Laserfiche WebLink
ELECTRICAL SYMBOLS LEGEND <br />SYMBOL <br />(N) <br />NEW CIRCUIT <br />(E) <br />EXISTING CIRCUIT TO REMAIN <br />(D) <br />EXISTING CIRCUIT TO DEMOLISH <br />(R) <br />RELOCATED CIRCUIT TO INTERCEPT AND EXTEND <br />HOMERUN <br />PANEL BOARD <br />SIMPLEX RECEPTACLE <br />DUPLEX RECEPTACLE <br />QUADRUPLEX RECEPTACLE <br />C <br />CEILING RECEPTACLE <br />P <br />PENDANT RECEPTACLE <br />GFCI <br />GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLE <br />IG <br />ISOLATED GROUND RECEPTACLE <br />WP <br />WEATHERPROOF RECEPTACLE <br />+1811 <br />RECEPTACLE WITH MOUNTING HEIGHT <br />FLOOR RECEPTACLE <br />SPECIAL PURPOSE RECEPTACLE, MATCH TO "NEMN PATTERN OF EQUIPMENT <br />DIRECT CONNECTION <br />PLUG MOLD STRIP <br />DISCONNECT <br />J <br />JUNCTION BOX <br />J <br />FLOOR JUNCTION BOX <br />PP <br />TWO SECTION DATAJPOWER POLE <br />SINGLE POLE SWITCH <br />S2 <br />TWO POLE SWITCH <br />SD <br />DIMMER SWITCH <br />SM <br />MOTOR RATED SWITCH <br />Sz <br />DATA RECEPTACLE WITH 3/4" CONDUIT, COORDINATE EXACT REQUIREMENTS WITH NETWORK SERVICES <br />OS <br />OCCUPANCY SENSOR, CEILING MOUNT <br />F <br />MANUAL PULL STATION <br />S <br />SMOKE DETECTOR <br />H <br />FIRE ALARM HORN <br />S <br />FIRE ALARM STROBE {# a CANDELA) <br />94FIRE <br />ALARM HORN STROBE (# = CANDELA) <br />123 <br />ARCHITECTURAL ROOM NO. <br />AC <br />ABOVE COUNTER <br />DC <br />DROP CORD <br />SOLID HEAVY LINE INDICATES RACEWAY AND OR CONDUCTORS ABOVE FINISHED FLOOR. <br />DASHED HEAVY LINE INDICATES RACEWAY AND OR CONDUCTORS BELOW FINISHED FLOOR. <br />EF <br />MECHANICAL EQUIPMENT NUMBER <br />Es® <br />DETAIL NUMBER CALLOUT <br />3 E E <br />OTE <br />#2 <br />DEVICE PLACEMENT <br />48" <br />MAX <br />ALL OPERABLE <br />PARTS MUST BE <br />WITHIN <br />SPECIFIED <br />RANGES <br />15'° MIN <br />FIN. FLR. <br />ELECTRICAL <br />GENERAL MOTES: <br />1. THE ELECTRICAL SYSTEMS DEFINED BY THESE PLANS, INCLUDING ANY ACCOMPANYING SPECIFICATIONS, ARE BASED ON <br />BEST AVAILABLE INFORMATION AND ARE TO BE CONSTRUCTED AS COMPLETE AND OPERABLE SYSTEMS AND SHALL BE <br />BID WITH THIS INTENT. THE CONTRACTOR SHALL VISIT THE SITE, REVIEW ALL RELEVANT DOCUMENTATION, AND BECOME <br />FAMILIAR WITH THE SCOPE OF WORK TO BE ACCOMPLISHED. SHOULD ANY ERROR, OMISSION, OR CONFLICT EXIST IN THE <br />PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING BEFORE SUBMITTING THEIR BID <br />PRICE SO