Laserfiche WebLink
TOP CHORD <br />OF JOIST <br />ROD TO BE THREADED <br />COMPLETELY THROUGH <br />p <br />THE BEAM CLAMP OR <br />SECURELY ATTACHED <br />TO UNISTRUT WITH <br />WASHER AND DOUBLE <br />BEAM CLAMP <br />NUTS. <br />LOCK NUT <br />-- ALL THREAD ROD <br />OR <br />WHERE CONTINUOUS <br />INSULATION IS NOT <br />REQUIRED AROUND <br />LIQUID LINE, PROVIDE <br />INSULATION ONLY AT <br />THE SNAP 'N SHIELD <br />SUPPORT TO PREVENT <br />PIPE DAMAGE. GLUE <br />INSULATION TO SUPPORT <br />AND EXTEND 1/2" PAST <br />BOTH EDGES. INSTALL <br />CONTINUOUS INSULATION <br />IF SYSTEM HAS <br />SUB —COOLING. REFRIGERATION <br />PIPE SLOPE DOUBLE NUTS <br />1/16" PER FOOT AT BOTTOM li <br />OF ALL <br />CONTINUOUS PIPE <br />THREAD ROD <br />INSULATION <br />SNAP 'N SHIELD <br />PIPE SUPPORT <br />UNISTRUT <br />I Note: <br />ATTACHMENTS CAN BE MADE TO EITHER TOP CHORD OF JOIST OR UNISTRUT CHANNEL SPANNING TOP <br />JOIST, ATTACHMENT OF FIXTURES TO BOTTOM CHORD OF STEEL OR ROOF METAL DECKING WILL NOT BE <br />PERMITTED. <br />Detail Based on: <br />REFRIGERATION PIPE DATE: 6 SCALE: <br />SNAP 'N SHIELD PIPE SUPPORT N <br />6Y. COOPER 9_Lf"a. S U. P P O R T DETAIL DRAWN: i <br />R <br />ORIGINAL ISSUE DATE 7/23/12 MASTER INSTALLATION DETAIL ISD— <br />//��'T r-,_ RISERS UP TO HAIN TRUNK SEE SPECS FCi ALL I ULATED PIPING (UCTION <br />tJ I r FOR PAIDLIi`-IF TRAP REQUIR MENTS A � �— AND SUB( OLED LIQ UID LINES) SPRAY <br />RISD-3,A &., _43�}B.FOR Ti'rIC. L EXPANDING FOAM hJ�ULA 11UPi IN <br />THIS DETAIL I> CfPIG AL FOR ALL SUPPORT DETAILS. COORDINATE RISER j/ �, UNISTRUT CHANNEL AND OVER THE <br />CASE TOP PIPINt. PiPiNG TO BE WEFT AS PLACEMENT ,:1TH CASE TOP PIPING TO j t_LAt.IP, TRIM AVi Y EX _,, .AND <br />CLOSE TO REAR OF CASES AS PRACTICAL ENABLE EFFICIENT ROUTING. f CO`JER 'VOTH ARNIAFLFX CLUED VOTH <br />AND TO BE POUTED NO HIGHER THAN f INSULATION CEMENT. <br />NECESSARY. SUCTION LINES TO CONNECT AT <br />TOP. LIQUID LINES TO FEED FROM BOTTOM <br />C{; END. j <br />DO NOT SLOPE HORIZONTAL CASE TOP <br />PIPH,P3. ALL OTHER PIPING. TO BE <br />SLOPED PER SPECS. } . <br />.r <br />MITER AND '.EAL ALL INSULATION 1 / <br />( FE SPECS) `'04 iy tt <br />ALL HORIZONTAL CASE TOP <br />PIPING TO EF SUPPORIED WITH <br />TRIPLE STACKED 1 5/8 <br />UNk TRUT SPACED E'JER o <br />MAXIMUK4, FASTEN TO CASE TOP �'�.