARGE VOLUMES, AND NOTIFICATION TO THE CITY.
<br />DURING CONSTRUCTIONWHERE THIS IS NOT POSSIBLE DUE TO CONFLICTS OR
<br />.
<br />5.
<br />THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED
<br />ALL PROJECT FACILITIES IN ACCORDANCE WITH CITY OF EVERETT CONSTRUCTION
<br />STORMWATER POLLUTION REQUIREMENTS.
<br />3.7. PREPARE FINISH SUBGRADE.
<br />6. A LOG OF ALL DISCHARGED STORMWATER SHALL BE KEPT ON -SITE AT ALL TIMES
<br />ADJACENT DAMAGED CONCRETE / ASPHALT, THE CONTRACTOR SHALL MAKE A FULL
<br />PAVEMENT DEPTH SAWCUT AT THE PROPOSED JOINT IN SOUND PAVEMENT. PROPOSED
<br />SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE
<br />3.6. INSTALL NEW PAVEMENT, AND PAVEMENT MARKINGS.
<br />DURING CONSTRUCTION. AT A MINIMUM, THE LOG SHALL CONTAIN THE FOLLOWING
<br />CONCRETE / ASPHALT SHALL EXTEND TO THE SAWCUT EDGE AND BE APPROPRIATELY
<br />UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND
<br />SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE.
<br />2.
<br />THE ESC LEAD SHALL IMPLEMENT THE ESC PLAN. IMPLEMENTATION SHALL
<br />ITEMS:
<br />JOINED / SEALED.
<br />INCLUDE BUT IS NOT LIMITED TO: INSTALLING, MAINTAINING, INSPECTING
<br />MONITORING, DOCUMENTING, REPORTING AND REPAIRING ALL TEMPORARY EROSION
<br />3.9. REMOVE FENCING, TRAFFIC CONTROL, AND EROSION CONTROL DEVICES.
<br />@ DATE DISCHARGED
<br />® SOURCE OF WATER (VAULT, PIPE, ETC.)
<br />6.
<br />THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE
<br />AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES INCLUDED IN THE PLAN
<br />o TYPE OF WATER DISCHARGED (GROUNDWATER, STORMWATER, ETC.)
<br />p }
<br />BMP
<br />APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTION, ESPECIALLY AFTER STORM
<br />SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY FIVE
<br />4. THROUGHOUT EACH PHASE OF CONSTRUCTION
<br />9 METHOD OF COLLECTION (PUMP TO TANK, ETC.)
<br />g 9
<br />EVENTS.
<br />WORKING DAYS, EACH WORKING DAY DURING A RUNOFF PRODUCING RAIN EVENT,
<br />AND WITHIN 24 HOURS AFTER A RUNOFF PRODUCING RAIN EVENT. ALL PROJECT
<br />TAN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF
<br />4.1 MAINTAIN
<br />® METHOD OF DISCHARGE DRAIN FROM TANK, PUMPED DISCHARGE, ETC.)
<br />(
<br />1,
<br />STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER APPROVED
<br />7.
<br />THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF
<br />CONSTRUCTION STORMWATER DISCHARGES SHALL COMPLY WITH CITY OF EVERETTEVERETT
<br />STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
<br />® VOLUME OF WATER DISCHARGED
<br />DEVICE) DAILY BETWEEN NOVEMBER 1 AND MARCH 31.
<br />ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT.
<br />DISCHARGE REQUIREMENTS:
<br />4.2. RELOCATE EROSION CONTROL MEASURES, OR INSTALL NEW MEASURES SO
<br />® DISCHARGE .LOCATION
<br />® RECEIVING SYSTEM (ON -SITE STORM SYSTEM, SEWER, OFF -SITE FACILITY, ETC.)
<br />2.
<br />IN ANY SEASON, SEDIMENT LEACHING FROM STOCK PILES MUST BE PREVENTED.
<br />6.