THAT A PRE -BID ADDENDUM CAN BE ISSUED, OTHERWISE, THE CONTRACTOR SHALL SUPPLY THE PROPER <br />MATERIALS AND LABOR TO INSTALL COMPLETE AND OPERABLE SYSTEMS INCLUSIVE OF THEIR ORIGINAL BID. UPON <br />COMPLETION OF EACH ELECTRICAL SYSTEM, THE CONTRACTOR SHALL TEST AND CONFIRM ITS PROPER OPERATION. ANY <br />INCOMPLETE SYSTEM SHALL BE MADE COMPLETE AND OPERABLE PRIOR TO PROJECT CLOSEOUT. <br />2. THE PLANS FOR OTHER TRADES, SUCH AS ARCHITECTURAL, MECHANICAL, PLUMBING, AND REFRIGERATION, ARE <br />CONSIDERED A PART OF THE ELECTRICAL DOCUMENTS SO FAR AS ANY ELECTRICAL ITEMS THEY MAY CONTAIN. THE <br />CONTRACTOR SHALL REFER TO AND COORDINATE WITH THEM. NO EXTRA COST SHALL BE ALLOWED FOR FAILURE TO <br />COORDINATE THE CONTRACT DOCUMENTS WITH OTHER TRADES OR IF EQUIPMENT DIMENSIONS ARE GREATER THAN <br />SPECIFIED OR DIMENSIONED ON THE ELECTRICAL PLANS. <br />3. THE CONTRACTOR SHALL PROVIDE EQUIPMENT, MATERIALS, AND LABOR REQUIRED FOR THE ELECTRICAL CONNECTIONS <br />OF ALL EQUIPMENT SHOWN ON THE PLANS FOR OTHER TRADES, SUCH AS ARCHITECTURAL, MECHANICAL, PLUMBING, <br />AND REFRIGERATION. <br />4. THIS PROJECT IS TO BE INSTALLED IN STRICT ACCORDANCE WITH THE MOST RECENT LOCAL, STATE, AND NATIONAL <br />CODES. IF AT ANY TIME DURING OR AFTER CONSTRUCTION SOMETHING IS FOUND TO BE INSTALLED IN VIOLATION OF <br />THESE CODES, IT SHALL BE CORRECTED BY THE CONTRACTOR. <br />5. ALL EQUIPMENT PROVIDED BY THE CONTRACTOR SHALL BE LISTED AND LABELED BY A NATIONALLY RECOGNIZED <br />TESTING AGENCY THAT IS ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION AND BE PROPERLY INSTALLED FOR <br />THE CONDITIONS AND SPACE THAT IT IS BEING INSTALLED WITHIN. <br />6. THE CONTRACTOR SHALL INSTALL A SEPARATE EQUIPMENT GROUNDING CONDUCTOR IN EACH CONDUIT RUN. CONDUIT <br />SHALL NOT BE USED AS AN EQUIPMENT GROUNDING CONDUCTOR. THE CONTRACTOR SHALL GROUND THE ELECTRICAL <br />SYSTEM IN ACCORDANCE WITH THE MOST RECENT LOCAL, STATE, AND NATIONAL CODES. <br />7. ALL CONDUIT SHALL BE INSTALLED PARALLEL AND PERPENDICULAR TO ROOF JOISTS. CONDUIT LAYOUTS SHOWN ON THE <br />PLANS ARE DIAGRAMMATIC, NOT INDICATING THE EXACT ROUTING REQUIRED. THE CONTRACTOR SHALL ROUTE THE <br />CONDUITS AS REQUIRED BY THE CONDITIONS OF THE INSTALLATION AND SHALL COORDINATE WITH DUCTWORK, PIPING, <br />EQUIPMENT, BUILDING STRUCTURE, AND OTHER POTENTIAL OBSTRUCTIONS. <br />8. THE CONTRACTOR SHALL ALLOW THE MOVEMENT, BEFORE ROUGH -IN, OF ANY ELECTRICAL