• A -�/�.. <br />AND CLAL1P TO PIPING INITH `r '- l •+.. <br />Ct1:H A CLAIJPS. NO SADDLES / i7 <br />PERMITTED, h PIPING J POET 13 T} FF�� <br />TO BE WITHIN 20" OF ALL <br />CASE PENETRATIONS & RISERS. <br />\ B ES OF MAIN : UGTivPJPII <br />Dk,PZRNG ROUTED <br />CASE <br />TO TERMINATE PLACE BUr:Es <br />MiH LONG RADIUS P-TRAPS SEE SPECS) IS ACCEPTABLE <br />{ <br />• l . <br />s� <br />DO NOT ROUTE <br />PIPING 01, / <br />CASE rLNTR1_LENCLOSIIPES <br />aE"'L II <br />A r�= <br />CASE ��✓' �� //� <br />PENETRATIONS <br />(SEE SPECS) <br />4 <br />0� , <br />DATE: 6/14/17 <br />CASE TOP PIPING SCALE: NONE <br />DRAWN: ZAW <br />'.ORIGINAL ISSUE DATE 11/5/13 <br />MASTER INSTALLATION DETAIL II RISD-35 <br />INSTALLATION STEP 1 <br />UNINSULATED REFRIGERATION PIPE <br />(NON SUBCOOLED LIQUID LINES) <br />INSULATED REFRIGERATION PIPE <br />(SUCTION AND SUBCOOLED LIQUID LINES) <br />STOP INSULATION ON BOTH SIDES OF <br />THE CUSH-A-CLAMP <br />UNISTRUT ATTACHED TO WALL <br />CUSH-A-CLAMP PIPE SUPPORTS REQUIRED <br />1'-O" ABOVE CASE TOP AND 1'-0" BELOW <br />TOP OF RISER. MIDPOINT SUPPORT <br />REQUIRED FOR ALL RISERS 10' OR <br />GREATER. MAXIMUM DISTANCE BETWEEN <br />SUPPORTS TO BE 10'-0". <br />A. SPRAY EXPANDING FOAM <br />INSULATION IN UNISTRUT <br />CHANNEL AND OVER THE <br />CLAMP. TRIM AWAY EXCESS <br />EXPANDING FOAM <br />INSULATION BEFORE <br />COVERING WITH ARMAFLEX. <br />B. COVER CLAMP AND FOAM <br />INSULATION WITH ARMAFLEX <br />GLUED WITH INSULATION <br />CEMENT. <br />E: <br />SEPS A AND B REQUIRED FOR SUCTION AND <br />UBCOOLED LIQUID LINES ONLY. <br />INSTALLATION STEP 2 <br />(ALL INSULATED PIPING) <br />WALL MOUNTED DATE: 6/14/17 <br />REFRIGERATION PIPING SCALE: NONE <br />DRAWN: ZAW <br />RISER SUPPORT , <br />MASTER INSTALLATION DETAIL RfSD-34 <br />ORIGINAL ISSUE DATE 1/14/13 <br />MID LINE TRAP TO BE <br />VERTICAL UNISTRUT ATTACHED TO PVC TUBING LOCATED DIRECTLY <br />AND HORIZONTAL UNISTRUT. CLAMP REFRIGERATION ABOVE TOP OF PVC, IF <br />PIPING TO HORIZONTAL UNISTRUT WITH REQUIRED. <br />CUSH—A—CLAMPS. SPRAY EXPANDING FOAM A <br />INSULATION IN UNISTRUT CHANNEL AND OVER THE REFRIGERATION PIPING <br />CLAMP. TRIM AWAY EXCESS EXPANDING FOAM TO MAIN OVERHEAD <br />INSULATION BEFORE COVERING WITH ARMAFLEX TRUNKS. SEE RISD-33 <br />GLUED WITH INSULATION CEMENT & RISD-34B FOR <br />® ® TYPICAL SUPPORT AND <br />B" (ONE CIRCUIT) OR 10" INSTALLATION DETAILS <br />(TWO CIRCUITS) PAINTED <br />SCHEDULE 40 PVC TUBING z SUSPENDED CEILING <br />FOR REFRIGERATION LINE AND AS OCCURS IN PREP <br />ELECTRICAL CONDUIT ROUTING AREAS ONLY <br />SECTION EXTEND TO 12'-0" ABOVE <br />'A -At FINISHED FLOOR OR 6" ABOVE (NOT SALES AREA) <br />PREP AREA SUSPENDED <br />CEILINGS SCHEDULE 40 PVC <br />TUBING <br />PVC FLANGE