<br />AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A
<br />THAT AS SITE CONDITIONS CHANGE, THE EROSION AND SEDIMENT CONTROL IS
<br />® DURATION OF DISCHARGE
<br />TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR
<br />ALWAYS IN ACCORDANCE WITH THE CITY OF EVERETT EROSION AND SEDIMENT
<br />3.
<br />TOPSOILS SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN
<br />TO PAVING, THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE
<br />CONTROL STANDARDS.
<br />7. ANY STORMWATER COLLECTED INTO A TRUCK SHALL NOT BE DISCHARGED TO THE
<br />THE SUBGRADE IS EXCESSIVELY WET OR WHEN CONDITIONS EXIST THAT MAY
<br />DOWNSTREAM SYSTEM.
<br />STORMWATER SYSTEM.
<br />OTHERWISE BE DETRIMENTAL TO PROPER GRADING OR PROPOSED SODDING OR
<br />PLASTIC
<br />COVERING NOTES
<br />4.3. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS
<br />SEEDING.
<br />9.
<br />STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
<br />(
<br />DURING THE DRY SEASON OR 2 DAYS DURING THE WET SEASON WITH PLASTIC
<br />6. THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL FROM CITY OF EVERETT FOR
<br />CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES
<br />SHEETING.
<br />ANY OFF -SITE DISPOSAL OF WATER, SEDIMENT, OR DEBRIS.
<br />4.
<br />PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE
<br />MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION
<br />1.
<br />PLASTIC SHEETING SHAD_ HAVE A MINIMUM THICKNESS OF 6 MILS AND SHALL
<br />MAINTAINED ACCORDING TO THE APPROVED. PLAN.
<br />OF THE PROJECT.
<br />MEET THE REQUIREMENTS OF THE STATE STANDARD SPECIFICATIONS SECTION
<br />4.4. STABILIZE ALL AREAS WITHIN SEVEN DAYS OF REACHING FINAL GRADE.
<br />9-14,6(3).
<br />10.
<br />THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT
<br />5. PROVIDE AS -BUILT DRAWINGS TO OWNER/ENGINEER FOR THE COMPLETION OF
<br />TRACKED OFF THE SITE.
<br />2.
<br />COVERING SHALL BE INSTALLED AND MAINTAINED TIGHTLY IN PLACE BY USING
<br />RECORD DRAWINGS.
<br />SANDBAGS OR TIRES ON ROPES WITH A MAXIMUM 10-FOOT GRID SPACING IN ALL
<br />11.
<br />APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER
<br />DIRECTIONS. ALL SEAMS SHALL BE TAPED OR WEIGHTED DOWN FULL LENGTH AND
<br />6. PROCEED WITH PROJECT CLOSE-OUT.
<br />BODIES IF THE PROPOSED BMP°S FAIL.
<br />THERE SHALL BE AT LEAST A 12-INCH OVERLAP OF ALL SEAMS.
<br />3.
<br />CLEAR PLASTIC COVERING SHALL BE INSTALLED IMMEDIATELY ON AREAS SEEDED
<br />11
<br />BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO
<br />BETWEEN NOVEMBER 1 AND MARCH 31 AND REMAIN UNTIL VEGETATION IS FIRMLY
<br />MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NOT MORE THAN 7 DAYS
<br />ESTABLISHED.
<br />FROM MAY 1 THROUGH SEPTEMBER 30.
<br />4,
<br />WHEN THE COVERING IS USED ON UN -SEEDED SLOPES, IT SHALL BE KEPT IN
<br />PLACE UNTIL THE NEXT SEEDING PERIOD.
<br />NOTES (BMP C121)
<br />5.
<br />PLASTIC COVERING SHEETS SHALL BE BURIED TWO FEET AT THE TOP OF SLOPES
<br />-MULCHING
<br />IN ORDER TO PREVENT SURFACE WATER FLOW BENEATH SHEETS.
<br />1.
<br />MULCH MATERIALS USED SHALL BE STRAW OR WOOD CELLULOSE FIBERS, AND SHALL BE APPLIED
<br />6.