PANEL, DEVICE, LUMINAtRE, <br />ETC. A DISTANCE OF 10 FEET WITHOUT REQUIRING ADDITIONAL COST TO THE PROJECT. <br />9. THE CONTRACTOR SHALL SECURE ALL CONDUIT TO THE STRUCTURE AS IT IS SET IN PLACE USING INDUSTRY=STANDARD <br />METHODS AND PRACTICES. TO ENSURE ALL DEVICES ARE RIGIDLY FIXED, THE CONTRACTOR SHALL SECURE ALL DEVICE <br />BOXES WITH BRACKETS, HANGERS, ETC, DESIGNED FOR THE APPLICATION. <br />10. UNLESS OTHERWISE NOTED, THE MINIMUM SIZE CONDUIT SHALL BE 3/4-INCH. FOR DRY INTERIOR LOCATIONS THAT ARE <br />NOT SUBJECT TO PHYSICAL DAMAGE, THE CONDUIT SHALL BE EMT WITH STEEL SET SCREW FITTINGS. FOR INTERIOR <br />LOCATIONS SUBJECT TO PHYSICAL DAMAGE AND EXTERIOR LOCATIONS, EXCEPT FOR THE SERVICE ENTRANCE, THE <br />CONDUIT SHALL BE GALVANIZED RIGID STEEL CONDUIT (GRC). FOR DAMP INTERIOR LOCATIONS THAT ARE NOT SUBJECT <br />TO PHYSICAL DAMAGE, THE CONDUIT SHALL BE EMT WITH COMPRESSION GLAND TYPE FITTINGS. FOR WET INTERIOR <br />LOCATIONS THAT ARE NOT SUBJECT TO PHYSICAL DAMAGE, THE CONDUIT SHALL BE SCHEDULE 40 PVC. FOR WET <br />INTERIOR LOCATIONS THAT ARE SUBJECT TO PHYSICAL DAMAGE, THE CONDUIT SHALL BE GRC. UNDERGROUND CONDUIT <br />SHALL BE SCHEDULE 40 PVC WITH GRC ELBOWS AND RISERS THAT ARE WRAPPED IN CORROSION -RESISTANT MATERIALS <br />WHERE INDIRECT CONTACT WITH SOIL OR CONCRETE. <br />11. FLEXIBLE CONDUIT AND MC CABLE SHALL BE LIMITED TO CONNECTIONS TO LIGHT FIXTURES AND FINAL CONNECTIONS TO <br />MOTORS OR OTHER EQUIPMENT SUBJECT TO VIBRATION. LENGTHS OF FLEXIBLE OR LIQUID -TIGHT FLEXIBLE CONDUIT <br />SHALL NOT BE GREATER THAN 72 INCHES. <br />12. THE CONTRACTOR SHALL PROVIDE ALL EMPTY CONDUITS WITH A 200LB RATED NYLON PULL CORD. <br />13. WHERE WIRE SIZE IS NOT SHOWN ON THE PLANS FOR 20A, 120V BRANCH CIRCUITS, THE CIRCUIT SHALL CONSIST OF TWO <br />#12 THHN, COPPER CONDUCTORS, AND ONE #12 THHN, COPPER GROUND IN 314-INCH CONDUIT. REFER TO EQUIPMENT <br />SCHEDULES, FEEDER SCHEDULES, AND NOTES ON THE PLANS FOR WIRE AND CONDUIT SIZING FOR ALL OTHER BRANCH <br />AND FEEDER CIRCUITS. THE CONTRACTOR VERIFY ACTUAL INSTALLATION CONDITIONS AND MAINTAIN A MAXIMUM <br />VOLTAGE DROP OF 3-PERCENT FOR BRANCH CIRCUITS AND 2-PERCENT FOR FEEDER CIRCUITS. <br />% UNLESS OTHERWISE NOTED, CONDUCTORS SHALL BE 600VAG RATED, TYPE THHN/THWN-2, COPPER. CONDUCTORS UP TO <br />#10 MAY BE SOLID OR STRANDED, AND CONDUCTORS #8 OR LARGER SHALL BE STRANDED. TERMINATION OF STRANDED <br />CONDUCTORS MUST