Laserfiche WebLink
12.4 12 11.5 11 (14 <br />10 9.5 (9 8.5 8� 7.5 (7 <br />POWER DEMOLITION PLAN <br />SCALE: 1 "=20'-0" <br />NDRTH <br />5 4.5 4) 3.5 3 2 1.5 <br />0 KEYNOTES: <br />ALL KEYNOTES MAY NOT APPLY TO THIS SHEET. <br />1. MAINTAIN POWER TO ALL DOWNSTREAM EQUIPMENT. OTHERWISE, DEMO CONDUIT AND <br />CONDUCTORS BACK TO SOURCE PANEL. UPDATE PANEL SCHEDULE, MARKING UNUSED CIRCUITS AS <br />SPARE. <br />2. DISCONNECT EXISTING EQUIPMENT AND MAKE PROVISIONS TO EXTEND AND RECONNECT EXISTING <br />CIRCUITS TO NEW EQUIPMENT, MAINTAIN POWER TO ALL DOWNSTREAM EQUIPMENT. <br />3. DISCONNECT AND REMOVE EXISTING HORN/STROBE AND SMOKE DETECTOR, SEE FIRE ALARM PLAN <br />FOR DETAILS. ALL OTHER DEVICES TO REMAIN. <br />■ No <br />Architecture - Interiors <br />Planning - Engineering <br />Portland, OR <br />503,224.9560 <br />Vancouver, WA <br />zcn cnF- -70-7n <br />Client <br />FRED MEYER <br />STORES INC <br />3800 SE 22ND AVE <br />PORTLAND, OR 97202 <br />FredUeyer. <br />Project <br />FRED MEYER #458 <br />MILL CREEK <br />12906 BOTHELL- <br />EVERETT HWY <br />EVERETT, WA 98208 <br />Mechanical/Electrical <br />4 <br />Engineering Consultants Incorporated <br />303 Federal Way Boise, ID 83705 <br />Phone: 208.376,9820 Fax: 208.376.9822 <br />xvik- .eciboise.com <br />04kAER SCOT <br />WAS, i, , <br />DATE: 02/ 13/2020 <br />© MACKENZIE <br />2020 ALL RIGHTS RESERVED <br />THESE DRAWINGS ARE THE PROPERTY OF <br />MACKENZIE AND ARE NOT TO BE USED <br />OR REPRODUCED IN ANY MANNER, <br />WITHOUT PRIOR WRITTEN PERMISSION <br />Revision Schedule <br />Revision Delta I Issue Date <br />SHEET TITLE: <br />POWER <br />DEMOLITION <br />PLAN <br />DRAWN BY: ZES <br />CHECKED BY: KSL <br />SHEET <br />ED1 <br />2 <br />■ <br />JOB NO.2190236.00/20VO4 <br />PERMIT SET: 02/17/2020 <br />