<br />PROPER MAINTENANCE INCLUDES REGULAR CHECKS FOR RIPS AND DISLODGED
<br />PER WSDOT STANDARD SPECIFICATION 9-14 EROSION CONTROL AND ROADSIDE PLANTING. PROVIDE
<br />ENDS.
<br />SOLID COVER OVER FINISH GRADE.
<br />2.
<br />SHALL BE D IMMEDIATELY AFTER SEEDING OR IN AREAS WHICH CANNOT BE SEEDED
<br />EROSION CONTROL NOTES1,
<br />BMULCHING
<br />ECAUSE OF THE SEASON.
<br />ON -SITE EROSION MEASURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
<br />CLEAR PLASTIC
<br />3.
<br />ALL AREAS NEEDING MULCH SHALL BE COVERED BY OCTOBER 31.
<br />ANY PROBLEMS OCCURRING BEFORE FINAL ACCEPTANCE OF THE STORM SYSTEM BY
<br />COVERING
<br />THE OWNER SHALL BE CORRECTED BY THE CONTRACTOR.
<br />10'
<br />-
<br />STAKE AND SAND BAG
<br />10' (TYP.)
<br />2.
<br />IN CASE EROSION OR SEDIMENTATION OCCURS ON ADJACENT PROPERTY, ALL
<br />TYP._
<br />2" x2" x3' WOODEN STAKE
<br />CONSTRUCTION WORK WITHIN THE DEVELOPMENT THAT WILL AGGRAVATE THE
<br />-_
<br />= TYP.
<br />SITUATION MUST CEASE AND THE CONTRACTOR SHALL IMMEDIATELY COMMENCE
<br />RESTORATION OR MITIGATION METHODS. RESTORATION ACTIVITY WILL CONTINUE
<br />SAND BAG
<br />UNTIL SUCH TIME AS THE PROBLEM IS RECTIFIED.
<br />= A
<br />3.
<br />ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHOWN ON THESE DRAWINGS
<br />SHALL BE INSTALLED PRIOR TO OR AS THE FIRST STAGE OF SITE PREPARATION
<br />A -
<br />- -
<br />AND SHALL BE MAINTAINED UNTIL COMPLETION OF WORK.
<br />II II III 1�1=III 11-fI-1Tl�ll �I�I1= ill
<br />n u,-1 �T-I nl III=III lil ul it-lu iu ,ll-_ In I�
<br />_-
<br />_
<br />--
<br />-
<br />4.
<br />SHOULD THE TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES AS
<br />f
<br />-III I T=11 i i i l III L-I I
<br />"-111 If Il III
<br />u-� III ul
<br />'�Illllli�fllilll�
<br />a
<br />1 OVERLAP - ALL SEAMS TO
<br />SHOWN ON THESE DRAWINGS NOT PROVE ADEQUATE TO CONTROL EROSION AND
<br />20' Q -nl ul=1n III BE TAPED OR WEIGHTED DOWN
<br />�® q-
<br />SEDIMENTATION, THE CONTRACTOR SHALL INSTALL HAY BALES, LOOSE STRAW, SILT
<br />i
<br />"'IIIIl1
<br />WITH SAND BAGS AT 10'
<br />FENCE, OR ADDITIONAL FACILITIES AS NECESSARY TO PROTECT ADJACENT
<br />S( ®,o
<br />hlIlia r_ CENTERS ALONG THE SEAM
<br />a III II
<br />PROPERTIES, SENSITIVE AREAS, NATURAL WATER COURSES AND/OR STORM
<br />F
<br />III IIHu l -
<br />u l Il�lil
<br />-III ul
<br />II III III III_i
<br />1' OVERLAP
<br />DRAINAGE SYSTEMS.
<br />-ul uliif�nul Ilnl
<br />ISOMETRIC MEW'irlll-I��
<br />nl a 'll-
<br />-I III Ill ll
<br />Ill I=11-I Ilrnl-� - -
<br />SECTION A -A
<br />5.