BE MADE USING UL LISTED DEVICES DESIGNED FOR THE APPLICATION. <br />15. AFTER THE INSTALLATION IS COMPLETE, THE CONTRACTOR SHALL CLEAN THE ENTIRE ELECTRICAL SYSTEM, INCLUDING <br />REMOVING ALL FINGERPRINTS, FOREIGN MATTER, PAINT, DIRT, GREASE, AND UNNECESSARY LABELS OR STICKERS FROM <br />FIXTURES AND EQUIPMENT. ADDITIONALLY, THE CONTRACTOR SHALL REMOVE ALL ACCUMULATED RUBBISH AND DEBRIS <br />FROM THE PREMISES. <br />16. ALL PENETRATIONS THROUGH FIRE -RATED ASSEMBLIES SHALL BE SEALED WITH A FIRE -RATED SEALANT, SUCH AS 3M <br />FIRESTOP FIRE -BARRIER CAULK, PUTTY, WRAP STRIPS, AND COMPOSITE SHEETS, OR DOW CORNING 3-6548 SILICONE RTV <br />FOAM. <br />17. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF WALL -MOUNTED DEVICES WITH CABINETRY AND OTHER WALL <br />OBSTRUCTIONS AND CEILING -MOUNTED DEVICES WITH CEILING OBSTRUCTIONS. ANY DEVICES THAT NEED TO BE <br />RELOCATED SHALL BE COORDINATED WITH THE FRED MEYER RELAY MANAGER, KROGER PROJECT MANAGER; AND FINAL <br />FIXTURE PLAN BEFORE ROUGH -IN. <br />18. DEVICE LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE. EXACT DEVICE LOCATIONS SHALL BE AS INDICATED <br />ON THE ARCHITECTURAL PLANS OR AS DIMENSIONED. IF NOT SHOWN ON THE ARCHITECTURAL PLANS OR DIMENSIONED <br />ON THE ELECTRICAL PLANS, VERIFY THE EXACT LOCATION WITH THE ARCHITECT PRIOR TO ROUGH -IN. <br />19. NO SCREWS ARE TO RUN INTO THE ROOF DECK UNDER ANY CIRCUMSTANCES. <br />REMODEL NOTES: <br />20. THE CONTRACTOR SHALL PROVIDE NEW, UPDATED PANEL DIRECTORIES FOR ALL PANELS IN WHICH CIRCUITS ARE <br />ADDED, RELOCATED, OR REMOVED. UNUSED CIRCUITS SHALL BE MARKED SPARE. <br />21, THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND LIGHTING TO AREAS AS REQUIRED BASED ON THE PHASING <br />PLAN WITHOUT REQUIRING ADDITIONAL COST TO THE PROJECT. <br />22, THE CONTRACTOR SHALL MAINTAIN POWER TO ALL DOWNSTREAM EQUIPMENT WHEN ANY EXISTING EQUIPMENT IS <br />REMOVED. <br />23. THE CONTRACTOR SHALL COORDINATE AND CONFIRM THE EXACT LOCATION OF THE EXISTING POWER PANELS FROM <br />WHICH NEW CIRCUITS ARE BEING FED. ADDITIONALLY, THE CONTRACTOR SHALL VERIFY EXISTING BRANCH CIRCUIT <br />BREAKERS AND PROVIDE NEW BRANCH CIRCUIT BREAKERS AS NECESSARY FOR A COMPLETE AND OPERABLE SYSTEM. <br />24. THE CONTRACTOR SHALL COORDINATE AND CONFIRM THE EXACT LOCATION OF THE TELECOM ROOM FROM WHICH NEW <br />TELEPHONE/DATA OUTLETS WILL BE FED. ADDITIONALLY, THE CONTRACTOR SHALL VERIFY EXISTING