FASTENED TOP PIPED REFRIGERATED <br />TO CASE TOP AND LOW OR DOUBLE WIDE <br />GLUED TO PVC TUBING ISLAND CASE <br />LJ <br />>^ <br />O w <br />QujujQ <br />®0-1 cf)Z <br />CIO uQ u-, <br />J — <br />O(/)u U)U <br />i O <br />LOW AND DOUBLE WIDE DATE: 3/9/18 <br />ISLAND REFRIGERATION SCALE: NONE <br />DRAWN: ZAW <br />RISERS <br />ORIGINAL ISSUE DATE 6j14/17 MASTER INSTALLATION DETAIL RISD- 36 A <br />UNINSULATED REFRIGERATION PIPE <br />(NON SUBCOOLED LIQUID LINES) <br />INSULATED REFRIGERATION PIPE <br />{ <br />(SUCTION AND SUBCOOLED LIQUID LINES) <br />METAL <br />j <br />STUDS. <br />I <br />STOP INSULATION ON BOTH SIDES OF <br />REFER TO <br />i <br />THE CUSH-A-CLAMP <br />ARCHITECTURAL <br />i <br />DRAWINGS. <br />I <br />I I <br />I I <br />i <br />SECURELY ATTACH UNISTRUT TO <br />I <br />WALL WHEN EXPOSED IN BACK <br />ROOM AREA OR ATTACH <br />UNISTRUT IN PLACE WITH <br />UNISTRUT ANGLE P1326 WHEN <br />CONCEALED IN SPACE. SEE <br />I <br />NOTE No. 2. <br />I I <br />{ <br />CUSH-A-CLAMP PIPE SUPPORTS <br />I j <br />REQUIRED 1'-0" ABOVE CASE TOP AND <br />I <br />1'-O" BELOW TOP OF RISER. MIDPOINT <br />I <br />SUPPORT REQUIRED FOR ALL RISERS <br />10' OR GREATER. MAXIMUM DISTANCE <br />BETWEEN SUPPORTS TO BE 10'--0". <br />INSTALLATION STEP 1 <br />A. SPRAY EXPANDING FOAM <br />INSULATION IN UNISTRUT <br />CHANNEL AND OVER THE <br />CLAMP. TRIM AWAY EXCESS <br />j I <br />EXPANDING FOAM <br />I i <br />INSULATION BEFORE <br />1 I <br />I I <br />COVERING WITH ARMAFLEX. <br />I <br />, I <br />B.COVER CLAMP AND FOAM <br />I I <br />INSULATION WITH ARMAFLEX <br />II <br />I <br />GLUED WITH INSULATION <br />I <br />1 I <br />I <br />CEMENT. <br />1 I <br />I I <br />I <br />i 1 <br />I <br />INSTALLATION STEP 2 - <br />(ALL INSULATED PIPING) <br />NOTES: <br />1. STEPS A AND 8 REQUIRED FOR SUCTION AND SUBCOOLED - <br />LIQUID LINES ONLY. <br />2. WITHIN STUD SPACE, UNISTRUT CHANNEL SERIES P4000 OF <br />SHORTEST MANUFACTURER'S HEIGHT TO BE USED DUE TO 1(f1 <br />SPACE CONSTRAINTS. <br />SECURELY ATTACH <br />UNISTRUT WITH <br />UNISTRUT ANGLE <br />P1326. <br />SECTION 'A —A' <br />STUD WALL CAVITY DATE: 6/14/17 <br />REFRIGERATION PIPING SDALWN: ZAW <br />RISER <br />RISD-34A <br />ORIGINAL ISSUE DATE 11/5/13 ASTER INSTALLATION DETAIL <br />A <br />A <br />T <br />B <br />B <br />U <br />A <br />D <br />B <br />11 LI <br />PROVIDE HORIZONTAL CLAMP. <br />REFER TO <br />THREAD <br />THREADED <br />RISD-33. <br />INVERTED <br />TRAP <br />LL THREAD ROD <br />UNISTRUT (P1 <br />TTACHED TO <br />BEYOND, ATTA <br />OP CORD OF <br />TO TOP CHOR <br />AR JOIST BY <br />BAR JOIST BY <br />EAM CLAMP <br />THREAD ROD <br />BEAM CLAMP <br />NISTRUT (P1000H3) <br />TTACHED TO ALL <br />ROD. <br />OUBLE NUTS AT <br />(SEPARATE FIR <br />VERTICAL PIPE <br />SUPPORT <br />ASSEMBLY). <br />OTTOM OF <br />RODS. <br />it <br />II <br />11 <br />-SEE NOTE No. <br />LOCK NUT <br />SEAM CLAMP <br />DETAIL <br />SEE NOTE No. <br />INSULATED SUi <br />LINE <br />QUID LINE <br />SEE INSTALL <br />DETAILS THI' <br />SHEET. <br />u <br />OOOHS) <br />INSULATED <br />LIQUID LINE <br />REFRIGERATION <br />PIPE. STOP <br />INSULATION ON <br />UNISTRUT FLAT PLATE <br />UNISTRUT <br />EITHER SIDE OF <br />1031 <br />THE LUSH-A- <br />CLAMP. <br />0 0 <br />0 <br />TO <br />UNISTRUT CHANNEL <br />P1000 HS <br />UNISTRUT TELESTRUT <br />SYSTEM BASE P9012 <br />CHED <br />D OF <br />ALL <br />_ <br />AND <br />OM------_-----`tr== <br />INSTALLATION STEP 1 (BACK ELEV.) <br />ASPRAY EXPANDING FOAM <br />2. INSULATION IN UNISTRUT <br />LIQUID LINAt4INSULATION <br />CHANNEL AND OVER THE <br />CLAMP. TRIM AWAY EXCESS <br />EXPANDING FOAM <br />SEE NOTE BEFORE1•COVERING WITH ARMAFLEX. <br />CUSH-A-CLAMP UNDER <br />INSULATION <br />:TION COVER CLAMP AND FOAM <br />INSULATION WITH ARMAFLEX <br />GLUED WITH INSULATION <br />CEMENT. <br />t+1 <br />NTION REFER TO <br />RISD-35 <br />FOR CASE <br />��Rk� TOP PIPING <br />SUPPORT. <br />(ALL INSULATED PIPING) <br />NOTES: <br />1. <br />MIDPOINT SUPPORT REQUIRED FOR ALL RISERS 10' OR GREATER. <br />WIDTH OF UNISTRUT VARIES WITH QUANTITY AND DIAMETER OF <br />REFRIGERATION PIPING. REFER TO RISD-34. <br />2. <br />MIDPOINT OIL TRAP REQUIRED FOR SUCTION RISERS THAT EXTEND 12' <br />OR GREATER ABOVE CASE TOP. <br />3. <br />STEPS A AND 8 REQUIRED FOR SUCTION AND INSULATED SUBCOOLED <br />LIQUID LINES ONLY. <br />4 <br />PIPES SHOWN APPEAR TO BE SPREAD APART WIDER THAN IN FIELD <br />FRONT ELEVATION CONDITION TO HELP ILLUSTRATE DETAIL. <br />6/14/17 <br />FREESTANDING DATE: <br />REFRIGERATION PIPING SCALE: NONE <br />� DRAWN: ZAW <br />RISER SUPPORT <br />ORIGINAL ISSUE DATE 1/30 15 MASTER INSTALLATION DETAIL RISD-3� 6 <br />I_ <br />1 A PLOTtEDS I : <br />l3g"9333s'-99 <br />:7L.a „ <br />7 Ol: CROSS BUILDING 76 ; <br />BAK STORE <br />MEZZANINE <br />DOCK /—Ul l LII 111 3 S1 <br />- GROSS BUILDING <br />691 <br />EFl— <br />N A. DETAILS <br />:ATE EL PACrA, : €t­� <br />Not Applicable <br />r"'M 4 '2 2 <br />R501 <br />0"'OF�--. FM458R5.1.DWG <br />PInTTEP, RN : 'F'• , 17, PflPrI IP; 14 m RYA sr; <br />