<br />IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION OR EXPERIENCED LAND
<br />-Il�lnl�l-Illul_ Tr
<br />DISTURBING ACTIVITIES AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A
<br />-Ill _
<br />PERIOD EXCEEDING 5 DAYS, ALL DISTURBED AREAS MUST BE IMMEDIATELY
<br />-ill II,,
<br />OVERLAP DETAIL
<br />STABILIZED WITH MULCHING, GRASS, PLANTING OR OTHER APPROVED EROSION
<br />1®
<br />CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR IN QUESTION. GRASS
<br />SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL
<br />THROUGH SEPTEMBER INCLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER IT
<br />IS iN THE INTEREST OF THE CONTRACTOR, BUT MUST BE AUGMENTED WITH
<br />MULCHING.
<br />6.
<br />THE CONTRACTOR'S LICENSED SURVEYOR WILL BE RESPONSIBLE FOR FIELD
<br />LOCATING THE CLEARING LIMITS AND ESTABLISHING THOSE BOUNDARIES WITH
<br />BRIGHT COLORED FLAGGING, PAINT, FENCING, OR OTHER VISIBLE MEANS. THE
<br />CONTRACTOR SHALL CLEAR TO THE LIMITS AS ESTABLISHED ON THIS PLAN AND AS
<br />MARKED IN THE FIELD.
<br />7.
<br />ALL WORK ASSOCIATED WITH STABILIZING THE DISTURBED AREAS SHALL BE IN
<br />ACCORDANCE WITH CURRENT CITY OF EVERETT STANDARDS.
<br />8.
<br />ALL NECESSARY FACILITIES SHALL BE MAINTAINED ON -SITE TO PREVENT DEBRIS,
<br />DUST AND MUD FROM ACCUMULATING ON THE PUBLIC RIGHT-OF-WAY.
<br />9.
<br />THE CONTRACTOR IS RESPONSIBLE FOR KEEPING EROSION CONTROL MEASURES
<br />FUNCTIONING. AFTER EACH DAY OF RAINFALL, THE CONTRACTOR SHALL INSPECT
<br />THE EROSION CONTROL FACILITIES FOR DAMAGE. IF DAMAGE HAS OCCURRED TO
<br />ANY OF THE FACILITIES, THE CONTRACTOR SHALL IMMEDIATELY MAKE ANY
<br />NECESSARY REPAIRS IN CONFORMANCE WITH THE APPROVED PLANS.
<br />10.
<br />THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE SITE'S
<br />CONSTRUCTION STORMWATER GENERAL PERMIT.
<br />11.
<br />AS STORMWATER FEATURES ARE REMOVED DURING THE DEMOLITION PROCESS,
<br />CONTRACTOR MUST PROVIDE MEANS OF CONVEYING STORMWATER FROM ISOLATED
<br />STRUCTURES/SYSTEMS TO ON -SITE CONSTRUCTION STORMWATER FACILITIES.
<br />T
<br />CITY OF EVERETT
<br />EVIE1 IEl-I FOR PEIRMI T
<br />V)
<br />z
<br />Ld
<br />w
<br />75
<br />CLI
<br />0
<br />V)
<br />V)
<br />0
<br />04
<br />C)
<br />0
<br />CD
<br />®
<br />m
<br />ry
<br />0co
<br />a
<br /><
<br />0 ®
<br />w
<br />� z
<br />V)
<br />2:
<br />®
<br />Ld
<br />w
<br />v
<br />WM
<br />v
<br />w
<br />n
<br />Lu
<br />V
<br />F
<br />is
<br />%3`
<br />U)
<br />�'•3
<br />-
<br />LLJLu
<br />Lu
<br />K_;: Sfi ti
<br />"m
<br />to
<br />Z
<br />�d00
<br />a E.
<br />3
<br />co
<br />o
<br />"`
<br />r:
<br />'"
<br />Z IA
<br />4 w
<br />Ld
<br />1 9 4uil
<br />f
<br />�x
<br />r
<br />-
<br />0
<br />{N
<br />*,
<br />F
<br />�° o
<br />LJ =I
<br />;
<br />ow
<br />vx�,�,'
<br />��
<br />E1
<br />L :L
<br />1
<br />v
<br />
|