PATCH PANEL <br />SPACES AND PROVIDE NEW PATCH PANELS AS NECESSARY TO LAND/TERMINATE NEW TELECOM CABLING. <br />25, AS REQUIRED, EXISTING FLOOR DUCT JUNCTION BOXES AND RECEPTACLES SHALL BE RELEVELED AND REPAIRED TO <br />MATCH THE FINISHED FLOOR WITHOUT REQUIRING ADDITIONAL COST TO THE PROJECT. <br />NEW CIRCUIT UNMARKED CONDUITS <br />CONTAIN 2CONDUGTORS. <br />10 <br />PANEL HOMERUN 3/4" <br />LIGHTING OR MINIMUM RACEWAY <br />POWER OUTLETS UNLESS NOTED THREE POLE <br />OTHERWISE BREAKER <br />EA-1(3,5) <br />NO, OF CONDUCTORS 4-12-3/4"C. <br />SIZE OF CONDUCTORS <br />SIZE OF RACEWAY <br />ISOLATED GROUND CIRCUITRY <br />C-1,3,5 <br />6-10CU-1"C <br />3-10CU ISOLATED GND <br />1-10CU EQUIPMENT GND <br />THREE SINGLE POLE CIRCUITS <br />A-1,3,5 <br />6-10CU-3/4"C <br />1®10CU EQUIPMENT GND <br />LIGHTING NOTES: <br />26. ANY FLUORESCENT LIGHT FIXTURES WITH EXISTING T12 OR T8 TYPE LAMPS WITHIN THE STORE SHALL BE REPORTED TO <br />THE KROGER PROJECT MANAGER BY THE ELECTRICAL CONTRACTOR FOR COORDINATION OF REPLACEMENT. <br />27. EXISTING LED LIGHT FIXTURES SHALL REMAIN. INSPECT FOR PROPER OPERATION. CLEAN AND REFURBISH AS REQUIRED. <br />COORDINATE IF A NEW FIXTURE IS NEEDED WITH KROGER PROJECT MANAGER. <br />28. THE EXISTING VESTIBULE AND EXTERIOR WALL PACK LIGHT FIXTURES SHALL BE INSPECTED FOR OPERATION, CLEAN AND <br />REFURBISH AS REQUIRED. ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL LIKE TYPE LAMPS FOR EXISTING <br />FIXTURES THAT ARE NOT OPERATING. <br />29. THE QUEVISION SENSING DEVICE LOCATIONS SHALL HAVE PRIORITY OVER THE INTERIOR LIGHTING PATTERN. WHERE <br />INTERFERENCE OCCURS, THE CONTRACTOR SHOULD ADJUST THE LIGHTING PATTERN AS NEEDED TO ACCOMMODATE <br />THE REQUIREMENTS OF THE QUEVISION SENSING DEVICES. CONTRACTOR TO COORDINATE ALL ADJUSTMENTS WITH THE <br />QUEVISION INSTALLATION REPRESENTATIVE AND THE KROGER PROJECT MANAGER. <br />30. ALL BATTERY -POWERED OR CONTINUOUS BURN LUMINAIRES SHOWN ON THE PLANS, SUCH AS EXIT LIGHTS, NIGHT <br />LIGHTS, OR EMERGENCY LIGHTS, SHALL BE CONNECTED TO THE UNSWITCHED LEG OF THE LIGHTING CIRCUIT FEEDING <br />THAT AREA. <br />31. LUMINAIRES INSTALLED IN THE MECHANICAL ROOMS SHALL BE PLACED SO THAT ALL EQUIPMENT IS ADEQUATELY <br />ILLUMINATED AFTER THE MECHANICAL EQUIPMENT IS IN PLACE. <br />32. ALL LUMINAIRES SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE, NOT THE CEILING GRID OR OTHER <br />NONSTRUCTURAL MEMBERS. <br />33. TO ACHIEVE AND MAINTAIN A CONSISTENT LIGHT QUALITY, FOR ALL SUPPLIED AND INSTALLED LAMP TYPES, LAMPS <br />SHALL BE OF THE SAME MANUFACTURER, COLOR TEMPERATURE, COLOR RENDERING INDEX, LAMP EFFICACY, LUMEN <br />OUTPUT, AND STARTING CHARACTERISTICS. <br />34. LUMINAIRES INSTALLED IN DAMP OR WET LOCATIONS SHALL BE UL LISTED FOR INSTALLATION IN THE ENVIRONMENT, <br />CAR€ SHOULD BE TAKEN TO ENSURE THAT DIFFUSERS AND LENSES ARE APPROPRIATE FOR THEIR INSTALLED USE, AND <br />PREMATURE DISCOLORATION WILL NOT RESULT DUE TO EXPOSURE TO UV LIGHT, CHEMICALS, OR OTHER CONDITIONS. <br />POWER NOTES; <br />35. ALL ELECTRICAL CONDUITS IN THE SALES AREA DESCENDING FROM ROOF FRAMING TO EITHER LOW WALLS OR <br />EQUIPMENT SHOULD BE COORDINATED AND GROUPED WITH OTHER MECHANICAL PIPES. <br />36. INSTALL JUNCTION BOX AND CIRCUIT TO POWER TWO QUEVISION HANGING FLAT -SCREEN MONITORS, CONFIRM THE <br />EXACT LOCATION OF THE MONITORS WITH QUEVISION INSTALLER OR KROGER PM BEFORE INSTALLING JUNCTION BOX. <br />QUEVISION INSTALLER TO INSTALL THE 120-VOLT CONVENIENCE OUTLET ON HANGING MONITOR POLE/BRACKET AND <br />MAKE THE FINAL CONNECTION AT THE JUNCTION BOX. <br />37. LOCATE ALL OVERHEAD ELECTRICAL DROPS TO SHELVING AT THE CENTER OFF THE SHELVING RUN. RUN CONDUIT <br />VERTICALLY FROM A JUNCTION BOX AT THE ROOF FRAMING TO THE TOP OF THE SHELVING UNIT. SECURE CONDUIT TO <br />THE TOP OF THE SHELVING AND PAINT TO MATCH COLUMNS. <br />38. UNLESS OTHERWISE NOTED, MOUNT ALL DISCONNECTS AT 5-0" ABOVE FLOOR FINISH TO THE DISCONNECT HANDLE. <br />39. THE CONTRACTOR SHALL COORDINATE THE EXACT LOCATIONS OF ALL EQUIPMENT AND ELECTRICAL CONNECTIONS <br />WITH THE FRED MEYER RELAY MANAGER, KROGER PROJECT MANAGER, AND FINAL FIXTURE PLAN BEFORE ROUGH -IN. <br />UNLESS OTHERWISE DIRECTED, THE CONTRACTOR SHALL MAKE THE FINAL CONNECTION FOR ALL EQUIPMENT. THE <br />CONTRACTOR SHALL OBTAIN WIRING DIAGRAMS FROM THE EQUIPMENT SUPPLIER FOR ALL EQUIPMENT BEFORE ANY <br />ROUGH -IN. ANY INCORRECT WIRING OR DEVICES INSTALLED BY THE CONTRACTOR WITHOUT A WIRING DIAGRAM SHALL <br />BE CORRECTED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL PROVIDE COPIES OF WIRING DIAGRAMS <br />WITHIN EACH PIECE OF EQUIPMENT AND ADDITIONAL COPIES WITH THE OPERATION AND MAINTENANCE MANUALS. <br />40. THE CONTRACTOR SHALL COORDINATE WITH THE MECHANICAL CONTRACTOR TO PROVIDE CONDUIT AND DEVICE <br />MOUNTING BOXES FOR THERMOSTATS AND OTHER MECHANICAL CONTROLS. REFER TO THE MECHANICAL PLANS FOR <br />THE LOCATION OF THERMOSTATS. <br />41. THE CONTRACTOR SHALL PROVIDE A 20-AMP, 120-VOLT RECEPTACLE INSTALLED AT AN ACCESSIBLE LOCATION FOR THE <br />SERVICING OF ALL HEATING, AIR CONDITIONING, AND REFRIGERATION EQUIPMENT PER NEC ARTICLE 210.63. THE <br />RECEPTACLE SHALL HAVE GFCI PROTECTION, AND BE INSTALLED IN A CAST METAL BOX WITHIN 25 FEET OF THE <br />EQUIPMENT IT SERVES. <br />42. ALL SINGLE-PHASE RECEPTACLES 50-AMPS OR LESS AND THREEaPHASE RECEPTACLE5100-AMPS OR LESS THAT ARE <br />INSTALLED WITHIN 6-FEET OF A SINK SHALL HAVE GROUND -FAULT CIRCUIT -INTERRUPTER PROTECTION FOR PERSONNEL <br />PER NEC ARTICLE 210.8(B)(2). <br />ROOF NOTES: <br />43. THE CONTRACTOR SHALL INSTALL A ROOF JACK (BOOT) FOR ALL CONDUIT PENETRATIONS THROUGH THE ROOF, ALL <br />ROOF PENETRATION SEALS SHALL BE IN ACCORDANCE WITH THE ROOF WARRANTY AND BE COMPLETELY SEALED WITH <br />ROOF ADHESIVE. THE CONTRACTOR SHALL USE PROPER CLAMPING METHODS TO SEAL BOOT AROUND THE CONDUIT. <br />KITCHEN NOTES: <br />44. THE ONLY SURFACE -MOUNTED CONDUIT PERMITTED IN THE DELI AND BAKERY PREP ROOMS SHALL BE ON THEIR COOLER <br />AND FREEZER WALLS AND CEILINGS. <br />45. NO SURFACE MOUNTED CONDUIT IS ALLOWED IN MEAT AND PRODUCE PREP ROOMS. <br />46. FOR ALL APPLIANCES WITHOUT A CORD -AND -PLUG CONNECTION, THE CONTRACTOR SHALL VERIFY THE APPLIANCE <br />INCLUDES A UNIT SWITCH COMPLYING WITH NEC ARTICLE 422.34 AND HAS OTHER MEANS FOR DISCONNECTION PER NEC <br />ARTICLE 422.34(A) THROUGH (D). IF THE APPLIANCE HAS NO UNIT SWITCH, THE CONTRACTOR SHALL PROVIDE A <br />LOCKABLE MEANS OF DISCONNECT COMPLYING WITH NEC ARTICLE 110.25. <br />47. ALL SINGLE-PHASE KITCHEN RECEPTACLES 50-AMPS OR LESS AND THREE-PHASE KITCHEN RECEPTACLES 100-AMPS OR <br />LESS SHALL HAVE GROUND -FAULT CIRCUIT -INTERRUPTER PROTECTION FOR PERSONNEL PER NEC ARTICLE 210.8(B)(2). <br />REFRIGERATION NOTES: <br />48. ALL ELECTRICAL CONDUITS TO REFRIGERATED CASES SHALL BE COORDINATED AND GROUPED WITH REFRIGERATION <br />PIPING PIPES. <br />49. THE CONTRACTOR SHALL COORDINATE THE EXACT LOCATIONS OF ALL REFRIGERATION EQUIPMENT AND ELECTRICAL <br />CONNECTIONS WITH THE FRED MEYER RELAY MANAGER, KROGER PROJECT MANAGER, FINAL FIXTURE PLAN, AND THE <br />REFRIGERATION CONTRACTOR BEFORE ROUGH -IN. UNLESS OTHERWISE DIRECTED, THE CONTRACTOR SHALL MAKE THE <br />FINAL CONNECTION FOR ALL EQUIPMENT. THE CONTRACTOR SHALL OBTAIN WIRING DIAGRAMS FROM THE EQUIPMENT <br />SUPPLIER FOR ALL EQUIPMENT BEFORE ANY ROUGH -IN. ANY INCORRECT WIRING OR DEVICES INSTALLED BY THE <br />CONTRACTOR WITHOUT A WIRING DIAGRAM SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR <br />SHALL PROVIDE COPIES OF WIRING DIAGRAMS WITHIN EACH PIECE OF EQUIPMENT AND ADDITIONAL COPIES WITH THE <br />OPERATION AND MAINTENANCE MANUALS. <br />50. THE CONTRACTOR SHALL PROVIDE WEATHERPROOF BOXES, <br />51. THE CONTRACTOR SHALL PROVIDE EMPTY CONDUITS AS REQUIRED FOR ALL REFRIGERATION CONTROLS WIRING AND <br />COORDINATE ALL REFRIGERATION CONTROLS WORK WITH THE EMS CONTRACTOR AND PLANS. THE EMS CONTRACTOR <br />PROVIDES WIRING AND MAKES THE FINAL CONNECTIONS FOR ALL REFRIGERATION CONTROLS. <br />ArchitectureInteriors <br />PlanningEngineering <br />Portland, OR <br />503.224.9560 <br />!Vancouver, WA <br />360.695.7879 <br />Seattle, WA <br />206.749.9993 <br />www.mcknze.com <br />MACKENZIE <br />DESIGN DRIVEN ICLIENT FOCUSED <br />Client <br />FRED MEYER <br />PORTLAND, OR 97202 <br />Jc6m eafM sY�ga <br />Project <br />FRED MEYER #458 <br />MILL CREEK <br />12906 TLL- <br />T HWY <br />EVERETT, WA 98208 <br />Mechanical/Electrical <br />Engineering Consultants Incorporated <br />303 Federal Way Boise, ID 83705 <br />Pho�ie:308.376.9$20:FtLY.2t}�.376.4322 <br />NVIIV- .eciboise,coin <br />® MACKENZIE <br />2020 ALL RIGHTS RESERVED <br />THESE DRAWINGS ARE THE PROPERTY OF <br />MACKENZIE AND ARE NOT TO BE USED <br />OR REPRODUCED IN ANY MANNER, <br />WITHOUT PRIOR WRITTEN PERMISSION <br />Revision Schedule <br />Revision Delta I Issue Date <br />E1.2.2 <br />SPECIALTY LIGHTING PLAN - PRODUCE, HSW AND DETAILS <br />E1.3.1 <br />POWER PLAN - AREA 1 <br />DRAWN BY: ZES <br />E1.3.2 <br />POWER PLAN - AREA 2 <br />E1.3.3 <br />POWER PLAN - AREA 3 <br />CHECKED BY: KSL <br />E 1.3.4 <br />POWER PLAN - AREA 4 <br />E1.3.5 <br />POWER PLAN - AREA 5 <br />E1.3.6 <br />POWER PLAN - AREA 6 <br />SHEET <br />E1.3.7 <br />POWER PLAN - AREA 7 <br />E1.3.8 <br />POWER PLAN -AREA 8 AND DETAILS <br />E1.3.1.1 <br />REFRIGERATION POWER PLAN <br />E1.3.1.2 <br />REFRIGERATION DEFROST PLAN <br />EOw 1 <br />E1.5 <br />ELECTRICAL DIMENSION PLANS <br />E4.1 <br />ENLARGED POWER PLAN - BAKERY, DELI AND EQUIPMENT SCHEDULE <br />E5.1 <br />ELECTRICAL STANDARD DETAILS <br />E6.2.1.1 <br />PANEL SCHEDULES <br />E6.2,1.2 <br />PANEL SCHEDULES <br />F1.2 <br />FIRE ALARM PLAN <br />JOB NO <br />